Loading...
HomeMy WebLinkAbout17-031 - ADMIN Resolution - City Council - 2017/02/06RESOLUTION NO. 17-031 RESOLUTION ACCEPTING THE PROJECT REPORT, ESTABLISHING IMPROVEMENT PROJECT NO. 4017-2000 APPROVING PLANS AND SPECIFICATIONS, AND AUTHORIZING ADVERTISEMENT FOR BIDS FOR IMPROVEMENT PRO3ECT NO. 4017-2000 WHEREAS, the City Council of the City of St. Louis Park has received a report from the Project Manager related to the 2017 Connect the Park project; NOW THEREFORE BE IT RESOLVED by the City Council of the City of St. Louis Park, Minnesota, that: The Project Report regarding Project No. 4017-2000 is hereby accepted. 2. Such improvements as proposed are necessary, cost effective, and feasible as detailed in the Project Report. The following segments are hereby established and ordered: • Xenwood Avenue — sidewalk ( West side between 27th Sheet and 29th Street) • 36 1/2th Street — sidewalk (North side between Monterey Drive and Excelsior Boulevard) • Barry Street — sidewalk (South/West side between 26th Street and Highway 100) • Utica Avenue — trail (West side between 27th Street and North Cedar Lake Regional Trail) • 28th Street corridor — bikeway (Between Virginia Avenue and Highway 100) • Texas Avenue — bikeway (Between Minnetonka Boulevard and 28th Street) • Texas Avenue corridor — bikeway (Between Highway 7 and Cedar Lake Regional Trail) • 33rd Street — bikeway (Between Utah Avenue and Rhode Island Avenue) The plans and specifications for the making of these improvements, as prepared under the direction of the Project Manager, or designee, are approved. The Project Manager is allowed to make adjustments to these plans and specifications, such as narrowing the width of sidewalk boulevards, in cases where special circumstances exist in the field, such as the location of trees, provided that these adjustments will make a material difference in addressing any special circumstances that may exist. 5. The City Clerk shall prepare and cause to be inserted at least two weeks in the official city newspaper and in relevant industry publications an advertisement for bids for the making of said improvements under said -approved plans and specifications. The advertisement shall appear not less than ten (10) days prior to the date and time bids will be received by the City Clerk, and that no bids will be considered unless sealed and filed with the City Clerk and accompanied by a bid bond payable to the City for five (5) percent of the amount of the bid. The Project Manager, or designee, shall report the receipt of bids to the City Council shortly after the letting date. The report shall include a tabulation of the bid results and a recommendation to the City Council. No. 17-031 -2- for dministration: Adopted by the City Council February 6, 2017 AI �,J L Ik IA��i e ' g, C Manager I e Sp Mayor Attest: I� Delissaennedy, ity Jerk