HomeMy WebLinkAbout2016/06/15 - ADMIN - Agenda Packets - Planning Commission - RegularAGENDA
PLANNING COMMISSION
COUNCIL CHAMBERS
6:00 P.M.
JUNE 15, 2016
1. Call to order – Roll Call
2. Approval of Minutes of May 18, 2016
3. Hearings
A. Perspectives – Conditional Use Permit
Location: 3381 Gorham Ave. and 7008 Walker St.
Applicant: Perspectives Inc.
Case No.: 16-21-CUP
B. Zoning Ordinance Amendment – Floodplain Districts
Applicant: City of St. Louis Park
Case No.: 16-23-ZA
4. Other Business
5. Communications
6. Adjournment
STUDY SESSION
1. 10 West End
If you cannot attend the meeting, please call the Community Development Office, 952/924-2575.
Auxiliary aids for individuals with disabilities are available upon request. To make arrangements, please
call 952/928-2840 at least 96 hours in advance of meeting.
UNOFFICIAL MINUTES
PLANNING COMMISSION
ST. LOUIS PARK, MINNESOTA
MAY 18, 2016 – 6:00 p.m.
COUNCIL CHAMBERS
MEMBERS PRESENT: Lynne Carper, Claudia Johnston-Madison,
Torrey Kanne, Lisa Peilen, Richard Person,
Carl Robertson, Joe Tatalovich,
Ethan Rickert (youth member)
MEMBERS ABSENT: None
STAFF PRESENT: Sean Walther, Jennifer Monson
1. Call to Order – Roll Call
2. Approval of Minutes of May 4, 2016
Commissioner Robertson moved approval of the minutes. Commissioner Peilen
seconded the motion, and the motion passed on a vote of 5-0.
Commissioner Person arrived at 6:02 p.m. Commissioner Tatalovich arrived at
6:06 p.m.
3. Public Hearings
A. Methodist Hospital Floodwall – Conditional Use Permit & Variance
Request
Location: 6500 Excelsior Blvd.
Applicant: Park Nicollet Health Services (PNHS)
Case Nos. 16-15-CUP and 16-16-VAR
Jennifer Monson, Planner, presented the staff report. The applicant requests a
Conditional Use Permit to construct a floodwall, storm sewer modifications, and
construction of compensatory storage through wetland restoration. A variance is
requested to construct compensatory floodplain storage within the existing
floodplain. Ms. Monson explained that the applicant is proposing a floodwall to
help prevent future flooding on and around the hospital.
Ms. Monson discussed the partnership between PNHS and Minnehaha Creek
Watershed District (MCWD) on the project.
Ms. Monson reviewed how the criteria for conditions of approval for the
Conditional Use Permit have been met.
Ms. Monson presented the findings for each criteria to grant the variance request.
Unofficial Minutes
Planning Commission
May 18, 2016
Page 2
Commissioner Robertson asked if the project would alleviate water backing up
through manholes which was a problem during the 2014 flood.
Robert Riesselman, PNHS, said the seepage underneath was a big problem during
the 2014 event. He said that problem will be addressed through the floodwall
design. Sean Walther, Planning and Zoning Supervisor, added that a back-flow
prevention system is part of the design on the existing on the existing stormwater
pipes that penetrate that system. Water can escape but not back into the site.
Commissioner Carper asked if the construction would create an increase in
mosquito breeding areas.
Mark Kretschmer, Barr Engineering, said there will be some standing water. Mr.
Riesselman noted that compensatory storage work will be done in the winter
when things freeze up. He said in general there will be more standing water than
less when the project is completed.
Commissioner Robertson remarked that by building the wall the footprint
decreases which adds depth and less surface. The wetlands, which are currently
degraded, will be upgraded through the project.
There was a discussion about water elevation during a 100 year flood.
Mr. Riesselman noted that the creek channel from Louisiana to Excelsior is fairly
shallow and has sometimes been dry in extreme years.
Chair Johnston-Madison opened the public hearing. As no one was present
wishing to speak the hearing was closed.
Commissioner Peilen made a motion recommending approval of the Conditional
Use Permit and variance subject to conditions recommended by staff.
Commissioner Robertson seconded the motion, and the motion passed on a vote
of 7-0.
4. Other Business
5. Communications
Mr. Walther spoke about two upcoming community workshops.
Unofficial Minutes
Planning Commission
May 18, 2016
Page 3
6. Adjournment
The meeting was adjourned at 6:25 p.m.
Respectfully submitted,
Nancy Sells
Recording Secretary
Planning Commission
Meeting Date: June 15, 2016
Agenda Item 3A
3A. Perspectives – Conditional Use Permit
Case No.: 16-21-CUP
Location: 3381 Gorham Avenue and 7008 Walker Street
Applicant: Perspectives, Inc.
Recommended
Action:
Motion to recommend approval of the Conditional Use Permit (CUP) subject
to conditions recommended by Staff.
Description of Request:
Requested is a Conditional Use Permit to locate 39 parking spaces required for Perspectives Inc.
to a parking lot located at 7008 Walker Street.
Location:
Agenda Item No. 3A Conditional Use Permit – Perspectives Page 2
Meeting Date: June 15, 2016
Background:
Comprehensive Plan: Perspectives – Commercial
Parking lot - Industrial
Zoning: Perspectives – Commercial
Parking lot - General Industrial (IG)
Neighborhood: Lenox
Request: In 2015, Perspectives purchased 7008 Walker Street and demolished the small building
located on the property with the intent of constructing a parking lot to meet their parking needs
and to provide parking for a future expansion at their facility located across the street at 3381
Gorham Avenue.
Construction of the parking lot is nearly complete, however, Perspectives cannot count the parking
spaces toward their number of parking spaces required by the zoning ordinance for the operations
they are conducting at 3381 Gorham Avenue until a Conditional Use Permit (CUP) is approved
authorizing the off-site parking, and the conditions of the CUP are met.
About Perspectives: The following summary of who Perspectives is, and what they do, was taken
from their website, www.perspectives-family.org.
Perspectives started in 1976 by a small group of women committed to increasing awareness around
chemical dependency and its consequences. Now four decades later Perspectives has grown into
an award winning, multi-program, human service agency for women and their children suffering
from addictions, mental illness, and poverty. Their goals are to:
Maintain sobriety
Improve mental health
Enhance a child’s academic and social skills
Improve employability
Reunite parents with their children
Decrease child abuse
Increase parenting skills
Augment healthy life styles of children with daily nutrition
Build community
Advance citizenship
The services offered are extensive and span from recovery and mental health programs to
employment and parenting education. Perspectives is the only supportive housing program that
provides a 12-month, in-house academic, social, and nutritional enrichment program for children.
Their programs successfully return 83% of their residents to permanent housing. They have been
recognized by 25 awards both nationally and locally, and nearly 100% of their clients reside in
Hennepin County. Self-sufficiency is at the foundation of all their programs.
Agenda Item No. 3A Conditional Use Permit – Perspectives Page 3
Meeting Date: June 15, 2016
Zoning Analysis: The following is an analysis of the zoning requirements for the parking lot and
the requested CUP.
Parking Lot: Parking lots are permitted as a principal land use in the I-G General Industrial zoning
district, therefore the parking lot permit was administratively reviewed. The permit has not been
finaled, as staff is waiting for a revision to the plans showing two additional trees to be planted
along Gorham Avenue, and a public sidewalk to be installed along Gorham Avenue. Staff is
recommending a condition to the CUP that the parking lot must receive final approval from the
city stating that all building, zoning, and engineering requirements have been met prior to allowing
the parking to satisfy minimum parking requirements for 3381 Gorham Avenue.
Conditional Use Permit: The zoning ordinance requires a minimum number of parking spaces for
all uses. The number of spaces required depends upon the use occurring at the property. The
parking spaces are required to be located on the same property as the use, except that, the property
owner may also count the on-street parking spaces located adjacent to their property.
The property owner may apply for a CUP to locate some, or all, of the required parking spaces on
a separate parcel. As part of the application, the applicant needs to demonstrate that the property
meets the following conditions:
(1) Paved pedestrian access shall be provided and maintained between the off-site parking
facility and the principle structure.
(2) The off-site parking facility shall be located no farther than 300 feet from a residential
structure and no farther than 500 feet from a non-residential structure. Shuttle service may
be provided as an alternative means of access for non-residential uses.
(3) Off-site parking facilities shall be protected by an irrevocable covenant recorded by the
County. A certified copy of the recorded document shall be provided to the Zoning
Administrator within 60 days after approval of the agreement by the City Council.
Staff finds that all conditions can be met. An analysis of the conditions follows:
(1) Paved pedestrian access shall be provided and maintained between the off-site parking
facility and the principle structure.
There is a sidewalk along Walker Street that leads to the intersection of Walker Street and
Gorham Avenue. There
is also a sidewalk that
extends from the
parking lot to the
existing sidewalk along
Walker Street at the
intersection. To meet
this requirement,
Perspectives will install
a crosswalk across
Gorham Avenue and a
sidewalk along the east Walker Street
Agenda Item No. 3A Conditional Use Permit – Perspectives Page 4
Meeting Date: June 15, 2016
side of Gorham Avenue that will bring customers and employees to the front door. (See
photograph)
(2) The off-site parking facility shall be located no farther than 300 feet from a residential
structure and no farther than 500 feet from a non-residential structure. Shuttle service may
be provided as an alternative means of access for non-residential uses.
The parking lot is located less than 100 feet from the Perspectives property. The path of
travel from the front door to the parking lot is approximately 230 feet. This condition will
be met with the construction of the sidewalk and crosswalk.
(3) Off-site parking facilities shall be protected by an irrevocable covenant recorded by the
County. A certified copy of the recorded document shall be provided to the Zoning
Administrator within 60 days after approval of the agreement by the City Council.
Perspectives owns both properties, and the agreement will be completed following the
approval of the CUP.
Recommendation:
Staff recommends approval of the Conditional Use Permit to allow Perspectives Inc. located at
3381 Gorham Avenue to locate 39 parking spaces required by the zoning ordinance to a parking
lot located at 7008 Walker Street, subject to the following conditions:
1. An irrevocable off-site parking agreement preserving the 39 spaces at 7008 Walker Street for
use by the business located at 3381 Gorham Avenue shall be recorded against both
properties. The text and content of the agreement shall be reviewed and approved by the
City Attorney, and the approved agreement shall be recorded against both properties.
2. Perspectives shall install and maintain crosswalk striping at its expense on Gorham Avenue
at Walker Street. The crosswalk shall be installed and maintained to city specifications.
3. Perspectives shall install a six foot wide sidewalk along the east side of Gorham Ave
extending from Walker Street to the first sidewalk extending from the building entrance to
Gorham Avenue. The sidewalk shall be constructed to city specifications.
4. All conditions of approval for the permit for the parking lot located at 7008 Walker Street
shall be completed, including, but not limited to the six foot wide sidewalk along the west
side of Gorham Avenue, and landscaping.
5. A financial guarantee shall be submitted to ensure the completion of the landscaping, and
sidewalk. The amount of the guarantee shall be 125% of the estimated construction cost of
the sidewalk and landscaping.
6. All necessary permits must be obtained, including from the Minnehaha Creek Watershed
District (MCWD), and the city for the sidewalks and crosswalks.
7. The site shall meet all fire lane requirements.
Attachments: Aerial Photo
Application
Parking Lot Plan
Prepared by: Gary Morrison, Assistant Zoning Administrator
Reviewed by: Sean Walther, Planning and Zoning Supervisor
Agenda Item No. 3A Conditional Use Permit – Perspectives Page 5
Meeting Date: June 15, 2016
AERIAL PHOTO
Planning Commission
Meeting Date: June 15, 2016
Agenda Item 3B
3B. Zoning Ordinance Amendment – Floodplain Districts
Case No.:
16-23-ZA
Recommended
Action:
Chair to close public hearing.
Motion to recommend approval of the Zoning Ordinance
Amendment pertaining to Division 10. Floodplain Districts
Section 36-292(f) as recommended by staff.
REQUEST:
Staff is requesting an amendment to Section 36-292(f) of the Zoning Ordinance. This section
regulates floodplain districts, and the purpose of the amendment is to allow compensatory storage
to be provided using accepted engineering practices to achieve the goal of eliminating any increase
in flood stage as a result of a project.
ANALYSIS:
The applicant for this amendment is the City of St. Louis Park in order to update the city’s
Floodplain District within the Zoning Ordinance. If Council adopts this amendment it will apply
to all properties located within Floodplain Districts within St. Louis Park, and will provide more
flexibility regarding where compensating flood storage is provided .
Floodplains are, in general, land areas which are subjected to flooding or standing water during
extreme precipitation events. These areas are defined by topographical conditions and are typically
situated adjacent to areas of water collection such as wetlands, lakes and streams. Floodplains are
therefore “flood-prone” and are hazardous to development activities if the vulnerability of those
activities exceeds an acceptable level.
Flooding events are defined in terms of their statistical frequency. A “100-year flood” or “100-
year floodplain” describes an event or an areas subject to a 1% probability in any given year. This
concept does not mean such a flood will occur only once in one hundred years, rather each year
there is a 1% chance of a flood event occurring. The frequency of inundation can also depend on
where substantial rainfall occurs in a particular season each year, or where the annual flood is
derived principally from snowmelt, certain areas of a floodplain may be inundated nearly every
year.
Federal and State regulations require cities to regulate floodplains. Floodplains are defined as flood
hazard areas along water bodies or low areas that are subject to periodic inundation during storm
events that produce heavy or sustained rainfall events. The Federal Emergency Management
Agency (FEMA) and Minnesota Department of Natural Resources (DNR) are the responsible
regulatory bodies involved. In addition, the Minnehaha Creek Watershed District also requires
permits relative to stormwater storage.
Required regulation includes the establishment of floodplain districts, permitted uses, conditional
uses, flood protection for structures, and maintenance of floodplain areas. The DNR has created
Agenda Item No 3B. – Zoning Ordinance Amendment – Floodplain Ordinance Page 2
Meeting Date: June 15, 2016
model ordinances that cities can adopt, and many cities adopt these verbatim. In 1976, the City of
St. Louis Park adopted and has periodically amended a Floodplain ordinance which regulates
development and management of floodplain areas within the City. This ordinance includes a
provision which requires filling within the floodplain be off-set with compensatory storage located
outside the floodplain.
Compensatory storage is a provision that ensures that development within the floodplain will not
increase the elevation of the floodwaters. Each watershed holds a specific volume below the flood
elevation. When fill material or buildings are placed in the floodplain, the flood storage areas are
diminished and flood elevations will go up because there is less room for the floodwaters. The
compensatory storage requirement maintains flood storage by ensuring any fill materials will be
replaced by an equal volume of storage space.
St. Louis Park’s requirement that compensatory storage be located outside of the floodplain is
unique. Federal, State and Watersheds to not require this provision in managing the floodplain,
and it is not included in the model ordinance. This additional requirement has created the need for
variances within the city. City staff has reviewed the impact of this requirement on projects with
public benefit and has determined that it has unnecessarily increased cost and is impractical as a
floodplain management tool.
While it is unclear why the city adopted such a restrictive rule for compensatory storage, it is safe
to assume that the intent was to discourage development from altering floodplain areas. The
existing rule requires that if an applicant wishes to fill in the floodplain, they must have land
available outside the floodplain to create compensatory storage. This essentially forces a land
exchange of upland (land out of the floodplain) for filling within the floodplain. While this rule
may have discouraged projects in the floodplain, it does not add flood protection to the city and
may add to the existing footprint of the flooded areas.
The rule has also had negative impact on infrastructure and flood protection projects. In areas of
limited space and available upland, the rule forces flood protection projects to find upland far from
the project to meet the storage requirements. The proposed amendment would allow any required
compensatory storage to be constructed within the existing floodplain, following the natural water
patterns in the area.
The City of St. Louis Park Planning Commission has recently recommended approval for a
variance request allowing compensatory storage be located within the existing floodplain at
Methodist Hospital. There are currently an additional two projects which this rule would impact
including city bridge replacement projects such as the West 37 th Street Bridge the Louisiana
Avenue Bridge replacements. The rule would also likely impact all future bridge replacements
across Minnehaha Creek. To avoid future variance requests of a similar nature, city staff advise
updating the city’s Zoning Ordinance to allow compensatory storage both within and outside the
existing floodplain.
Zoning Amendment:
(f) Compensating storage. The city may approve such structure, fill, deposit,
obstruction or storage of materials or equipment if it otherwise complies with the
Agenda Item No 3B. – Zoning Ordinance Amendment – Floodplain Ordinance Page 3
Meeting Date: June 15, 2016
provisions of this chapter and provision is made for compensating storage of
floodwaters displaced by the activity listed in this subsection (f). Such
compensating storage shall be located where it will achieve the goal of eliminating
a stage increase. The area where the compensating storage is proposed shall be an
area which was outside the 100-year flood zone before development as
compensating storage.
RECOMMENDATION:
Staff recommends approval of the attached amendment to the Zoning Ordinance pertaining to
Floodplains.
Attachments: Draft Zoning Amendment
Prepared by: Jennifer Monson, Planner
Phillip Elkin, Senior Engineering Project Manager
Reviewed by: Sean Walther, Planning and Zoning Supervisor
Agenda Item No 3B. – Zoning Ordinance Amendment – Floodplain Ordinance Page 4
Meeting Date: June 15, 2016
ORDINANCE NO. ____-__
AN ORDINANCE AMENDING THE ST. LOUIS PARK
CODE OF ORDINANCES DIVISION 10. FLOODPLAIN DISTRICTS SECTION
36-292(F) RELATING TO COMPENSATING STORAGE
THE CITY OF ST. LOUIS PARK DOES ORDAIN:
SECTION 1. That Section 36-292(f) of the Code of Ordinances, City of St. Louis Park,
Minnesota, is hereby amended to read as follows:
Sec. 36-292. Application of division provisions
(f) Compensating storage. The city may approve such structure, fill, deposit,
obstruction or storage of materials or equipment if it otherwise complies with the
provisions of this chapter and provision is made for compensating storage of
floodwaters displaced by the activity listed in this subsection (f). Such
compensating storage shall be located where it will achieve the goal of eliminating
a stage increase. The area where the compensating storage is proposed shall be an
area which was outside the 100-year flood zone before development as
compensating storage.
SECTION 2. This ordinance shall take effect fifteen days after its publication.
Reviewed for Administration Adopted by the City Council (DATE)
Thomas K. Harmening, City Manager Jake Spano, Mayor
Attest: Approved as to Form and Execution:
Melissa Kennedy, City Clerk Soren Mattick, City Attorney
Public Hearing/First Reading July 18, 2016
Second Reading August 1, 2016
Date of Publication
Date Ordinance takes effect
Planning Commission
Meeting Date: June 15, 2016
Study Session Item #1
EXECUTIVE SUMMARY
TITLE: 10 West End Planned Unit Development
RECOMMENDED ACTION: No action at this time. Staff and representatives from Ryan
Companies will be providing an overview of the office concept plan for Phase IV of the overall
Central Park West Planned Unit Development.
SUMMARY: The Excelsior Group and Ryan Companies are preparing a Planned Unit
Development application for a 11-story, 335,710 square foot Class A office building at 1601 Utica
Avenue S. The building is Phase IV of the Central Park West Planned Unit Development and will
construct the building and one half of a planned parking structure, providing 1,200 stalls.
Key features include approximately 5,000 square feet of shared outdoor amenity space, 3,500
square feet of covered retail at ground level, a fitness facility, public locker rooms, and an indoor
bike room that can be accessed from the linear civic space. The design of the building incorporates
mostly Class I materials and provides a modern take on the durability of a brick warehouse
building.
NEXT STEPS: Excelsior Group and Ryan Companies intends to submit an application on June
20, 2016 and proceed with a public hearing on July 20, 2016.
SUPPORTING DOCUMENTS: Design Concept Book, Previous Central Park West Plan
Prepared by: Nicole Mardell, Associate Planner
Reviewed by: Sean Walther, Planning and Zoning Supervisor
1
DRAWING TITLE
OFFICES AT WEST END
DESIGN CONCEPT BOOK | 5.3.2016
2
37,616± SF
PROPOSED BUILDING
54,879± SF
PROPOSED BUILDING
STATE HWY. NO. 100UTICA AVENUE SUTICA AVENUE Sce Development\CIVIL\_dwg Sheet Files\SITE PLAN - West End Office.dwgSITE NO
LEGEND
CIVIL SITE PLAN
3
37,616± SF
PROPOSED BUILDING
54,879± SF
PROPOSED BUILDING
STATE HWY. NO. 100UTICA AVENUE SUTICA AVENUECIVIL SITE PLAN
4
SITE PLAN - PHASE 1
LILAC DRIVE SUTICA AVENUE SNOT TO SCALE
9
10
11
12
OFFICE PLAN - LEVEL 1
1
A
2
B
C
D
3 4 6 7 85
34' - 0"34' - 0"34' - 0"34' - 0"34' - 0"34' - 0"34' - 0"47' - 6"30' - 0"47' - 6"9
SCALE: 1/32” = 1’-0”
RETAIL
3,540 SF
OFFICE
2,140 SF
FITNESS
2,220 SF
BIKE ROOM960 SFTRASH / RECYCLE400 SFLOADING / STAGING1,510 SFMECHANICAL / BUILDING SERVICES730 SFLOADING DOCK
OFFICE
4,530 SFPLAZA ENTRY
PARK ENTRY
BUILDING DIRECTORYMEN’SBATHROOM340 SFMEN’SLOCKER340 SFWOMEN’SBATH340 SFWOMEN’SLOCKER340 SFOFFICE
4,630 SF
LEVEL 1
GROSS
RENTABLE
OFFICE USABLE
RETAIL USABLE
36,800 SF
35,310 SF
11,300 SF
3,540 SF
13
OFFICE PLAN - LEVEL 2
1
A
2
B
C
D
3 4 6 7 85
34' - 0"34' - 0"34' - 0"34' - 0"34' - 0"34' - 0"34' - 0"47' - 6"30' - 0"47' - 6"9
SCALE: 1/32” = 1’-0”
OFFICE
5,600 SF
PRE-FUNCTION
SPACE
OUTDOOR AMENITY
5,800 SF
(REQUIRES 2ND EXIT)
MECHANICAL
ENCLOSURE
SKYWAY
570 SF
SMALL
CONFERENCE
570 SF
LARGE
CONFERENCE
1,910 SF
OFFICE
4,310 SF
WOMEN’S
BATHROOM
390 SF
MEN’S
BATHROOM
390 SF
OFFICE
8,520 SF
OPEN TO BELOW
OPEN TO BELOW
LEVEL 2
GROSS
RENTABLE
USABLE
OUTDOOR AMENITY
SKYWAY
27,920 SF
26,360 SF
18,420 SF
5,800 SF
570 SF
14
OFFICE PLAN - LEVEL 5-10 SINGLE TENANT
1
A
2
B
C
D
3 4 6 7 85
34' - 0"34' - 0"34' - 0"34' - 0"34' - 0"34' - 0"34' - 0"47' - 6"30' - 0"47' - 6"9
SCALE: 1/32” = 1’-0”
LEVEL 5-10 TYPICAL
SINGLE TENANT
GROSS
RENTABLE
USABLE
OUTDOOR AMENITY
30,320 SF
28,300 SF
27,150 SF
250 SF
15
OFFICE PLAN - LEVEL 11
1
A
2
B
C
D
3 4 6 7 85
34' - 9 1/2"
34' - 0"34' - 0"34' - 0"34' - 0"34' - 0"34' - 0"34' - 0"47' - 6"30' - 0"47' - 6"127' - 3"9
SCALE: 1/32” = 1’-0”OUTDOOR AMENITY2,950 SFLEVEL 11
SINGLE TENANT
GROSS
RENTABLE
USABLE
OUTDOOR AMENITY
26,660 SF
25,030 SF
23,880 SF
2,950 SF
16
DRAWING TITLE BUILDING STACKING DIAGRAM
LEVEL 11
SINGLE TENANT
GROSS
RENTABLE
USABLE
OUTDOOR AMENITY
26,660 SF
25,030 SF
23,880 SF
2,950 SF
LEVEL 5-10 TYPICAL
SINGLE TENANT
GROSS
RENTABLE
USABLE
OUTDOOR AMENITY
30,320 SF
28,300 SF
27,150 SF
250 SF
LEVEL 3-4 TYPICAL
MULTI TENANT
GROSS
RENTABLE
USABLE
OUTDOOR AMENITY
30,320 SF
28,300 SF
25,000 SF
250 SF
LEVEL 2
GROSS
RENTABLE
USABLE
OUTDOOR AMENITY
SKYWAY
27,920 SF
26,360 SF
18,420 SF
5,800 SF
570 SF
OFFICE
LEVEL 1
GROSS
RENTABLE
OFFICE USABLE
RETAIL USABLE
36,800 SF
35,310 SF
11,300 SF
3,540 SF
LEVEL 12
MECHANICAL PENTHOUSE
GROSS 1,770 SF
CONFERENCE
OUTDOOR
AMENITY
OUTDOOR
AMENITY
OUTDOOR
AMENITY
OUTDOOR
AMENITY
SKYWAY
FROM
PARKING
RETAIL
OFFICE
DOUBLE
HEIGHT
LOBBY
FITNESS
BIKE
ROOMTOTAL
BUILDING GSF
335,710 SF
TOTAL
RENTABLE SF
315,280 SF
LEVELS
ABOVE GRADE
11
17
SITE PLAN - PHASE 2
LILAC DRIVE SUTICA AVENUE SNOT TO SCALE
18
CONCEPTUAL PHASE II MASSING
| 7Central Park West - Preliminary PUD St. Louis Park / Golden Valley, MNOctober 17, 20146 | Birdseye View - Looking WestBirdseye View - Looking East