HomeMy WebLinkAbout2016/01/06 - ADMIN - Agenda Packets - Planning Commission - RegularAGENDA
PLANNING COMMISSION
COUNCIL CHAMBERS
6:00 P.M.
JANUARY 6, 2016
1. Call to order – Roll Call
2. Approval of Minutes of October 21, 2015
3. Hearings
A. Japs Olson West Expansion
Comprehensive Plan Amendment, Rezoning, Plat and Conditional Use Permit
Location: 7500 and 7630 Excelsior Boulevard
Applicant: Japs Olson Company
Case Nos.: 15-46-CP, 15-47-Z, 15-48-CUP, 15-49-S
4. Other Business
A. Election of Chair and Vice Chair
B. Resolution of Recognition Robert Kramer
5. Communications
6. Adjournment
If you cannot attend the meeting, please call the Community Development Office, 952/924-2575.
Auxiliary aids for individuals with disabilities are available upon request. To make arrangements, please
call 952/924-2575 at least 96 hours in advance of meeting.
UNOFFICIAL MINUTES
PLANNING COMMISSION
ST. LOUIS PARK, MINNESOTA
October 21, 2015 – 6:00 p.m.
COUNCIL CHAMBERS
MEMBERS PRESENT: Lynne Carper, Claudia Johnston-Madison,
Lisa Peilen, Richard Person, Carl Robertson,
Joe Tatalovich, Ethan Rickert (youth member)
MEMBERS ABSENT: Robert Kramer
STAFF PRESENT: Sean Walther, Greg Hunt, Nancy Sells
1. Call to Order – Roll Call
2. Approval of Minutes of September 16, 2015
Commissioner Tatalovich moved approval of the minutes. Commissioner Peilen
seconded the motion, and the motion passed on a vote of 4-0. (Commissioner
Robertson arrived at 6:05 p.m. Commissioner Johnston-Madison arrived at 6:14
p.m.)
3. Other Business
A. Consideration of Resolution – 4900 Excelsior TIF District Conformance
with Comprehensive Plan
Greg Hunt, Economic Development Coordinator, presented the staff report.
Commissioner Peilen asked if TIF would have been applied for if there had not
been extraordinary land costs.
Mr. Hunt said the developer wouldn’t have applied for TIF if there had not been
such an extraordinary amount of site preparation cost.
Commissioner Carper asked if the PUD had received approval from the City
Council.
Sean Walther, Planning and Zoning Supervisor, responded that preliminary plat
and preliminary PUD have been approved by the City Council. Final plat and
final PUD requests are tentatively scheduled for City Council on November 2.
Commissioner Peilen recommended approval of Resolution No. 87 finding the
Tax Increment Financing Plans for the proposed 4900 Excelsior Tax Increment
Financing District to be in conformance with the Comprehensive Plan of the City
Unofficial Minutes
Planning Commission
October 21, 2015
Page 2
of St. Louis Park. Commissioner Carper seconded the motion, and the motion
passed on a vote of 5-0.
4. Hearings
A. Comprehensive Plan amendment and Rezoning for Proposed Daycare
Location: 2460 Highway 100
Applicant: Alise McGregor
Case No.: 15-43-CP and 15-44-Z
Chair Person stated the application has been withdrawn by the applicant.
B. Westside Center – Preliminary and Final Plat;
Conditional Use Permit to Import Fill
Location: 5320 W. 23rd St.
Applicant: COB, LLC c/o Hillcrest Development, LLLP
Case Nos.: 15-40-CUP and 15-41-S
Sean Walther, Planning and Zoning Supervisor, presented the staff report.
Commissioner Carper noted the square footage of the area is about 50,000 sq. ft.
and that the new pond area is just short of 30,000 sq. ft. surface area. He also
noted the plan indicates 2,485 cubic yards of fill and 2,498 cubic yards of flood
storage capacity. He asked if the City had estimates of volumes of flooding in the
past, such as a 10-year or 100-year event.
Mr. Walther indicated the modeling done for the City considered a 100-year flood
event, which is a 1% chance in any given year of flooding to reach a certain
elevation.
Commissioner Carper asked about drainage flow area.
Mr. Walther said in general the site previously drained directly to the south and
south west to the City’s land, and then east to a catch basin. The broader sub-
regional drainage includes a larger area to the west of the site that slowly drains to
the east overland and in stormwater pipes to Twin Lakes. He said after the
development the broader area drainage patterns won’t change. However, the site
drainage will now be directed to the new stormwater pond which will hold 100-
year rain event and release the water at a slower rate to a broader stormwater
system.
Unofficial Minutes
Planning Commission
October 21, 2015
Page 3
Commissioner Carper asked if the areas of floodplain and storage pond will be
fenced in.
Mr. Walther responded that no fencing is proposed.
Commissioner Carper asked if the new pond will be a standing body of water on a
continuous basis or if it will be dry.
Mr. Walther said in general it is a dry pond.
Commissioner Carper asked for a review of the larger area, and a description of
the south part of the property, land use, foliage and the location of homes on 25 ½
St.
Mr. Walther showed an illustration and gave a review of the larger area.
Commissioner Carper mentioned comments received regarding 25 ½ St. and
flooding. He asked if the city has done anything to mitigate that in the existing
area.
Mr. Walther said there haven’t been any capital improvement projects to mitigate
flooding. He noted in the past there was a larger study to explore options
regarding potential flood storage to reduce flood risk to properties. Those options
have not been pursued.
Commissioner Carper asked about mitigation at Lamplighter Pond.
Mr. Walther said that work was done before he was on staff. The city and church
did expand the Lamplighter Pond and provided additional flood storage capacity
as well as stormwater treatment.
Commissioner Johnston-Madison spoke about the correspondence received from
Charles Dahl, 5801 W. 25 ½ St., and asked if his concerns about flooding would
be resolved by the new stormwater system.
For the record Chair Person acknowledged correspondence received from Charles
Dahl, 5801 W. 25 ½ St., regarding flood concern. Mr. Dahl suggested that
instead of adding fill, creating additional storage capacity would be in order. Mr.
Dahl also suggested a permeable surface parking lot.
Mr. Walther said the letter was just received and he doesn’t know if the city
engineer referred to in the letter was a current engineer or a previous engineer.
Mr. Walther said if the area referred to in the letter is an area south of 25 ½ St. it
may not be the same stormwater system currently being discussed.
Unofficial Minutes
Planning Commission
October 21, 2015
Page 4
Commissioner Johnston-Madison asked if the city would investigate this with the
homeowner.
Mr. Walther said the neighborhood has asked for a meeting with the Minnehaha
Creek Watershed District (MCWD), which had the modeling completed for this
project, as well as with the city engineer and himself. He said they have provided
quite a bit of background material previously, as well as maps and explanations
with our city engineer, but there has not been a sit down meeting for some time to
review the details of the information provided.
Scott Tankenoff, Managing Partner, Hillcrest Development, said since they have
commenced redevelopment last September they have leases with 11 tenants at the
property. 10-15% remains to be leased. He said they have hosted three
neighborhood meetings and they have interacted with the neighborhood on an
ongoing basis. They have provided additional real time site information for the
community on a web page.
Mr. Tankenoff spoke about the on-site parking need for Westside Center. He said
Hillcrest has a policy of not pushing its parking loads into neighborhoods. He
said the building has evolved into an employment center.
Chair Person and Mr. Tankenoff spoke about the desire to open up the site to the
existing bike trail.
Chair Person opened the public hearing.
Beth Chaplin, 5524 W. 25 ½ St., stated she believed she was speaking on behalf
of several of the neighbors. She stated that neighbors were not at the May 20th
public hearing for the first conditional use permit to fill in the floodplain. She
said the work covered under the CUP involved removal of 500 trees, many of
which are 100 ft. from their properties. The work added two acres of impervious
surface onto the floodplain very near their properties known to have flooding
concerns. The work involved the very large stormwater pond. Its southern border
is less than 100 ft. from the Musolf property next door. Ms. Chaplin said the
work has significantly affected their property values, quality of life and peace of
mind.
Ms. Chaplin stated residents weren’t at the May 20th hearing to raise these
concerns because they didn’t know it was happening. She said a notice was sent
out clearly stating that work was being done at the building, more than two blocks
from their properties. The notice didn’t mention that the work would span an
area of three acres and that it would stretch much further to the south. She said in
early July huge trees began dropping behind their yards. She said to say they
Unofficial Minutes
Planning Commission
October 21, 2015
Page 5
were shocked and alarmed is an understatement. She went on to say that of even
greater concern the documents for City Council omitted their homes from the
development property description. The map shows that there is a lengthy
southern border but no mention of the dozen homes there. She said she has no
idea why the address on the public notice was so misleading as to where the
actual work would occur. Residents requested a meeting on July 21st and asked
city staff if their properties had ever been considered in the preparation and
discussions of the CUP by staff or Council members. The effects on their
properties were never considered. She said there was another meeting in late July
attended by about 20 residents and city staff. She said they expressed their
concerns and left the meeting with what they thought was an agreement that staff
would help residents by collaborating. She said there have been discussions,
explanations and justifications, but as yet no real solutions offered by the city.
Ms. Chaplin said the Hillcrest development staff has been engaged, active,
communicative and empathetic to their concerns. She said Hillcrest has made
some small changes since the work commenced. She asked given Hillcrest’s
engagement since work began, had Hillcrest known, had residents known, had the
Council known, about the potential negative effects on residential properties prior
to approval of the first CUP, could Hillcrest have offered some greater solutions?
She said the residents think so given the response they’ve received from Hillcrest
but they’ll never know.
Ms. Chaplin said every resident along 25 ½ St. will say a major reason they
bought their homes was the forest, trees and habitat behind their properties. There
was a beautiful, quiet buffer between them and the industrial area to the north.
She said daily they now see and hear loud construction vehicles from 6 a.m. to 10
p.m. She said even when construction activities end next year, because of the
lumberyard and new ring road, they will continue to see and hear trucks and fork
lifts pass just beyond their back yards 6 a.m. to 7 p.m., without the buffer that
might have shielded their properties. She knows she couldn’t sell her house for
the price it would have received in June. The map of the flood plain projected the
flood zone stopped at the straight line of the southern property. The flood zone
doesn’t stop there.
Ms. Chaplin stated they have been asking for someone to take into account the
full extent of the entire floodplain and drainage system. There is a very distinct
slope to the west by the apartment building parking lot. She said she’s seen the
water back up in the parking lot and the water fills in the ditch behind the houses
and has come within 8-10 ft. of back doors. She said residents have received
conflicting answers to many questions. She asked how three acres of impervious
surface and stormwater pond will actually influence stormwater discharge to the
south. Do we know for sure? She said the work on the current CUP isn’t
scheduled to start until 2016. The neighbors ask to delay recommendation.
Unofficial Minutes
Planning Commission
October 21, 2015
Page 6
Hillcrest is doing great work at the business development but the residents do
mourn the loss of what they had and they worry about the potential flooding
effects in the future.
Ms. Chaplin stated they are asking to delay approval of the CUP until everyone is
100% certain that the activity covered in this CUP, along with June’s CUP, won’t
exacerbate the flooding issues. They ask that the city fully commit to a more
collaborative process to generate creative solutions to restore some of the property
values; to hold collaborative discussions with residents to discern how to restore
some of the quiet buffer between the properties and the ongoing noise and
disruption from the new active commercial lumberyard. She said they do not
want to battle with the city. They are asking for the city’s help.
Nancy Gertner, 2837 Xenwood Ave. S., asked if the 531 caliper inches of trees
would be tree plantings occurring in 2016 or if that is achieved from the trees
growth in the future.
Mr. Walther said 531 caliper inches are the total caliper inches of trees at the time
they are planted and not when they are full grown. He showed the overall site
plan and a variety of areas where plantings were preserved and where plantings
will occur. Mr. Walther spoke about the tree replacement ordinance and he
explained the formula.
Lois Solomon, 5800 W. 25 ½ St., said she is concerned about the floodplain. She
spoke about the former Sandoz parking lot proposal. She said she believes that
was denied because the parking lot surface would have pushed water back to 25 ½
St. She asked about the depth of the new pond. She asked if there would be
protection around the pond.
Kristina Smitten, Hillcrest Development, said deciduous trees will be planted in
the fall. The remainder of the plantings will occur in the spring. Regarding
floodplain she stated that Hillcrest’s engineers focused on their site. She said
Hillcrest does have permit approval from MCWD for the activities. The Army
Corps of Engineers also reviewed the entire floodplain area.
Commissioner Johnston-Madison asked if that approval process included
testimony from residents.
Ms. Smitten responded that those approvals include Hennepin County
Conservation District and the Board of Water and Soil Resources, as well as
MCWD’s own rules and regulations. That is the work they are required to do to
for floodplain and impact.
Unofficial Minutes
Planning Commission
October 21, 2015
Page 7
Mr. Walther said the MCWD sent notices to property owners within 600 ft. of the
property. When MCWD did not receive any comments, questions or concerns
within a certain time period they did not hold a public hearing.
Bryan Ziegler, 2604 Webster, stated that he was disappointed to learn that the
building expansion permit was approved without approval for adequate parking.
Hillcrest is now removing a parking lot to expand a parking lot to take over
wetland. He added that traffic for bikers is unbearable at times and dangerous.
He spoke about the curving road and existing blind spots and the additional truck
traffic to be created with the development. He recommended the developer make
a public access for the trail head.
Brian Skoog, 5500 W. 25 ½ St., asked about the length of the construction period.
He noted that his wife is a private teacher in their home. He spoke about a full
year of hardship for them due to constant noise and disruption. He asked if the
upcoming CUP construction activities will be as significant as the previous CUP
activities.
Mr. Tankenoff responded that it is not expected to be as difficult and may last
about seven weeks.
Elizabeth Skoog, 5500 W. 25 ½ St., said their property would be the most
affected if something happened in the floodplain. She pointed out the stormwater
drainage next to her house. She said current construction activities and noise have
come right along her house and it is like standing next to a highway. The loud
noise and lights have been constant 24 hours a day. Ms. Skoog said this
disruption has been very difficult as a piano teacher. She spoke about the loss of
the tree buffer. She said she is also concerned about snow removal from the
apartment building parking lot as snow gets moved right next to the stormwater
pond. She hopes someone can speak to the apartment management so snow
doesn’t get added to the pond.
Mr. Tankenoff said Hillcrest wishes to begin construction activities soon as they
need to complete leasing of the development. They can’t promise tenants parking
if it doesn’t exist. He said they have retained professionals; they have worked
with staff, communicated with neighbors. Through design and review they have
taken into account surface, depth of storm pond and volume of storm pond.
Delaying is not a good option. They have made changes where they can. They
have taken into account what they can do practically and legally. He said he
wasn’t sure what delaying does for the expansion of parking lot when it is
provided for in the engineering, in the pond, and in the compensatory storage.
The pond is nearly completed and the compensatory storage is built. These things
are in place and exist on the property. Hillcrest has signed an agreement with
Unofficial Minutes
Planning Commission
October 21, 2015
Page 8
MCWD whereby if these systems do not function as designed or are not
maintained properly there is a bond. Delaying is not sensible.
Ms. Smitten explained why using pavers on the project was not an option.
Chair Person closed the public hearing as no one else was present wishing to
speak.
Commissioner Robertson said he was sympathetic with the neighbors’ worries
and concerns. He stated he works with civil engineers and hydrologists on a daily
basis. In an era of change in environment it’s always hard to say what is the
100-year flood, what is the 100-year cycle. He said based on the best modeling
they can do he has a lot of trust that they have taken into account the situation.
He said he didn’t think delaying would come up with any different answers. It
has been engineered. The trees have already been removed and more trees are
being planted. It will take a while before the trees grow. He said that property
owner has a right to remove trees. That is the hard reality. Commissioner
Robertson said he would vote for approval.
Commissioner Johnston-Madison asked about the number of meetings held with
neighbors and said she didn’t understand why there were still doubts about the
engineering. We know nothing can be guaranteed 100%.
Mr. Walther reviewed the meeting and communications schedule. He said he
couldn’t speculate on the reasons for neighborhood’s remaining doubts regarding
the engineering other than their past experiences with flood has been disruptive,
concerning and serious.
Commissioner Carper said he would be recommending approval of the plat.
Commissioner Carper commented that the project will slightly increase by cubic
yards the holding area. He said he was sympathetic and empathetic with the
neighbors regarding trees. The property owner can remove trees. There is no
control over that. The City has ordinances regarding tree replacement.
Chair Person spoke about the recent Benilde athletic field expansion and
stormwater management. He asked Mr. Walther to discuss it.
Mr. Walther said he was not the lead staff person on the project and he was not
prepared to explain how it was designed. He said similar design and engineering
went into that project as Benilde was moving around both wooded areas and wet
areas on their site to accommodate the proposed field.
Unofficial Minutes
Planning Commission
October 21, 2015
Page 9
Commissioner Johnston-Madison summarized the Hillcrest design and
stormwater calculations and suggested that residents may want a copy of the staff
report and documents to review.
Commissioner Robertson made a motion recommending approval of the
Preliminary and Final Plat of Westside Center Izzie Addition, subject to
conditions. Commissioner Carper seconded the motion, and the motion passed on
a vote of 6-0.
Commissioner Robertson made a motion recommending approval of the
Conditional Use Permit to import approximately 2,785 cubic yards of fill
material, including 1,229 cubic yards of fill in the floodplain district, subject to
conditions. Commissioner Peilen seconded the motion, and the motion passed on
a vote of 5-1 (Tatalovich opposed).
5. Communications
A. Proposed City Commission Annual Meeting with Council Program
Mr. Walther explained that commissioners are being asked to provide
feedback regarding the City Council’s Annual Meeting with
Commissions.
B. Correspondence
6. Adjournment
Respectfully submitted,
Nancy Sells
Senior Office Assistant
Planning Commission
Meeting Date: January 6, 2016
Agenda Item 3A
3A. Japs-Olson West Expansion
Case No.: 15-46-CP, 15-47-Z, 15-48-CUP, 15-49-S
Location: 7500 and 7630 Excelsior Blvd.
Applicant: Japs-Olson Company
Robert Murphy, Chairman
Recommended
Action:
Close the public hearing.
Motion to recommend approval of the application for a Comprehensive Plan
Land Use Map Amendment as recommended by Staff.
Motion to recommend approval of the application to amend the Zoning Map,
as recommended by Staff.
Motion to recommend approval of the preliminary and final plat of Japs
Olson Addition, subject to conditions recommended by Staff.
Motion to recommend approval of a major amendment to a Special Permit to
approve a 192,000 square foot expansion, subject to conditions recommended
by Staff.
Motion to approve a Conditional Use Permit (CUP) for the export/import of
more than 400 cubic yards of material, subject to conditions recommended
by Staff.
Requests:
1. Comprehensive Plan Amendment. The request is to amend the land use map to reflect the
changes resulting from the recent municipal border adjustment between the City of St. Louis
Park and the City of Hopkins. The land attached to St. Louis Park will be added to the map
and guided Industrial, the land detached from St. Louis Park will be removed from the map.
2. Zoning Map Amendment. The request is to amend the zoning map to reflect the changes
resulting from the recent border adjustment between the City of St. Louis Park and the City of
Hopkins. The land attached to St. Louis Park will be added to the map and zoned General
Industrial (IG), the land detached from St. Louis Park will be removed from the map.
3. Preliminary/Final Plat of Japs Olson Addition. The request is for approval of a preliminary
and final plat that consolidates two unplatted properties into one platted lot.
4. Major Amendment to a Special Permit. The request is for a major amendment to an existing
special permit to allow a 192,000 square foot addition.
5. Conditional Use Permit. The request is for a CUP to allow the export/import of more than 400
cubic yards of material.
Comprehensive Plan (existing & proposed): Industrial
Zoning (existing & proposed): General Industrial (IG)
Neighborhood: Meadowbrook
Agenda Item No. 3A. Japs-Olson Company Page 2
Meeting Date: January 6, 2016
Location:
Background:
The Japs-Olson business is operating under a Special Permit that was approved in 1987. A
variance was granted in 1989 to reduce the amount of required parking spaces from 639 spaces to
586 spaces. The Special Permit was amended in 1994 to allow an addition to the building, and
another variance was approved in 1996 to allow a further parking reduction from 815 spaces to
586 spaces.
The applicant is proposing to expand its facility in the following two phases:
Phase 1: Off-site parking lot. In June of 2015, a CUP was approved to allow the required parking
to be met on a parcel located on the east side of Meadowbrook Rd. The CUP approval included a
reduction in the required parking from 1,120 parking spaces to 825 parking spaces. The parking
lot project was completed in the fall of 2015.
Phase 2: Building expansion (current application). Construction of a 192,000 square foot
addition. If approved, the expansion is planned to be completed in 2016. The expansion will be
constructed on the west side of the building where the old parking lot is located, which necessitated
the construction of the new parking lot in Phase 1. The proposed expansion also required the
acquisition of a property located in the City of Hopkins, the relocation of the municipal boundary
between the City of St. Louis Park and the City of Hopkins, and the combination of the properties
into one lot.
Agenda Item No. 3A. Japs-Olson Company Page 3
Meeting Date: January 6, 2016
The exhibit below illustrates the relocation of the municipal boundary. This was approved by both
cities in October of 2015, and approved by the State of Minnesota in November of 2015.
Municipal Boundary Change:
Building Expansion (Phase 2):
A site plan showing the proposed expansion is attached to this report. The existing building is
512,850 square feet in area. The addition is 192,000 square feet, and will result in a total building
size of 704,850 square feet.
Before the building can be constructed, the property now in St. Louis Park has to be guided
“Industrial” in the Comprehensive Plan land use map, zoned “General Industrial” in the Zoning
Map, and combined into one platted lot. The existing Special Permit also has to be amended to
reflect the expansion, and a CUP has to be approved to allow for the removal of 35,000 cubic yards
of material. Each application is summarized below in the required order of approval.
Agenda Item No. 3A. Japs-Olson Company Page 4
Meeting Date: January 6, 2016
Comprehensive Plan Amendment:
The Comprehensive Plan land use map amendment is required to provide a land use designation
for the land now in St. Louis Park, and to remove the properties from the land use map that are
now located in the City of Hopkins as a result of the municipal boundary adjustment. Staff
recommends an “Industrial” land use designation for the properties now in St. Louis Park as they
are adjacent to properties guided “Industrial”, and the applicant intends to use the property in an
industrial manner. See illustration below.
Agenda Item No. 3A. Japs-Olson Company Page 5
Meeting Date: January 6, 2016
Zoning Map Amendment:
The zoning map amendment is required to provide a zoning designation for the land now in St.
Louis Park, and to remove the properties from the zoning map that are now located in the City of
Hopkins as a result of the municipal boundary adjustment. Staff recommends a “General
Industrial” zoning designation for the properties now in St. Louis Park as they are adjacent to
properties zoned “General Industrial”, and the applicant intends to use the property in an industrial
manner consistent with that zoning district. See illustration below.
Agenda Item No. 3A. Japs-Olson Company Page 6
Meeting Date: January 6, 2016
Preliminary/Final Plat:
The applicant owns two properties. The larger property, approximately 383,447 square feet is
improved with the current Japs-Olson production facility. The other is approximately 84,310
square feet. Both properties are unplatted. The applicant is requesting to combine the properties
into one lot. This requires approval of a combined preliminary/final plat, and the vacation of
existing drainage and utility easements.
Preliminary/Final Plat: The result of the plat will be one property, Lot 1, Block 1, Japs Olson
Addition. The lot will be 22.2895 acres. A copy of the preliminary and final plat is attached for
your review.
The lot is surrounded on all sides by public streets. Ten foot wide drainage and utility easements
will be dedicated around the perimeter of the lot. The utility companies and staff have reviewed
the plat and are recommending approval. The Hennepin County review is still underway, and it
is expected to provide comments by the date of the Planning Commission meeting.
Drainage/Utility Easements: There are two easements located on the properties that will have to
be vacated prior to construction of the addition. Both easements are illustrated below.
The blue line identifies an
easement for an existing public
water main. The water main will
be relocated to Powell Road, to
accommodate the construction of
the addition. The proposal is to
vacate the easement with the
condition that the water main is
relocated. Once it is relocated,
city staff will complete the
vacation process by recording the
ordinance. The red line represents
a stormwater utility that will
likewise be relocated and vacated
prior to construction of the
addition. The ordinance to vacate
the easements requires a public
hearing at the City Council
meeting, so action is not required
by the Planning Commission.
The orange line represents a
railroad spur easement that is
shown on the preliminary plat. It
was vacated in 1998, so no further
action is needed.
Agenda Item No. 3A. Japs-Olson Company Page 7
Meeting Date: January 6, 2016
Major Amendment to the Special Permit:
The Special Permit was originally approved in 1987 to facilitate a building expansion. The Special
Permit is now required to be amended for the same reason, to facilitate the proposed 192,000
square foot expansion.
Parking Counts:
The parking lot required for the expansion was
already approved by the City in June of 2015, and
the parking lot was completed in the fall. The
approval included a reduction of 295 parking
spaces from the amount of parking spaces
required by the zoning ordinance. A breakdown
of the approved parking is illustrated in the table
to the right.
The parking lot was completed with 823 parking
spaces. Two spaces were lost when the
stormwater pond was reshaped into a more
aesthetically pleasing and natural shape.
Therefore, two spaces will be added to a parking
lot located on the Japs-Olson property on the west side of Meadowbrook Rd. This will preserve
the 825 required parking spaces approved by the city in 2015.
The off-site parking lot is protected by a covenant recorded at Hennepin County that binds this
parking lot to the Japs-Olson facility located on the west side of Meadowbrook Rd. Therefore, the
parking lot cannot be redeveloped leaving the Japs-Olson facility non-compliant to the parking
requirements.
Bicycle Parking:
City Code requires bicycle parking spaces equal to at least 10% of the required automobile parking
spaces. As noted above, with the proposed reduction, 825 parking spaces are required. Therefore,
83 bicycle parking spaces are required. All bicycle parking spaces were installed with the parking
lot improvement.
Setbacks:
The property is surrounded on all sides by public right-of-way. Therefore, staff was required to
make a determination as to which lot line would be considered the front lot line, rear lot line, and
side lot lines. The building is oriented toward Excelsior Blvd, and Excelsior Blvd is the higher
classified street, “Minor Reliever”, compared to Meadowbrook Rd which is a “Minor Collector”,
and Powell Rd which is a “Local Street”. Therefore, staff determined that the lot line adjacent to
Excelsior Blvd should be considered the front lot line. By definition, this makes the north property
line, along Powell Rd, the rear lot line, and the west and east property lines the side lot lines. The
required, existing, and proposed setbacks, resulting from this determination, are illustrated in the
table below.
Parking
West side of Meadowbrook 58 spaces
East side of Meadowbrook
(constructed) 514 spaces
East side of Meadowbrook
(Proof of parking) 237 spaces
On-street 16 spaces
Total Provided: 825 spaces
Required spaces: 1,244 spaces
Less transit reduction: 124 spaces
Total Required: 1,120 spaces
Requested Reduction: 295 spaces
Agenda Item No. 3A. Japs-Olson Company Page 8
Meeting Date: January 6, 2016
Access:
The property currently has four driveway access points on Excelsior Blvd, and six driveway access
points on Powell Road, one of which is 120 feet wide.
The applicant is proposing to remove two of the access points from Excelsior Blvd. The remaining
two will provide access for a reconstructed and expanded parking lot located in front of the
building. This parking lot provides convenient parking for visitors and office staff.
Four of the access points on Powell Rd, including the 120-foot wide access, are proposed to be
removed. This leaves two driveways to provide access for the docks located on the northwest side
of the building.
Landscaping:
The landscaping ordinance requires the greater of one tree per 50 feet of site perimeter (79 trees),
or 1 tree per 1,000 square feet of building area (192 trees). At the time of this report, the applicant
is revising the plan to show most of the trees planted on this site. Due to the volume of trees
required, they are looking to plant some of the trees on the parking lot site east of Meadowbrook
Rd. Staff agrees that planting some of the trees on the parking lot site located on the east side of
Meadowbrook Rd will improve the landscaping and aesthetics of the large parking lot.
Stormwater:
The applicant and the Minnehaha Creek Watershed District (MCWD) reached an agreement to
direct most of the stormwater generated by this site to a regional pond located on a property owned
by the MCWD in Hopkins. In 2015, the MCWD constructed the infrastructure required to
accomplish this. The remaining stormwater that is not going to the MCWD site, will be directed
to the new stormwater pond constructed on the parking lot site, east of Meadowbrook Rd. The
infrastructure required to direct the stormwater to this pond was also constructed in 2015.
The City Engineering Department has determined that as a result of the MCWD agreement, and
the infrastructure improvements completed in 2015, stormwater storage is not required on this site.
All stormwater treatment requirements will be met off-site.
Architecture:
The existing building consists of brick, stone, and glass and is therefore approximately 100% class
1 materials. The proposed addition is designed to blend with the existing building by utilizing
concrete panels with matching brick inlays, glass panels, and acid etching. The brick and glass
panels meet the class 1 criteria. The acid etching qualifies as a class 2 material.
City Code requires at least 60% of the elevation along Excelsior Blvd to meet the class 1 materials.
The combination of the existing and proposed elevation is 76% class 1, consisting of brick, stone,
and glass.
Required
Setback
Setback
Proposed Addition
Setback
Existing Building
Front 20 feet 20 feet 63 feet
Rear 10 feet N/A 65 feet
Side-West 15 feet 17 feet 257 feet
Side-East 15 feet N/A 6 feet
Agenda Item No. 3A. Japs-Olson Company Page 9
Meeting Date: January 6, 2016
City Code allows the building elevation along Powell Rd, to be reduced to 25% class 1 materials.
The combination of the existing and proposed elevations is 62% class 1, consisting of brick and
glass.
The architectural standards section of the code also requires a visual deviation along long walls.
The depth of the deviation is determined by the ratio of building height to length between the
deviations. A 1:2 ratio requires the deviation to be two feet deep. A 1:3 ratio requires the depth
to be increased to 3 feet, a 1:4 ratio requires the depth to be increased to 4 feet. This requirement
is often met by installing pilasters.
The applicant is requesting an appeal from this provision. They would like to install glass panels
that do not meet the depth requirement, but are considerably wider than the pilasters would have
been. The pilasters would have been approximately two feet wide, and they would not match any
architectural element of the existing building. The glass panels will be eight feet wide, and match
the existing windows on the south side of the building, thereby tying the architecture of the
proposed building to the existing building. The glass panels are not windows, but spandrel glass,
however the dark tinting of the spandrel glass will match the tinting of the windows on the existing
building (see photo below). Windows cannot be used on the addition due to the impact sunlight
has on the printing process.
Conditional Use Permit Analysis - Excavation:
A CUP is required when more than 400 cubic yards of material are removed from a site. The
construction of the addition will require the removal and replacement of approximately 35,000
cubic yards of soil. This equates to about 2,000 truckloads. The haul route to remove the material
will include Powell Rd to Excelsior Blvd to Hwy 100. A copy of the Haul Route is attached.
Agenda Item No. 3A. Japs-Olson Company Page 10
Meeting Date: January 6, 2016
Recommendation:
Staff recommends approval of the amendments to the Comprehensive Plan Land Use Map and
the Zoning Map.
Staff Recommends approval of the Preliminary and Final Plat of Japs Olson Addition, subject to
the following conditions:
1. The site shall be developed, used and maintained in accordance with the City Council
resolution, Official Exhibits, Development Agreement and City Code.
2. All utility service structures shall be buried. If any utility service structure cannot be buried
(i.e. electric transformer), it shall be integrated into the building design and 100% screened
from off-site.
3. A financial security in the form of a cash escrow or letter of credit in the amount of $1,000
shall be submitted to the City to insure that a signed Mylar copy of the final plat is provided
to the City.
4. Prior to starting any land disturbing activities, the following conditions shall be met:
a. Proof of recording the final plat shall be submitted to the City.
b. Assent Form and Official Exhibits must be signed by the applicant and property
owner(s).
Staff Recommends approval of the major amendment to the Special Permit to allow for a
192,000 square foot addition, with the following conditions:
1. The off-site parking lot located at 7400 Excelsior Blvd shall be protected by a permanent and
recorded covenant that preserves the parking spaces, and access to them for the facility at
7500 Excelsior Blvd.
2. The site shall be developed, used and maintained in conformance with the Official Exhibits.
a. Exhibit A: Site Plan
b. Exhibit B: Landscaping Plan
c. Exhibit C: Grading & Drainage Plan
d. Exhibit D: Building and Floor Plan
3. Spandrel glass panels as illustrated in the approved building plans are approved as substitutes
to the deviation requirements of the architectural section of the zoning ordinance.
4. The number of parking spaces required for the building as described in Exhibit A is reduced
to 825 spaces.
5. One marked crosswalk located mid-block on Meadowbrook Road is allowed. The crosswalk
shall be installed and maintained by the property owner consistent with City specifications.
6. Prior to starting any land disturbing activities, the following conditions shall be met:
a. Proof of recording the final plat shall be submitted to the City.
b. Assent Form and Official Exhibits must be signed by the applicant and property
owner(s).
c. Final construction plans for all public improvements shall be signed by a registered
engineer and submitted to the City Engineer for review and approval.
d. A preconstruction meeting shall be held with the appropriate development, construction,
private utility, and City representatives.
e. All necessary permits must be obtained.
f. A performance guarantee in the form of cash escrow or irrevocable letter of credit shall
be provided to the City of St. Louis Park for all public improvements (sidewalks, utilities,
street lights, landscaping, irrigation, etc.) and private site landscaping.
Agenda Item No. 3A. Japs-Olson Company Page 11
Meeting Date: January 6, 2016
7. All trucks used for excavation and removal of materials shall abide by the approved haul
route.
8. The site shall meet all fire lane requirements.
9. The applicant shall comply with the following conditions during construction:
a. The site shall be kept free of dust and debris that could blow onto neighboring properties.
b. Public streets shall be maintained free of dirt and shall be cleaned as necessary.
c. The Zoning Administrator may impose additional conditions if it becomes necessary in
order to mitigate the impact of excavation on surrounding properties.
Staff Recommends approval of the Conditional Use Permit to allow the excavation of
approximately 35,000 cubic yards of soil, with the following conditions:
1. All necessary permits must be obtained, including from the Minnehaha Creek Watershed
District (MCWD).
2. All trucks used for excavation and removal of materials shall abide by the approved haul
route.
3. The site shall be kept free of dust and debris that could blow onto neighboring properties.
4. Public streets shall be maintained free of dirt and shall be cleaned as necessary.
5. A financial guarantee shall be submitted to ensure the streets are kept clear and to repair
sidewalks, curbs, streets, and other public facilities that are damaged resulting from the
grading and/or hauling activities.
Attachments: Aerial Photo
Preliminary and Final Plat
Development Plans
Haul Route
Prepared by: Gary Morrison, Assistant Zoning Administrator
Reviewed by: Sean Walther, Sr. Planner
Agenda Item No. 3A. Japs-Olson Company Page 12
Meeting Date: January 6, 2016
AERIAL PHOTO
RESOLUTION NO. 88
RESOLUTION OF THE ST. LOUIS PARK PLANNING COMMISSION
In Recognition of
Your Distinguished 11 Years of Service
Toward Planning the Future of the
City of St. Louis Park
including
Service as Chair and Vice-Chair of the Planning Commission
The Planning Commission Hereby Provides This
Resolution of Commendation and Appreciation To
ROBERT KRAMER
Adopted by the Planning Commission January 6, 2016
___________________________ ____________________________
Lynne Carper Richard Person
___________________________ ____________________________
Claudia Johnston-Madison Carl Robertson
___________________________ ____________________________
Lisa Peilen Joe Tatalovich
ATTEST:
___________________________
Sean Walther
Planning and Zoning Supervisor