Loading...
HomeMy WebLinkAbout2019/11/06 - ADMIN - Agenda Packets - Planning Commission - RegularAGENDA PLANNING COMMISSION COUNCIL CHAMBERS 6:00 P.M. NOVEMBER 6, 2019 1.Call to order – Roll Call 2.Approval of Minutes: August 21, 2019 September 18, 2019 October 16, 2019 3.Hearings A.Planned unit development major amendment to Section 36-268-PUD 9 Applicant: PLACE E-Generation One, LLC Location: 5950 West 36th Street Case No.: 19-21-PUD B.Benilde-St. Margaret’s – Major amendment to special permit Applicant: Paul May on behalf of Benilde-St. Margaret’s Location: 2501 State Highway 100 Case No.: 19-31-CUP 4.Other Business 5.Communications 6.Adjournment If you cannot attend the meeting, please call the Community Development office, 952.924.2575. Auxiliary aids for individuals with disabilities are available upon request. To make arrangements, please call the administration department at 952/924-2525 (TDD 952/924-2518) at least 96 hours in advance of meeting. 1 2 UNOFFICIAL MINUTES PLANNING COMMISSION ST. LOUIS PARK, MINNESOTA Aug. 21, 2019 – 6:00 p.m. COUNCIL CHAMBERS MEMBERS PRESENT: Lynette Dumalag, Matt Eckholm, Claudia Johnston- Madison, Jessica Kraft, Carl Robertson. MEMBERS ABSENT: Jim Beneke, Courtney Erwin STAFF PRESENT: Jacquelyn Kramer, Gary Morrison, Sean Walther 1. Call to Order – Roll Call 2. Approval of Minutes of June 5 and June 19, 2019 Commissioner Robertson made a motion to approve the minutes. Commissioner Kraft seconded the motion, and the motion passed on a vote of 5-0. 3. Public Hearings A. Implementation of former Sam’s Club land use study recommendations Applicant: City of St. Louis Park Location: 3745 Louisiana Ave Case Nos: 19-18-AZ, 19019CP, 19-20-Z Commissioner Dumalag stated she has a conflict of interest on this item and therefore will recuse herself and abstain from discussion and voting. Laura Chamberlain, consulting planner with Hoisington Koegler Group Inc. presented the staff report. Ms. Chamberlain noted city wide goals for the site include: • Support TOD • Maintain/Expand Tax Capacity • Fulfill Climate Action Plan • Provide Affordable Housing • Maximize use and efficiency She explained three scenarios that could fit on the site including employment, residential and mixed-use developments. 3 Unofficial Minutes Planning Commission Aug. 21, 2019 Page 2 Ms. Chamberlain stated direction from the city council along the transit area included mixed-use, with a housing focus for those with living-wage jobs, and optimized for pedestrian scale and parking reductions and sha red parking. Also, the council prioritized environmental concerns, and directed implementation through the comprehensive plan and zoning amendment. Ms. Chamberlain stated there were six people from the South Oak Hill neighborhood that attended a neighborhood meeting on August 8, 2019, and she noted their concerns regarding environmental contamination at the site, safety during construction, and long-term safety. Attendees also expressed concerns over traffic along Louisiana Avenue and desire for more direct communication on the SWLRT project. Chair Eckholm asked for clarification on the zoning change to the map, and asked if it will be only temporary, and then later be zoned for PUD, when a development comes into the site. Ms. Chamberlain stated yes and noted a PUD would be encouraged by staff in order for the land to be developed more consistently with the comprehensive plan. She continued, these zoning districts will be in place until a transit-oriented development district or form-based code is adopted by the city. Staff recommended approval of the resolution amending the 2040 Comprehensive Plan and recommend approval of an ordinance amending the Official Zoning Map and adding text to the Zoning Ordinance to define and regulate self-storage facilities. Chair Eckholm opened the public hearing. Julie Rappaport, 8915 West 31st Street, asked if there has been any outreach to the Three Rivers Park District, the Met Council, or the Minnehaha Creek Watershed District. She noted these groups are looking to purchase land with in first ring suburbs in order to create areas to help clean toxic land with the use of plants and gardens. She noted SLP SEEDS works on food justice and this is a viable alternative to the proposed use of this site. She noted the site would be better suited to civic use and pointed out the building is already set up for cooking, refrigeration and could house a public community commercial kitchen . Ms. Rapaport continued this would help also to create jobs and job training and supplement meals for school children, and she hoped the commission will consider alternative ideas for the site use. 4 Unofficial Minutes Planning Commission Aug. 21, 2019 Page 3 Commissioner Johnston-Madison asked if she has approached anyone outside of the city, such as those who own the property. Ms. Rapaport stated Three Rivers is looking to purchase land, and this site could allow for low-income folks living on Louisiana Avenue to use this land for growing fresh, safe foods. She stated currently there is a study being conducted on food access and security and this fits well into the comprehensive plan. She proposed an urban farm or year-round greenhouse and added there are many people who would like to come to meetings to talk about this endeavor and she encouraged the commissioners to think about alternative uses for the site. Johan Domingo Lopez, an intern at SLP SEEDS, stated he lives in Robinsdale, but is a Junior at Benilde St. Margaret. He stated he has learned much while an intern in St. Louis Park over the summer and stated this area and concept would impact youth and help them grow in a healthier sense. He stated he has been enriched through his work and has also helped his family as well, learn about food justice. He stated having a 24/7 greenhouse at the site could greatly improve the community, while also reducing carbon emissions and addressing transportation costs and the climate crisis. The Chair closed the public hearing. Commissioner Robertson stated the idea from Ms. Rapaport is very interesting, however he was skeptical that this site was appropriate, especially as it relates to SWLRT and housing. He also stated he would be interested in finding alternative sites for this public gardening concept. Chair Eckholm agreed this is an interesting idea and suggested vertical farming within the building would be an interesting idea. He added reusing the building might be an option, and he encouraged Ms. Rapaport and Mr. Lopez to continue to pursue this idea. Chair Eckholm stated if there is community support for this, it should be brought to the commission and council for discussion. Commissioner Johnston-Madison stated this is a great idea, but it would need to be incorporated into the reuse of the existing building . She asked Mr. Walther what the next step for this group might be. Mr. Walther stated looking at a civic designation for a property before it is in public or civic institution’s control would be rare. He added the zoning designations proposed do not prohibit such uses on the property. 5 Unofficial Minutes Planning Commission Aug. 21, 2019 Page 4 Mr. Walther added the city’s formal notification process did include notifying Three Rivers Park District, Metropolitan Council, Minnehaha Creek Watershed District and others in the area around the site, however to date, there has been no comments from those organizations expressing opposition to the prop osal or interest in purchasing the site. Commissioner Kraft added the ideas brought up this evening are interesting and innovative, and she hopes sites can be found within the city in order to pursue these ideas further. Commissioner Robertson made a motion recommending approval of the resolution amending the 2040 Comprehensive Plan and as well as figures, tables and text. Commissioner Johnston-Madison seconded the motion and the motion passed on a vote of 4-0-1 (Commissioner Dumalag abstained). Commissioner Robertson made a motion recommending amendments to the official zoning map. Commissioner Johnston-Madison seconded the motion and the motion passed on a vote of 4-0-1 (Commissioner Dumalag abstained). Commissioner Robertson made a motion recommending amend to the zoning code and addition of storage facilities. Commissioner Johnston-Madison seconded the motion and the motion passed on a vote of 4-0-1 (Commissioner Dumalag abstained). Mr. Walther stated this will now go to city council for the first reading on Tuesday, September 3, 2019. If approved there will be a second reading September 16, 2019. B. Size restrictions for retail and service uses in the C-1 Zoning district Applicant: City of St. Louis Park Case Nos: 19-05-ZA Gary Morrison, assistant zoning administrator, presented the staff report. Mr. Morrison discussed details and noted this will be to minimize large scale stores within the district and promote small businesses. He stated the amendment sets a maximum size limit of 7,500 square feet for retail and service uses that may be allowed administratively, and a maximum of 10,000 square feet for retail and services uses with a conditional use permit reviewed by planning commission and approved by city council. Mr. Morrison stated that staff recommends approval of the amendment. 6 Unofficial Minutes Planning Commission Aug. 21, 2019 Page 5 Chair Eckholm opened the public hearing. Chair Eckholm closed the public hearing. Commissioner Kraft made a motion recommending approval of the size restrictions for retail and service uses in the C-1 Zoning district. Commissioner Johnson-Madison seconded the motion and the motion passed on a vote of 5-0. 4. Other Business 5. New Business 6. Communications 7. Adjournment The meeting was adjourned at 6:38 p.m. 7 8 UNOFFICIAL MINUTES PLANNING COMMISSION ST. LOUIS PARK, MINNESOTA Sept. 18, 2019 – 6:00 p.m. COUNCIL CHAMBERS MEMBERS PRESENT: Jim Beneke, Lynette Dumalag, Matt Eckholm, Courtney Erwin, Claudia Johnston-Madison, Jessica Kraft, Carl Robertson. MEMBERS ABSENT: None STAFF PRESENT: Jennifer Monson, Sean Walther, GUESTS: Lance Bernard, consultant, HKGi STUDY SESSION The study session commenced at 6:00 p.m. 1. Parking approach for the Historic Walker Lake District Lance Bernard, Consultant, HKGi, presented information on the proposed parking section for the Historic Walker Lake District. He noted the goals of the parking section are to: maximize the existing parking supply, while reducing the demand to buil d additional spaces, establish parking minimum and maximum requirements, and use existing city parking processes and best practices. Ms. Monson stated most of the land uses have already been determined and those that do not fit into the plan for the area or are not allowed have been removed. Commissioner Johnston-Madison asked for clarification on which parking areas are municipal and which are private. Mr. Bernard pointed both out to the commissioners. Commissioner Robertson stated he is curious how maximums were chosen. Mr. Bernard stated the maximums came from recommendations from the Historic Walker Lake small area plan consultant and a review by HKGi of best practices nationally. Commissioner Robertson stated the city has seasonal variations related to parking. 9 Unofficial Minutes Planning Commission Sept. 18, 2019 Page 2 Mr. Bernard stated when looking at Minneapolis parking maximums, the St. Louis Park maximums are very similar to those numbers. Mr. Walther stated there is a lot of available parking in this district, that is very underutilized, both public and private. He added there are opportunities for more intense uses over time before running into any significant issues. He stated this is also being reviewed and explored with a business association that has been formed in the Historic Walker Lake area as well. Commissioner Beneke asked if these parking minimums and maximums can be utilized throughout the city. Mr. Walther stated yes, that is a possibility. Staff will look at whether this can be applied to other areas or throughout the city. Commissioner Johnston-Madison asked if stacked parking and parking ramps might be another option here. Mr. Walther stated this was discussed in the planning process, but this is a great expense to the city to both build and maintain, and this is a situation the city is trying to avoid. Mr. Bernard stated low-cost parking options which involve more pedestrian areas are being looked at as best solutions, along with already existing parking that can be put to better use. Commissioner Robertson asked if the city will require electrical charging stations will be added to any of the parking lots. Mr. Walther stated if the municipal parking lots will be completely reconstructed, then charging stations will be installed. If maintenance work allows, then conduit is installed for electrical charging stations. He noted city policy is to assess the costs of municipal parking lots to benefiting properties. Commissioner Dumalag asked if businesses will be given incentives for maintaining their existing parking requirements. Mr. Walther stated there is a pathway for businesses to request this and when city would consider this. 10 Unofficial Minutes Planning Commission Sept. 18, 2019 Page 3 Chair Eckholm asked if a business expands, where would they need to include additional parking. Ms. Monson stated it would need to be added on the business’ princip al property. She added the goal is to allow more flexible uses for parking. Commissioner Robertson asked if there is any way to increase the size of parking spaces allowed, such as compact spaces vs. regular spaces. Mr. Walther stated parking ordinances are frequently amended within the city and reviewed every 2-3 years. It is always a significant part of the development review and the costs of development. Commissioner Robertson asked if this will be instituted by the end of this year. Mr. Walther stated, yes, by the end of the year would be ideal. Chair Eckholm asked if there would be any parking time restrictions or meters used for parking. Mr. Walther stated the city, in consultation with the business association and with city council approval, removed all parking signs limiting the time in public parking areas by the commercial properties, and staff is watching to see how this goes. Time restrictions may be reinstituted, and hopefully only to resolve current, observed and verified issues. The plan also floated the idea of metered parking someday, but not at this time. Commissioner Robertson asked also about bike and motorcycle parking requirements. Mr. Walther stated bike parking is required in the city code. Chair Eckholm stated with the biking, setting up the correct infrastructure will be important in this district in order to encourage folks to bike there. Ms. Monson added that bike racks that include branding for the Historic Walker Lake district will also be installed in the public right of way and funded with grants from Hennepin County Community Works. Mr. Walther stated continue to review the parking approach for the Walker Lake District and will report back to the commission. 2. Ground floor street-facing transparency requirements 11 Unofficial Minutes Planning Commission Sept. 18, 2019 Page 4 Jennifer Monson, planner, presented the amended ordinance to the commissioners . Ms. Monson noted for all new buildings, the transparency was reduced to 50% and the area of the windows that signs could cover was not reduced since the commission last discussed the issue. She added the Walker Lake District will be included, and most of the West End already meets these requirements. Ms. Monson also displayed images and examples to illustrate the various glass tints to the commission. Commissioner Robertson agreed with the 50% minimum, adding it puts new developments on notice. Ms. Monson added there also were no changes to the section of the code allowing for some administrative decisions, in order to reduce the number of variance applications that may be generated from the ordinance. Additionally, she noted that appeals to staff decisions would be to the Board of Zoning Appeals. Commissioner Robertson stated he has objections about the screening requirements of the transformers. He stated this doesn’t make sense and is not needed, and would be hard to enforce. He suggested that be removed from the ordinance. Mr. Walther noted this is not a new provision that is being proposed. It is a long- standing regulation and no change to this code requirement is being proposed at this time. However, he agreed with Commissioner Robertson that it is difficult to control and does not always result in a better outcome functionally or aesthetically. The meeting was adjourned at 7:45 p.m. 12 UNOFFICIAL MINUTES PLANNING COMMISSION ST. LOUIS PARK, MINNESOTA October 16, 2019 – 6:00 p.m. COUNCIL CHAMBERS MEMBERS PRESENT: Lynette Dumalag, Matt Eckholm, Courtney Erwin, Claudia Johnston-Madison, Jessica Kraft, Carl Robertson. MEMBERS ABSENT: Jim Beneke STAFF PRESENT: Jacquelyn Kramer, Gary Morrison, Sean Walther 1. Call to Order – Roll Call 2. Approval of Minutes of July 17, August 7 and October 2, 2019 Commissioner Robertson made a motion to approve the minutes. Commissioner Johnston-Madison seconded the motion, and the motion passed on a vote of 6-0. 3. Public Hearings A. Zoning ordinance regarding ground floor, street facing, commercial window transparency requirements Applicant: City of St. Louis Park Case Nos: 18-70-ZA Jennifer Monson, planner, presented the staff report. Ms. Monson noted the commission has voiced support for the ordinance, but wanted to ensure the ordinance applied to all commercial areas, was flexibl e especially for existing uses and small businesses, creates few non-conforming buildings and did not unduly reduce usable space within the buildings. She added the proposed ordinance would be applicable to all ground floor street-facing facades in the C-1 and C-2 districts, and retail, service and restaurant uses in O and BP districts as well. Additional requirements are noted in the staff report. Chair Eckholm opened the public hearing. The Chair closed the public hearing. 13 Unofficial Minutes Planning Commission October 16, 2019 Page 2 Chair Eckholm thanked city staff for their work on this ordinance, adding this meets the spirit of what the city is trying to accomplish, but is also not onerous. Commissioner Johnston-Madison stated this is the result of the hard work done by staff and she supports this. Commissioner Robertson made a motion, seconded by Commissioner Dumalag, recommending approval of the ordinance. The motion passed on a vote of 6-0. 4. Other Business- none 5. Communications Mr. Walther noted the topics of the study session that followed the regular meeting stated the commission’s next regular meeting will be November 5. 6. Adjournment The meeting was adjourned at 6:08 p.m. STUDY SESSION The study session commenced at 6:15 p.m. 1. Rezoning C-2 General Commercial properties to C-1 Neighborhood Commercial. Gary Morrison, assistant zoning administrator, provided background. He pointed out Cedar Lake Road and Louisiana Avenue to be rezoned to C-1 neighborhood commercial. The commissioners had no concerns or questions about the rezoning. Additionally, Mr. Morrison noted the Texa-Tonka area to also be rezoned to C-1 neighborhood commercial. Mr. Morrison noted the Knollwood area for consideration as well. Chair Eckholm stated the area around Chick-Fil-A and the liquor store is very congested and not safe. 14 Unofficial Minutes Planning Commission October 16, 2019 Page 3 Mr. Morrison pointed out Highway 100 and Excelsior Boulevard and rezoning this to C-1 neighborhood commercial also. Commissioner Kraft asked what districts or properties are zoned for auto repair uses. Mr. Morrison stated they are allowed in industrial and C-2 district. He noted there are districts for them but not always properties available. Commissioner Robertson asked about having a discussion at a later date on allowing small auto repair shops in C-1 districts, as it seems they might be acceptable with certain conditions. Commissioner Johnston-Madison stated there are already auto repair shops along Excelsior Boulevard including Bosch, Youngsteds and the BP. Mr. Morrison stated gas stations are allowed in C-1, but auto repair shops are not. Commissioner Johnston-Madison stated the existing buildings would be allowed to continue as legal., nonconforming uses. She added they all back up into single family homes, and noted the pedestrian experience there is difficult . Mr. Morrison also pointed out additional areas on Excelsior Boulevard to be rezoned, farther to the east. Mr. Morrison noted the area at Minnetonka Boulevard and Highway 25 and also at Highway 100. The commissioners supported proceeding with the process to consider rezoning all areas that were discussed to be rezoned C-1 Neighborhood Commercial. 2. Parkway Residences development and environmental assessment worksheet. Jennifer Monson, Planner, noted the application location is immediately west of Parkway 25, west of 31st Street between Glenhurst Avenue and Inglewood Avenue. She stated currently there are 24 affordable units located here, and whatever development is proposed here will need to replace all naturally occurring affordable housing (NOAH) properties one to one and replace what is taken out. Ms. Monson noted the proposal is to redevelop the north side of 31st Street, and shared access with Parkway 25. All the parking is located within the buildings underground within the buildings, except for 3 spaces. 15 Unofficial Minutes Planning Commission October 16, 2019 Page 4 Commissioner Johnston-Madison asked if tax increment financing will be requested. Ms. Monson stated yes. Commissioner Robertson asked if all the residents of the existing buildings would be displaced. Ms. Monson stated that preliminary indications are that the developer would be attempting to relocate all the residents to comparable units in St. Louis Park and the residents that qualify would be given the opportunity to occupy available units in the new or remodeled buildings. They may even be offered relocation assistance by the developer. These steps go above and beyond the city’s policies and ordinances. Commissioner Erwin asked if there are stipulations to meeting the affordable housing requirements in all three phases. Mr. Walther stated the replacements will need to occur during phase one. Commissioner Erwin asked why the application was incomplete. Ms. Monson stated the issues were primarily related to the civil engineering stormwater management plan at the site, and more details were also needed regarding the inclusionary housing. Commissioner Robertson stated this is quite an aggressive and ambitious plan. 3. Other updates. Ms. Monson noted PLACE submitted an application to amend plans for the south side of the development, called Via Sol. She described briefly the changes to the building plans, which included a reduced number of residential units, a change to underground parking rather than an above ground structure and uses of the buildings were moved around within the proposed buildings. The parking counts and number of car free units will be a consideration and the proposed reductions may be justified given its proximity to the Wooddale Avenue light rail station. Commissioner Johnston-Madison asked if the financing is now available for this developer. Mr. Walther stated the developer has the financing for the north site, and they will be requesting development agreement extensions for both sites in mid-November from 16 Unofficial Minutes Planning Commission October 16, 2019 Page 5 the council. They also have funding for the residential units on the south site, and they are still working on financing for the hotel component. Commissioner Johnston-Madison expressed general concerns about the ability of PLACE to deliver the project and the extensions that have been needed. Chair Eckholm stated that he appreciated the many elements and lofty goals of the development. Even if this project does not come to fruition, another project will come along, so there is no concern, as ultimately there will be an affordable housing development in this location. The meeting was adjourned at 8:20 p.m. 17 18 Planning commission: Regular meeting Meeting date: November 6, 2019 Agenda item: 3a 3a Planned unit development major amendment to Section 36-268-PUD 9 Location: 5950 W. 36th Street – PLACE Via Luna Case Number: 19-21-PUD Applicant: PLACE E-Generation One, LLC Owner: City of St. Louis Park, St. Louis Park Economic Development Authority Review Deadline: 60 days: December 6, 2019 120 days: February 4, 2020 Recommended motions: Chair to close the public hearing. Motion to recommend approval of the planned unit development (PUD) major amendment subject to the conditions recommended by staff. Summary of request: PLACE E-generation One, LLC (PLACE) received approvals in 2017 to construct a mixed-income, mixed-use, multigenerational, environmentally sustainable, transit- oriented development with live/work for creatives. The developer seeks a major amendment to the PUD and proposes: • Reducing the number of units on the south site (Via Luna) from 84 units to 50 units; • Replacing the above ground parking ramp with mostly underground parking and a small surface lot for commercial uses and hotel check-ins; • Relocating the residential uses and artist studios to the west wing of the building, and the other commercial and hotel uses to east wing of the building. In general, the site plans and the building elevations remain largely unchanged, with the exception in the change of parking which is now mostly underground. Site information: Yosemite Ave 19 Regular meeting meeting of November 6, 2019 (Item No. 3a) Title: Planned unit development major amendment to Section 36-268-PUD 9 Site area (acres): 1.68 acres Current use: Surrounding land uses: Vacant building and city parking lot North: Wooddale Avenue LRT Station East: small scale commercial South: 36th Street West/TowerLight West: Wooddale Avenue South Current 2040 land use guidance Current zoning TOD - transit oriented development PUD planned unit development Background: PLACE E-generation One, LLC (PLACE) received approvals in 2017 to construct a mixed-income, mixed-use, multigenerational, environmentally sustainable, transit-oriented development with live/work for creatives. The development campus is located both north a nd south of the future Wooddale Avenue LRT Station. The previously approved development included: North Site (Via Sol and E-Generation): • 218 residential units (22 at 50% AMI, 130 at 80% AMI, 66 at market rate), including 18 live/work units; • Bike shop and makers space; • 0.88 acres of urban forest, for public access to nature, stormwater management, and habitat; • 29,500 square feet of green roof for additional stormwater management and habitat; • PLACE’s E-Generation facility on the northern site, which uses PLACE’s patent-pending portfolio of renewable energy systems to convert locally-sourced organic waste into energy for the project and a soil amendment byproduct that will be used in the onsite greenhouse; • 216 parking spaces located underground, on-street, and in a surface parking lot; • 60 car free units. South Site (Via Luna and Hotel): • 81 residential units (48 at 60% AMI, 33 at market rate), all 81 designed as live/work units; • 110-room Fairfield by Marriott hotel hiring community members; • Café, coffee house, and five microbusinesses; • Placemaking plaza at the Wooddale LRT Station; • 231 parking spaces located in a four-story parking garage; • 30 car free units. The buildings, site and program are designed to support a multigenerational creative community where households at all stages in life and income feel welcome. The development includes a mobility plan with car/bike sharing, shuttle, and car-free living incentives. The buildings will adhere to the city’s green building policy and will be designed to LEED standards. The detailed analysis of the approved plans can be found online in city council’s agenda packet for May 1, 2017. The PLACE staff report starts on page 579 of the PDF. 20 Regular meeting meeting of November 6, 2019 (Item No. 3a) Title: Planned unit development major amendment to Section 36-268-PUD 9 Present considerations: PLACE has applied for a major amendment to Section 36-268-PUD 9 for changes to the south residential site, Via Luna. The amendment would reduce the overall developments unit count from 299 to 268 residential units and the overall parking from 447 to 393 spaces. The development was also approved with 90 car free units, meaning PLACE will pay tenants of 90 units to live car free. PLACE is requesting to maintain 90 car free units. The PUD amendment would: • Reduce the number of units on the south site (Via Luna) from 81 units to 50 units. All remain live/work units. • Replace the above ground parking ramp and with mostly underground parking and a small surface lot for commercial uses and hotel check-ins; • Relocate the residential uses and artist studios to the west wing of the building; • Relocate the restaurant, coffee shop and hotel to the east wing of the building; • Remove the small dog run on the east side of the site, add outdoor rooftop patio space on the hotel, and expand the placemaking plaza near the Wooddale LRT Station; • Redesign the placemaking plaza to include more site amenities including additional landscaping and a stormwater landscape feature; • Activate Wooddale Avenue South with artist studio spaces; • Activate 36th Street West with commercial studio spaces; • Group the artist live/work studios on the first and second floor of the residential building, so they are more publicly accessible. The second floor of the west wing would be entirely studio spaces; • Better accommodate truck traffic (move ins, deliveries, trash) within the placemaking plaza and surface parking lot; • Relocate trash collection from the placemaking plaza to the surface parking lot; • Create an improved interface between the LRT station and the placemaking plaza. In general, the exterior of the buildings and the site plan remain largely unchanged, but the changes help the site function better overall. There are no proposed changes to Via Sol (the north site). Zoning analysis: Proposed zoning changes to Via Luna Approved Proposed Summary Hotel 110 rooms 110 rooms No change Residential 81 total units 48 at 60% AMI 33 market rate 50 total units All 50 at 60% AMI Reduction of 31 units. Excludes market rate units and adds 2 affordable units. All units still designed as live/work Parking Hotel: 110 spaces Residential: 63 Commercial: 54 Total: 227 Hotel: 110 spaces Residential: 30 Commercial: 43 Total: 173 Number of car free units remains unchanged. Commercial floor area is reduced and less parking is required and provided. 21 Regular meeting meeting of November 6, 2019 (Item No. 3a) Title: Planned unit development major amendment to Section 36-268-PUD 9 Approved Proposed Summary (7 EV stations) 30 car free units (9 EV stations) 30 car free units Meets EVSE requirements Bicycle Parking 159 spaces 114 spaces Code requires 71 spaces Parking: As part of the development’s overall mobility plan, PLACE received approvals to have 90 car free dwelling units. PLACE requests maintaining the previously approved 90 car free dwelling units. Utilizing the same parking reductions that were previously applied, this would give the development an excess of one parking space. If the city were to require a reduction in the overall number of car-free units equivalent to percentage of overall units removed from the development, Via Luna would have a deficit of 8 parking spaces. Staff recommends retaining the 90 car free units due to the development’s location at a light rail station and the ability for shared parking between the coffee shop, restaurant and residential uses. Additionally, the Walker Consulting parking study that was originally done for the PLACE development looked at requirements from other cities with similar surrounding land uses. These case studies, which included Minneapolis, Denver, and Portland, all allowed for greater parking reductions in similar development scenarios than what is currently requested. Public comment: Staff received a comment via email that has been submitted as part of the official public record from Sandy Woessner, who lives at 3456 Wooddale Avenue S. St. Louis Park, noting that she would prefer a mix of market rate and affordable units on both sides of the development. This email is attached to this report. Next steps: The city council is scheduled to hold the first reading of the ordinance on November 18, 2019 and the second reading of the ordinance on December 2, 2019. Construction is anticipated to start February 2019. Recommendations: Staff recommends approving the PUD major amendment with the following conditions, which shall be incorporated into the ordinance and/or planning developm ent agreement for this development: 1. The developer shall continue to work with city staff and SWLRT to coordinate construction activities, and to refine the design of the entrance driveway off Yosemite and the planting area along Wooddale Avenue South, as required by city staff. 2. The developer shall work with city staff to refine the design of the Wooddale Avenue South planting area and sidewalk, and said design shall require city administrative review and approval. 3. The developer shall adhere to the parking management plan for hotel and residential parking for Site C and Site D. 4. All Official Exhibits shall be updated to reflect the PUD major amendment prior to issuance of a building permit. 22 Regular meeting meeting of November 6, 2019 (Item No. 3a) Title: Planned unit development major amendment to Section 36-268-PUD 9 5. The site shall be developed, used and maintained in accordance with the conditions of this ordinance, approved Official Exhibits, planning development agreement and City Code. 6. All utility service structures shall be buried. If any utility service structure cannot be buried (i.e. electric transformer), it shall be integrated into the building design and 100% screened from off-site with materials consistent with the primary façade materials. 7. Prior to starting any land disturbing activities, excluding demolition, the following conditions shall be met: a. Assent Form, Official Exhibits and planning development contract shall be signed by the applicant and property owner. b. A preconstruction meeting shall be held with the appropriate development, construction, private utility, and city representatives. c. All necessary permits shall be obtained. 8. Prior to issuance of building permits, the following conditions shall be met: a. The developer shall sign the city's Assent Form and the Official Exhibits. b. A Planning Development Contract shall be amended and executed between the Developer and City that addresses, at a minimum: i. The conditions of PUD approval as applicable or appropriate. ii. The installation of all public improvements including, but not limited to: on-street parking, sidewalks and boulevard improvements and the execution of any necessary agreements related to the maintenance of such improvements including the inclusion of Special Service District #6. iii. The developer’s contribution of $48,200 to the City for regional stormwater pond improvements. iv. Developer agrees to provide art work on or near the site with city/public involvement in the selection of the location, artist, and art work. v. Easements related to electronic communication and fiber infrastructure. vi. Any necessary sidewalk easements. vii. A performance guarantee in the form of cash escrow or irrevocable letter of credit shall be provided to the City of St. Louis Park in the amou nt of 1.25 times of the costs of all public improvements (sidewalks and boulevards), and the private site stormwater management system and landscaping. viii. The developer shall reimburse City attorney’s fees in drafting/reviewing such documents as required in the final PUD approval. ix. The Mayor and City Manager are authorized to execute said Planning Development Contract. d. Final construction plans for all public improvements and private stormwater system shall be signed by a registered engineer and submitted to the city engineer for city administrative review and approval. e. Building material samples and colors shall be submitted to the city for city administrative review and approval. 9. The developer shall comply with the following conditions during construction: 23 Regular meeting meeting of November 6, 2019 (Item No. 3a) Title: Planned unit development major amendment to Section 36-268-PUD 9 f. All city noise ordinances shall be complied with, including that there be no construction activity between the hours of 10 p.m. and 7 a.m. Monday through Friday, and between 10 p.m. and 9 a.m. on weekends and holidays. g. The site shall be kept free of dust and debris that could blow onto neighboring properties. h. Public streets shall be maintained free of dirt and shall be cleaned as necessary. i. The city shall be contacted a minimum of 72 hours prior to any work in a public street. j. Work in a public street shall take place only upon the determination by the city engineer (or designee) that appropriate safety measures have been taken to ensure motorist and pedestrian safety. k. The developer shall install and maintain chain link security fencing that is at least six feet tall along the perimeter of the site. All gates and access points shall be locked during non-working hours. l. Temporary electric power connections shall not adversely impact surrounding neighborhood service. 10. Prior to the issuance of any permanent certificate of occupancy permit the following shall be completed: m. Public improvements, private utilities, site landscaping and irrigation, and storm water management system shall be installed in accordance with the Official Exhibits. 11. All mechanical equipment shall be fully screened. Rooftop equipment may be located as indicated in the Official Exhibits so as not to be visible from off -site. 12. The material used in, and placement of, all signs shall be integrated with the building design and architecture. Supporting documents: PUD ordinance, resident comment, exhibits Prepared by: Jennifer Monson, Planner Reviewed by: Sean Walther, Planning and Zoning Supervisor 24 Regular meeting meeting of November 6, 2019 (Item No. 3a) Title: Planned unit development major amendment to Section 36-268-PUD 9 Ordinance No. ___-19 Ordinance amending Section 36-268-PUD 9 The City of St. Louis Park does ordain: Section 1. The City Council has considered the advice and recommendation of the Planning Commission (Case No. 19-21-PUD). Section 2. The St. Louis Park Ordinance Code, Section 36-268-PUD 9 is hereby amended by adding underscored text and deleting strikethrough text. Section breaks are represented by ***. Section 36-268-PUD 9. (a) Development Plan The site shall be developed, used and maintained in conformance with the following Final PUD signed Official Exhibits: 1. EX-1 - PUD Exhibit 2. G001 – Cover Sheet 3. G002 – Legend 4. G003 – General Notes 5. C001 – Existing Conditions and Removals 6. C1.0 – Existing Conditions - South 7. 6. C003 – Tree Removals and Preservation Plan 8. C1.1 – Tree Preservation Plan - South 9. 7. C101 – Site Plan – Overall 10. 8. C102 – Site Plan Northwest 11. 9. C103 – Site Plan Northeast 12. 10. C101 C2.0 – Site Plan South 13. 11. C201 – Temporary Erosion Control Plan 14. 12. C301 – Grading and Drainage Plan – Overall 15. C3.0 – Grading Plan - South 16. 13. C401 – Sanitary Sewer and Watermain 17. 14. C402 – Storm Sewer Plan 18. C4.0 – Utility Plan – South 19. C5.0 – Erosion and Sediment Control Plan – South 20. C5.1 SWPPP Notes Sheet 1 - South 21. C5.1 SWPPP Notes Sheet 2 – South 22. C6.0 Detail Sheet General Site – South 23. C6.1 Detail Sheet Water and Sanitary – South 24. C6.2 Detail Sheet Storm Sewer - South 25. C6.3 Detail Sheet Erosion Control - South 26. 15. C801 – Site Details 27. 16. C802 – Site Details 17. C901 – City Std Utility Plates 18. C902 – City Std Utility Plates 19. C903 – City Std Utility Plates 25 Regular meeting meeting of November 6, 2019 (Item No. 3a) Title: Planned unit development major amendment to Section 36-268-PUD 9 20. C904 – City Std Erosion Control Plates 28. 21. C1001 – MNDOT Std Ped Curb Ramp Details 29. 22. C1002 – MNDOT Std Ped Curb Ramp Details 30. 23. L101 – Planting Plan – Overall 31. 24. L102 – Planting Plan – Northwest 32. 25. L103 – Planting Plan – Northeast 33. 26. L104L100 – Planting Plan – South 34. L500 – Landscape Details - South 35. 27. L801 – Planting Details 36. 28. V101 – Preliminary Plat 37. 29. V102 – Preliminary Plat 38. 30. V103 – Preliminary Plat 39. 31. E101 – Electrical Site Plan – Overall 40. C7.0 – Photometric Plan - South 41. 32. S001 – Site Plan 42. 33. A101 – North Building Floor Plans 43. 34. A102 – North Building Floor Plans 44. 35. A103 – North Building Floor Plans 45. 36. A104 – North Building Floor Plans 46. 37. A105 – North Building Floor Plans 47. 38. A106 – North Building Elevations 48. 39. A107 – North Building Illustrative Elevations 49. 40. A2.01 – South Building Hotel & Residential Lover Level Floor Plans 50. 41. A2.02 – South Building Hotel & Residential Level 1 Floor Plans 51. 42. A2.03 – South Building Hotel & Residential Level 2 Floor Plans 52. 43. A2.04 – South Building Hotel & Residential Level 3 Floor Plans 53. 44. A2.05 – South Building Hotel & Residential Level 4 Floor Plans 54. 45. A2.06 – South Building Hotel & Residential Level 5 Floor Plans 55. 46. A2.07 – South Building Hotel & Residential Level 6 Floor Plans 56. 47. A2.08 – South Building Hotel & Residential Level 7 Floor Plans 48. A209 – South Building Hotel & Residential Floor Plans 57. 49. A2.10 – South Building Elevations South Site Hotel & Residential Elevations & Sections 58. 50. A2.11 – Hotel Elevations South Site Hotel & Residential Elevations & Sections 59. 51. A2.12 – South Building Illustrative Elevations South Site Hotel & Residential Elevations & Sections 60. 52. A301 – E-Generation Floor Plans 61. 53. A302 – E-Generation Roof Plan 62. 54. A303 – E-Generation Elevations 63. 55. A4.01 – 3D View 56. A501 – Illustrative Sections 57. A502 – Sections 64. 58. PLACE – Envelope Proposals 65. 59. PLACE – Sustainability Proposals 66. 60. PLACE – Proof of Parking 67. 61. PLACE – Lighting Proposals 68. 62. PLACE – Parking Requirements 26 Regular meeting meeting of November 6, 2019 (Item No. 3a) Title: Planned unit development major amendment to Section 36-268-PUD 9 69. 63. PLACE – Mobility Plan (Travel Demand Management Plan) The site shall also conform to the following requirements: 1) The property shall be divided into four zones, as indicated on PUD Exhibit of the Official Exhibits. The zones shall be established by dividing the site into a northwest site, a northeast site, a southwest site, and a southeast site. The northwest site shall be called “Site A – E-Gen”, the northeast site shall be called “Site B – North” the southwest site shall be called “Site C – Hotel” “Site D – South” and the southeast site shall be called “Site D – South” “Site C – Hotel”. 2) Parking will be provided off-street in a surface lot, on-street, in structured parking, and within the public plaza. The property shall be developed with 299268 residential units, including 99 68 live/work units, a 110 room hotel, a minimum of 35,000 30,000 square feet of ground floor commercial space, 0.88 acres of urban forest, an e-generation energy facility, and a greenhouse. Parking will be provided off-street in a surface lot, on-street parallel parking, and structured parking. A total of four-hundred-forty-seven (447) three-hundred- eighty-nine (389) parking spaces will be provided: 251 223 spaces for residential units or 0.83 0.80 spaces per dwelling unit, 110 spaces for the hotel or 1.0 space per hotel room, 76 56 spaces for non-residential uses and 10 spaces for shared cars. An additional 55 spaces are required as a proof of parking as indicated on Sheet 60 66 of the Official Exhibits. Parking requirements are provided based on Sheet 62 68 of the Official Exhibits. 3) The maximum height for Site A – E-Gen shall not exceed 33 feet for the building, and 40 feet for the flute. The maximum building height for Site B – North shall not exceed 61 feet and five stories and 78 feet for the helical wind turbine. The maximum height for Site C – Hotel shall not exceed 76 70 feet and six five stories and the maximum height for Site D – South shall not exceed 79 80 feet and six stories. 4) The development site shall include a minimum of 12 percent designed outdoor recreation area based on private developable land area. 5) The development shall incorporate a Travel Demand Management (TDM) plan including: 27 Regular meeting meeting of November 6, 2019 (Item No. 3a) Title: Planned unit development major amendment to Section 36-268-PUD 9 a. The development shall offer car-free incentives for a minimum of 90 dwelling units. b. The development shall provide 10 cars available as a car share. c. The development shall provide a local shuttle until opening day of the Southwest Light Rail Green Line Wooddale Station. d. A transportation concierge program shall be maintained. e. The development shall provide car-free perks for 90 households until the site conforms to the city’s off-street parking requirements. f. The TDM plan shall be reported to the city annually for a duration of three (3) years. ******** (e) Site D – South 1) Permitted with Conditions: a. Multiple-family dwellings. Uses associated with the multiple-family dwellings, including, but not limited to the residential office, fitness facility, mail room, assembly rooms or general amenity space. b. Live-work Type I - Studio. i. All material or equipment shall be stored within an enclosed structure. ii. Operation of the home occupation is not apparent from the public right-of-way. iii. The activity does not involve warehousing, distribution or retail sales of merchandise produced off the site. iv. No person is employed at the residence who does not legally reside in the home. except that a licensed family day care facility may have one outside employee. v. No light or vibration originating from the business operation is discernible at the property line. vi. Only equipment, machinery and materials which are normally found in the home are used in the conduct of the home occupation. vii. No more than one non-illuminated wall sign limited to two square feet in area is used to identify the home occupation. viii. Space within the dwelling devoted to the home occupation does not exceed one room or forty-five (45) percent of the floor area, whichever is greater. ix. No portion of the home occupation is permitted within any attached or detached accessory building. x. The structure housing the home occupation conforms to the building code; and in the case where the home occupation is day care or if there are any customers or students, the home occupation has received a certificate of occupancy. xi. A Registration of Land Use (RLU) shall be required from the city when there is a change in tenant. c. Live-work Studio Type II. 28 Regular meeting meeting of November 6, 2019 (Item No. 3a) Title: Planned unit development major amendment to Section 36-268-PUD 9 i. Live-work uses as defined by Sec. 36-142 of city code are permitted on the first floor. ii. A Registration of Land Use (RLU) shall be approved by required from the city when there is a change in tenant. d. Commercial uses. Commercial uses are only permitted on the first and second floors, and are limited to the following: coffee shops, office, private entertainment (indoor), retail shops, service, showrooms and studios. i. All parking requirements must be met for each use per Sheet 62 of the Official Exhibits. ii. Hours of operation for commercial uses shall be limited to 6 a.m. to 12 a.m. iii. Restaurants are prohibited. iv. In vehicle sales is prohibited. e. Civic and institutional uses. Civic and institutional uses are limited to the following: education/academic, library, museums/art galleries, indoor public parks/open space, police service substations, post office customer service facilities, public studios and performance theaters. 2) Accessory Uses: a. Incidental repair or processing which is necessary to conduct a permitted use and not to exceed ten percent of the gross floor area of the associated permitted use. b. Home occupations complying with all of the conditions in the R-C district. c. Catering, if accessory to food service, delicatessen or retail bakery. d. Gardens. e. Parking lots. f. Outdoor seating, with the following conditions: i. No speakers or other electronic devices which emit sound are permitted outside of the principal structure if the use is located within 500 feet of a residential use. ii. Hours of operation shall be limited to 7:00 a.m. to 10:00 p.m. if located within 500 feet of a residential use. g. No outdoor uses or storage allowed. h. Solar panels i. Roof or building mounted solar systems may exceed the maximum allowed height in the PUD zoning district by 3 feet. Section. 3. The contents of Planning Case File 19-21-PUD are hereby entered into and made part of the public hearing record and the record of decision for this case. Section 4. This ordinance shall take effect (December 27, 2019) First reading November 18, 2019 Second reading December 2, 2019 Date of publication December 12, 2019 Date ordinance takes effect December 27, 2019 29 Regular meeting meeting of November 6, 2019 (Item No. 3a) Title: Planned unit development major amendment to Section 36-268-PUD 9 Reviewed for administration: Adopted by the City Council (December 2, 2019) Thomas K. Harmening, city manager Jake Spano, mayor Attest: Approved as to form and execution: Melissa Kennedy, city clerk Soren Mattick, city attorney 30 1 Jennifer Monson From:Sandra Woessner Sent:Monday, October 21, 2019 7:59 AM To:Jennifer Monson Subject:Re: Via CAUTION: This email originated from outside of the organization. Do not click links or open attachments unless you recognize the  sender and know the content is safe.  Sure! Address is 3456 Wooddale Ave. S., St. Louis Park, MN 55416.  On Mon, Oct 21, 2019 at 8:57 AM Jennifer Monson <jmonson@stlouispark.org> wrote:  Thanks Sandy. Would you like this email to be a part of the official public hearing records? If yes could you also include  an address where you live?   Thank you so much!   All the best,   Jennifer  From: Sandra Woessner  Sent: Monday, October 21, 2019 7:54 AM  To: Jennifer Monson <jmonson@stlouispark.org>  Subject: Re: Via  CAUTION: This email originated from outside of the organization. Do not click links or open attachments unless you recognize the  sender and know the content is safe.  Thanks for letting me know. I think there new studies that show kids in low income situations do better when housing is  spread out among those of different incomes. Not sure how I feel about one unit being all at 60% ‐ seems like it defeats  one of the purposes for providing the housing. As a neighbor ‐ would go on record as saying I would prefer that units be  a mix of market rate and affordable on both sides of development.   Thanks,  Sandy Woessner  31 2 On Mon, Oct 21, 2019 at 8:43 AM Jennifer Monson <jmonson@stlouispark.org> wrote:  Hi Sandra,   There are still two sites for PLACE. Via Sol, which is north of the LRT and is 218 units, and includes a combination of  housing at 50% area median income, 80% area median income, and market rate units. Then there is Via Luna, (the  south site), which was originally approved with 84 residential units that were a combination of 60% area median  income and market rate. Place is requesting an amendment for Via Luna to reduce the number of units to 50, which  would then all be available at 60% area median income.   Please let  me know if you have any other questions!  Best,   Jennifer  From: Sandra Woessner  Sent: Sunday, October 20, 2019 2:25 PM  To: Jennifer Monson <jmonson@stlouispark.org>  Subject: Via  CAUTION: This email originated from outside of the organization. Do not click links or open attachments unless you recognize the  sender and know the content is safe.  I am confused ‐ do the new site changes mean all affordable housing units will be in only one building?  Not sure if I  am understanding the plans. Thanks.  ‐‐   Sandra L. Woessner  32 Minneapolis, Minnesota Ph: 1-800-632-2277 Corporate Headquarters: BARR ENGINEERING CO. Project Office: Suite 200 4300 MARKETPOINTE DRIVE Fax: (952) 832-2601 www.barr.com Ph: 1-800-632-2277 MINNEAPOLIS, MN 55435 CADD USER: Jeremy J. Gacnik FILE: M:\DESIGN\23271732.00\BARR_CIVIL\PUD EXHIBIT\23271732.00_EX1_PUD EXHIBIT.DWG PLOT SCALE: 1:1 PLOT DATE: 10/27/2019 10:13 PMSCALE IN FEET 80400 A E-GEN B NORTH C HOTEL D SOUTH 33 SANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANW W W W W W W W W W W W W W W W W W W W W W W WWWW WWSANSANSANSANNSANSANFM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM SAN SAN SAN SANSANSANSANSANSANSANSANSANSANSANSANSANSAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SANSANSANSANSANSANSANS A N S A N S A N S A N S A N S A N S A N S A N S A N S A N S A N S A N S A N S A N S A N S A N S A N S A N S A N S A N S A N S A N S A N S A N S A N S A N S A N S A N S A N S A N WWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWW W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W WW WWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWW WW WW WW WW WW WW WW WW WW WW WW WW WW WW WW WW WW WW WW WW WW WW WW WWW W W W W W W W WWWWWWWWWWWWWWWWWWWWWWWWWWSAN SAN SAN SAN SAN SAN SS SS SS SS ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST STSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHPOHPOHPOHPOHPWWWWWWWWWWWW W W W W W W W W W W W W W W WWWWSTSTS STSTS STSTS GASGAS GAS GAS GASGAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS G A S G A S GA S GA S GA S G A S G A S G A S G A S G A S G A S G A S G A S G A S G A S G A S GA S GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN STSTS Minneapolis, Minnesota Ph: 1-800-632-2277 Corporate Headquarters: BARR ENGINEERING CO. Project Office: Suite 200 4300 MARKETPOINTE DRIVE Fax: (952) 832-2601 www.barr.com Ph: 1-800-632-2277 MINNEAPOLIS, MN 55435 CADD USER: Jeremy J. Gacnik FILE: M:\DESIGN\23271732.00\BARR_CIVIL\23271732.00_C1.0_EXISTING CONDITIONS.DWG PLOT SCALE: 1:1 PLOT DATE: 10/28/2019 11:40 PM1 - PLAN: EXISTING CONDITIONS 1" = 20'SCALE IN FEET 40200 GENERAL NOTES: 1. CONTRACTOR TO REMOVE ALL INFRASTRUCTURE WITHIN PROPERTY LIMITS 2. BENCHMARK: MNDOT MONUMENT BR27B65 SE, GSID STATION #91466, ELEV = 922.088 EXISTING BUILDING EXISTING TREE (TYP.) EXISTING POST EXISTING POST EXISTING CURB BENCH W 36TH STREET EXISTI N G B UI L DI N G EXISTING FENCE EXISTING EASEMENT EXISTI N G G R A V E L R O A D EXISTING EASEMENT EXISTING LIGHT (TYP.) EXISTING TREE LINE (TYP.)YOSMITE AVE SWOODDA L E A V E S EXISTING RAIL MONUMENT SIGN CONCRETE PAD PROPERTY LINE PROPERTY LINE PROPERTY LINE LEGEND : EXISTING LIGHT EXISTING OVER-HEAD POWER EXISTING SIGN EXISTING WATER LINE EXISTING STORM SEWER EXISTING SANITARY SEWER PROPERTY LINE BENCH PROPERTY LINE EASEMENT EXISTING RAIL EXISTING FENCE EXISTING CURB AND GUTTER EXISTING TREE EXISTING BUILDING 1 08.05.2019 PUD AMENDMENT 2 10.07.2019 PUD AMENDMENT 3 10.29.2019 PUD AMENDMENT BODY ART BOLLARD BODY ART BOLLARD "BODY ART" BENCH BOLLARD (TYP.) EXISTING GAS LINE 34 SANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANW W W W W W W W W W W W W W W W W W W W W W W WWWW SANSANSANSANNSANSANFM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM SAN SAN SAN SANSANSANSANSANSANSANSANSANSANSANSANSANSAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SANSANSANSANSANSANSANSANS A N S A N S A N S A N S A N S A N S A N S A N S A N S A N S A N S A N S A N S A N S A N S A N S A N S A N S A N S A N S A N S A N S A N S A N S A N S A N S A N S A N WWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWW W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W WW WWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWW WW WW WW WW WW WW WW WW WW WW WW WW WW WW WW WW WW WWW W W W W W W W W WWWWWWWWWWWWWWWWWWWWWWWWWWSAN SAN SAN SAN SAN SAN SAN SS SS SS SS ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST STSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTWWWWWWWWWWWW W W W W W W W W W W W W W WWWWSTSTS STSTS STSTS SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN STSTS CADD USER: Jeremy J. Gacnik FILE: M:\DESIGN\23271732.00\BARR_CIVIL\23271732.00_C1.1_TREE PRESERVATION PLAN.DWG PLOT SCALE: 1:1 PLOT DATE: 10/27/2019 1:18 AM1 - PLAN: TREE PRESERVATION PLAN 1" = 20'SCALE IN FEET 40200 8" ASPEN (DYING) 8" ASPEN (DEAD) 10" AMUR MAPLE (DYING) 6" ASPEN 4" ASPEN (DEAD) 5" ASPEN 6" ASPEN 2" HAWTHORN 2" CRAB (DEAD) 2.5" CRAB 13" PINE 13" PINE 9" MAPLE 9" MAPLE 6" TREE LILAC 8" TREE LILAC 11" MAPLE 19" PINE 6" TREE LILAC 8" HONEYLOCUST 8" BOXELDER 8" HONEYLOCUST 8" BOXELDER 3" ELEM 3" CRAB 20" ELM 10" AMUR MAPLE (DYING) 15" AMUR MAPLE 8" PINE 8" PINE 4" PINE 18" AMUR MAPLE 18"AMUR MAPLE 5" CRABAPPLE (DYING) 5" CRABAPPLE (DYING) 5" CRABAPPLE (DYING) 10" AMUR MAPLE (DYING) * denotes unhealthy or diseased condition | SIGNIFICANT TREE = any tree, with the exception of Salix, Boxelder, Siberian Elm, and Black Locust is considered to be significant under the landscaping section of the zoning ordinance if it is at least 5-caliper inches for deciduous trees and 6-caliper inches for conifers. Aspen, Cottonwood, or Silver Maple are considered significant if it is at least 12 inches in diameter at breast height (DBH). (Ord. No. 2325-07, 5-7-07; Ord. No. 2449-13, 11-15-2013) * Caliper inches of replacement trees was determined using ((A/B)-0.2) x C x A = D; where: A = Total diameter inches of significant trees lost as a result of land alteration or removal | B = Total diameter inches of signficant trees situated on the land | C = Tree replacement constant (1.5) | D = Replacement trees (# of caliper inches) Minneapolis, Minnesota Ph: 1-800-632-2277 Corporate Headquarters: BARR ENGINEERING CO. Project Office: Suite 200 4300 MARKETPOINTE DRIVE Fax: (952) 832-2601 www.barr.com Ph: 1-800-632-2277 MINNEAPOLIS, MN 55435 1 08.05.2019 PUD AMENDMENT 2 10.07.2019 PUD AMENDMENT 3 10.29.2019 PUD AMENDMENT 35 NSANSANFM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM EXTENTS OF OUTDOOR SEATING EXTENTS OF OUTDOOR SEATING EXTENTS OF RESIDENT DISPLAY AREAS RAMP DOWN TO SUBSURFACEPARKING GARAGESURFACE PARKING FIRE LANEFIRE LANETRASH ENCLOSURE SEE ARCH FOR DETAIL EXTENTS OF SUBSURFACE PARKING, TYP. SIDEWALK, TYP. TRAP ROCK AGGREGATE RETAINING WALL TO TIE IN AND MATCH EXISTING ADJACENT RAISED PLANTER "BODY ART" BOLLARDS (2) SALVAGE AND REINSTALL TRASH RECEPTACLE, TYP. "BODY ART" BOLLARDS (2) SALVAGE AND REINSTALLBIKE RACKS (6) "BODY ART" BENCHES (2) SALVAGE AND REINSTALL SMALL PLANTER, TYP. ADA ACCESSIBLE GRATE, TYP. BENCH, TYP. CONTINUOUS TREE TRENCH SEE 2/L501 CONTINUOUS TREE TRENCH SEE 2/L501 BIKE RACKS (4) URBAN RAINGARDEN SEE 3/L501 P RO P E R T Y L I N E BOLLARDS, TYP. ADA PUSH-PLATE ONE-WAY SIGN BIKE RACKS (7) ADA PUSH-PLATE ROOFTOP ORNAMENTAL TREES, TYP. STOOP, TYP. BIKE RACKS (7) 15 MIN. DROP-OFF PARKING ZONE DURING NON-DELIVERY HOURS (3 SPACES) "RIBBON" OF CONTRASTING PAVING TO DEFINE LIMITS OF TYP. DRIVE LANE LARGE PLANTER, TYP. RAISED "DUNE" BERM, TYP. SEE 1/L501 INTERACTIVE STORMWATER FOUNTAIN (AT GRADE) FOUNTAIN CURB, SEE 10/L500 PATH O F D E LI V E R Y TRUCK ( S U - 3 0 ) AT-GRADE TREE TRENCH PLANTER W/ ADA COMPLIANT GRATE "BRIDGE" TO CONNECT TO LRT SIDEWALK SEE 2/L501 BIKE RACKS (6) PARAL L E L P A R KI N G ( 6) PAVEMENT MARKINGS TO REPRESENT SHARED USE CONDITION, TYP. HYDRANT LOCATION TO BE REVISED WITH SWLRT DESIGN TEAM SPECIAL WOONERF PAVING PATTERN, TYP. LRT M E C H A NI C A L BUILDI N G ( B Y O T H E R S) LRT KISS N' RIDE (BY OTHERS) LRT S T A TI O N SI D E W A L K (BY OT H E R S) LRT S T A TI O N SI D E W A L K (BY OT H E R S) WOONERF MONUMENT SIGN LRT MONUMENT SIGN (BY OTHERS)6'-0"6'-2"2'-0"2'-4"2'-0"SEAT WALL 5'-4" 25'-9" 22'-11"16'-0" 20'-0" T Y P.6'-0" PUBLI C SI DE W ALK4'-11"5'-0"6'-0"8'-0"EXTENTS OF SUBSURFACE PARKING, TYP. EASEMENT, TYP.CADD USER: Jeremy J. Gacnik FILE: M:\DESIGN\23271732.00\BARR_CIVIL\23271732.00_C2.0_SITE PLAN.DWG PLOT SCALE: 1:1 PLOT DATE: 10/29/2019 10:43 AM1 - PLAN: EXISTING CONDITIONS 1" = 20'SCALE IN FEET 40200 GENERAL NOTES: 1. BENCHMARK: MNDOT MONUMENT BR27B65 SE, GSID STATION #91466, ELEV = 922.088 2. REFER TO ARCHITECTURAL PLANS FOR ADDITIONAL BUILDING AND PARKING GARAGE DETAILS. 3. REFER TO LANDSCAPE PLANS FOR ADDITIONAL PLANTING DETAILS AND "DORA" SQUARE FOOTAGE. EXISTING BUILDING W 36TH STREET YOSMITE AVE SWOODD A L E A V E S LEGEND : PROPERTY LINECONCRETE DRIVE APRON PER CITY PLATE ST-2 RIGHT-IN / RIGHT-OUT ONLY CONCRETE STEP PROPOSED HOTEL WOOD D A L E A V E N U E S T A TI O N PROPOSED MIXED -USE BUILDING ELECTRICAL EQUIPMENT LIMITS OF UNDERGROUND PARKING GARAGE OUTDOOR SEATING CURB PROPERTY LINE PLANTING AREA 23.0'28.5 '24.00 ' 31.47'10.00'10.41' 24.0' PLANTING AREA (TYP - SEE L100)8.00'2.00'MAINT E N A N C E EDG E (TYP.) BENCH AND PLANTERS Minneapolis, Minnesota Ph: 1-800-632-2277 Corporate Headquarters: BARR ENGINEERING CO. Project Office: Suite 200 4300 MARKETPOINTE DRIVE Fax: (952) 832-2601 www.barr.com Ph: 1-800-632-2277 MINNEAPOLIS, MN 55435 1 08.05.2019 PUD AMENDMENT 2 10.07.2019 PUD AMENDMENT ADA RAMP ADA RAMP ADA RAMP ADA RAMP 3 10.29.2019 PUD AMENDMENT EXISTING LIGHTING ALONG STREET FRONTAGE TO BE SALVAGED (TYP.) 36 SANSANFM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM M ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST STSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHPOHPOHP S S S S ST ST ST ST ST ST ST ST ST ST ST ST CADD USER: Jeremy J. Gacnik FILE: M:\DESIGN\23271732.00\BARR_CIVIL\23271732.00_C3.0_GRADING PLAN-2.DWG PLOT SCALE: 1:1 PLOT DATE: 10/29/2019 11:02 AM1 - PLAN: PROPOSED GRADING 1" = 20' GENERAL NOTES: 1. SEE SHEETS C001 AND C003 FOR REMOVALS AND PRESERVATION PLANS. 2. THE CONTRACTOR IS SPECIFICALLY CAUTIONED THAT THE LOCATION AND/OR ELEVATION OF EXISTING UTILITIES AS SHOWN ON THESE PLANS IS BASED ON RECORDS OF THE VARIOUS UTILITY COMPANIES, AND WHERE POSSIBLE, MEASUREMENTS TAKEN IN THE FIELD. THE INFORMATION IS NOT TO BE RELIED ON AS BEING EXACT OR COMPLETE. THE CONTRACTOR SHALL VERIFY THE FIELD LOCATION OF ALL PUBLIC AND PRIVATE UTILITIES PRIOR TO CONSTRUCTION. THE CONTRACTOR SHALL CONTACT GOPHER STATE ONE CALL AT (651)454-0002. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO RELOCATE ALL EXISTING UTILITIES WHICH CONFLICT WITH THE PROPOSED IMPROVEMENTS SHOWN ON THE PLANS. 3. ALL CUT OR FILL SLOPES SHALL BE 3:1 OR FLATTER UNLESS OTHERWISE NOTED. 4. EXISTING GRADE CONTOUR INTERVALS SHOWN AT 1 FOOT INTERVALS. 5. PROPOSED GRADE CONTOUR INTERVALS SHOWN AT 1 FOOT INTERVALS. 6. THE CONTRACTOR SHALL ADHERE TO ALL TERMS & CONDITIONS AS OUTLINED IN THE GENERAL N.P.D.E.S. PERMIT FOR STORMWATER DISCHARGE ASSOCIATED WITH CONSTRUCTION ACTIVITIES. 7. TOPOGRAPHIC INFORMATION TAKEN FROM A TOPOGRAPHIC SURVEY BY LAND SURVEYORS, IF CONTRACTOR DOES NOT ACCEPT EXISTING TOPOGRAPHY AS SHOWN ON THE PLANS, WITHOUT EXCEPTION, HE SHALL HAVE MADE, AT HIS EXPENSE, A TOPOGRAPHIC SURVEY BY A REGISTERED LAND SURVEYOR AND SUBMIT TO THE OWNER FOR REVIEW. 8. THE CONTRACTOR SHALL CONTACT ST LOUIS PARK SURFACE WATERS AND SEWERS 48 HOURS PRIOR TO ANY EXCAVATION OR CONSTRUCTION RELATED TO OR IN THE LOCATION OF THE PROPOSED STORMWATER MANAGEMENT BMP. 9. UPON THE PROJECT'S COMPLETION THE CONTRACTOR SHALL PROVIDE TO THE DEPARTMENT OF PUBLIC WORKS A FINAL STORM WATER MANAGEMENT REPORT INCLUDING RECORD DRAWINGS. THE REPORT WILL SERVE AS A MEANS OF VERIFICATION THAT THE INTENT OF THE APPROVED STORMWATER MANAGEMENT DESIGN HAS BEEN MET. THIS FINAL REPORT SHALL SUBSTANTIATE THAT ALL ASPECTS OF THE ORIGINAL DESIGN HAVE BEEN ADEQUATELY PROVIDED FOR THE THE CONSTRUCTION OF THE PROJECT. 10. PROTECT EXISTING FORCE MAIN AS DIRECTED BY THE CITY OF ST. LOUIS PARK. 11. REFER TO MPCA APPROVED RESPONSE ACTION PLAN FOR ADDITIONAL REQUIREMENTS. LEGEND : EXISTING MINOR CONTOUR EXISTING STORM SEWER PROPOSED STORM SEWER EXISTING MAJOR CONTOUR 916 915 Minneapolis, Minnesota Ph: 1-800-632-2277 Corporate Headquarters: BARR ENGINEERING CO. Project Office: Suite 200 4300 MARKETPOINTE DRIVE Fax: (952) 832-2601 www.barr.com Ph: 1-800-632-2277 MINNEAPOLIS, MN 55435 08.05.2019 PUD AMENDMENT 2 10.07.2019 PUD AMENDMENT W 36TH STREET YOSMITE AVE SWOODD A L E A V E S PROPOSED UNDERGROUND STORMWATER STORAGE AND TREATMENT SYSTEM, SEE SHEET 6.2 FOR DETAIL PROPOSED CATCH BASIN 912.68' FL/LP EXISTING BUILDING PROPOSED HOTEL FFE = 915.00 PROPOSED MIXED USE BUILDING FFE VARIES FROM 914.63' TO 916.86' PROPOSED INTERACTIVE FOUNTAIN SUPPLIED BY ROOF DRAIN RUNOFF RAMPEXISTING STORM SEWER CONCRETE STEPS 914.90' TOP 913.43' BOTTOM EXISTING STORM SEWER 915.00'915.00' 915.00' FFE 913.20' FG 911.58' FL 911.80' FL 915.00' FFE 914.63' FG 914.63' 913.50' TC 913.00' FL 913.69' TC 913.19' FL 914.32' 915.00' 915.00'914.69' 915.00' 915.00'915.00' 913.40' TC 912.90' FL 912.50' TC 912.00' FL 912.89' TC 912.39' FL 912.75' TC 912.22' FL 911.95' TC 911.45' FL 915.00' FFE 913.20' FG 911.95' TC 911.45' FL3.0%3.0%4.9%4.5%4.0%4.9%4.5%2.9%3.4%4.4%2.0%2.0%2.0%2.0% 2.0%2.0%1.2%914.84' TC 914.34' FL 914.41' TC 913.91' FL 915.46' TC 914.96' FL 915.21' TC 914.71' FL 915.00' FFE CURB CHASE 913.40' FL 914.20' TC 913.70' FL 915.08' TC 914.58' FL 915.40' TC 914.90' FL 914.50' TC 914.00' FL 914.50' TC 914.00' FL 913.85' TC 913.35' FL 914.27' TC 913.77' FL 915.00' TC 914.50' FL 915.50' TC 915.00' FL 915.06' TC 914.56' FL 1.0%1.0% 2.0% 2.0% 1.3 % 1. 5%3.0%0.9%0.9%GRADE BREAK GRADE BREAK 2.0%915.00' 915.00'2.0% 914.26' TC 913.76' FL 914.60' TC 914.10' FL 914.78' TC 914.28' FL G R A D E B R E A K 1. 0 % 2.6% 2.4% 914.63'914.63' 915.80' 915.80'915.94' 916.86' 917.53' 915.80'915.80' 915.80' 915.80' 913.80' TC 913.30' FL 913.97' TC 913.47' FL914.35' TC 913.85' FL 914.48' TC 913.98' FL 915.45' TC 914.95' FL 916.68' TC 916.18' FL 917.23' TC 916.73' FL 3.0%2.4%5.0%4.7%1.8%1.0%2.0% 1. 3% 0. 5% 1.3% 915.56' 914.76' 915.80' 914.99' 914.61' 914.80' 914.62' 914.27' 914.22' 915.80' 914.15' 915.00' 915.00' 934.56' TC 914.06' FL 914.23' TC 913.35' FL 3.5% 2.8%2.6%0.5%2.9%4.0%0.9%0. 9 % 2.8%1.26%1.3%1.3% 1.6%GRADEBREAK2.9%1.0%1.0%0.5%2.4% 1.1%0.5%913.78' TC 913.28' FL 913.28' TC 912.78' FL 913.50' TC 913.00' FL 911.60' TC 911.10' FL 905.22' TC 904.78' FL 905.00' TC 904.50' FL MATCH EXISTING 902.30' TC 901.80' FL PROPOSED CATCH BASIN 903.84' FL/LP MATCH EXISTING 901.23' TC 900.73' FL 5.0% 5.0% 5.0% 3.0%3.0%1.0% 903.35' TC 902.85' FL 3 10.29.2019 PUD AMENDMENT PROPOSED FLOWPATH PROPOSED FLOWPATH ABBREVIATIONS: FFE = FINISHED FLOOR ELEVATION FG = FINISHED GRADE FL = FLOWLINE LP = LOW POINT TC = TOP OF CURB 914.69' 2.0% PROPOSED FINISHED GRADE PROPOSED FINISHED GRADE SLOPE SPOT ELEVATION 1.6%2.0%14.7%SWLR T MAINT E N A N C E BLDG 915.00' 0.5%0.5% 1. 7% 0. 7%4.0%2.0%914.80' TC 914.19' FG 914.80' TC 913.89' FG 915.00' FFE 914.09' FG ELEVATED SEATING 37 SANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANW W W W W W W W W W W WSANSANSANSANFM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM M SAN SANSANSANSANSANAN SAN SAN SAN SAN SAN SAN SANSANSANSANS A N S A N S A N S A N S AN S A N S A N S A N S A N S A N S A N S A N S A N S A NW WWWWWWWWWWWWWWWW W W W W W W W W W W W W W W W W W W W W W W W W WWWWWWWWWWWWWWWWWW W W W WWWWWWWWWWWWSAN SAN SAN ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST STSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHPOHPOHPWWWWWWWW W W W W W W WWSAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN S S S S SS SS SS SS SAN SAN SAN SAN SAN S STST ST ST ST ST WWWWWWWWW W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W WW WWWSTSTSTST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST STSTSTSTST ST ST ST ST ST S T S T S T STSTSTSTST ST ST ST ST ST ST ST ST ST ST ST ST ST ST WWWWWWWFIREFIREFIREFIREFIREFIRECADD USER: Jeremy J. Gacnik FILE: M:\DESIGN\23271732.00\BARR_CIVIL\23271732.00_C4.0_UTILITY PLAN.DWG PLOT SCALE: 1:1 PLOT DATE: 10/30/2019 2:05 PM1 - PLAN: UTILITY PLAN 1" = 20' GENERAL NOTES: 1. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO REQUEST UTILITY LOCATES TO BE COMPLETED PRIOR TO ANY CONSTRUCTION ACTIVITY. 2. ALL BURIED UTILITIES MUST BE CLEARLY MARKED BEFORE COMMENCING AND THROUGHOUT THE DURATION OF THE PROJECT. 3. THE CITY OF ST. LOUIS PARK UTILITIES DIVISION (952-924-2558) SHALL BE CONTACTED AS LEAST 48 HOURS PRIOR TO ANY WATER SHUT-OFFS, SEWER CONNECTION, EXCAVATIONS, OR OTHER WORK RELATED TO THE CITY'S UTILITY SYSTEM. THE CONTRACTOR SHALL ALSO BE RESPONSIBLE FOR PROTECTING THE EXISTING SANITARY SEWER AND STORM SEWER SYSTEM DURING CONSTRUCTION, INCLUDING THE COST OF REMOVING AND CLEANING ANY DEBRIS IN THE LINES BOTH DURING AND AFTER COMPLETION OF CONSTRUCTION. 4. BROADBAND CONNECTIONS WILL BE PROVIDED FROM THE BUILDINGS TO THE STREET HANDHOLD AND THROUGHOUT THE BUILDINGS. 5. ALL SANITARY SEWERS, STORM SEWERS, AND WATER SERVICES SHALL BE TESTED PER PROCEDURES DEFINED IN THE MINNESOTA RULES (PART 4715.2820). W 36TH STREET YOSEMITE AVE SWOOD D A L E A V E S PROPOSED UNDERGROUND STORMWATER STORAGE AND TREATMENT SYSTEM PROPOSED DOMESTIC WATER SERVICE LINE (FOR BOTH BUILDINGS) 72-FT ~ 6" DIP 12" X 8" TEE 8" GV & BOX LEGEND : EXISTING SANITARY SEWER PROPOSED SANITARY SEWER EXISTING STORM SEWER PROPOSED STORM SEWER EXISTING WATER MAIN PROPOSED WATER PROPOSED ELECTRICAL EQUIPMENT PROPOSED BUILDING FFE = 915.00 EXISTING FIRE HYDRANT EX SAN MH INV = 885.30-FT EX WTR SERVICE EX 12" PVC WATER MAIN EX 8" SAN MAIN EX SAN MH INV (W) = 896.86-FT INV (E) = 894.30-FT INV (S) = 882.68-FT EXISTING FIRE HYDRANT EX STM MAIN E X 1 2 " P V C W A T ER M A I N E X 2 4 " S A N M A I N PROPOSED FIRE SERVICE (FOR BOTH BUILDINGS) 72-FT ~ 8" DIP 12" X 6" TEE 6" GV & BOX EX SAN MH INV = 882.87-FT SANITARY SEWER SERVICE (FOR BOTH BUILDINGS) 49 LF ~ 8" SAN @ 2.0% INVERT @ BLDG = 900.5-FT WATER LINE CONNECTION AND VALVE BY LRT PROPOSED 6" CIP WATER LINE BY LRT PROPOSED WATER LINE BY LRT PROPOSED WATER LINE BY LRT WATER LINE CONNECTION AND VALVE BY LRT EX WATER MAINPROPOSED HYDRANT BY LRT. COORDINATION WITH LRT IS NEEDED TO SHIFT HYDRANT TO WITHIN CURBED AREA PROPOSED HYDRANT BY LRT Minneapolis, Minnesota Ph: 1-800-632-2277 Corporate Headquarters: BARR ENGINEERING CO. Project Office: Suite 200 4300 MARKETPOINTE DRIVE Fax: (952) 832-2601 www.barr.com Ph: 1-800-632-2277 MINNEAPOLIS, MN 55435 1 08.05.2019 PUD AMENDMENT 2 10.07.2019 PUD AMENDMENT PROPOSED UNDERGROUND STORMWATER STORAGE AND TREATMENT SYSTEM, SEE SHEET 6.2 FOR DETAIL PROPERTY LINE CONNECT TO EXISTING STM-MH RIM = 900.53-FT (EX) INV(S) = 890.01-FT (EX) INV (W) = 891.90-FT 57-FT ~ 15 "RCP @ 2 .0% 115-F T ~ 1 5" RCP @ 2. 0 % 27 LF ~ 15" RCP @ 5.0% 115 LF ~ 1 5 " RCP @ 5 . 0 % PROPOSED ST-MH RIM = 913.08-FT INV = 906.28-FT PROPOSED MIXED USE BUILDING FFE = 914.63-FT TO 916.86-FT LFE = 905.00-FT STORM SEWER BY LRT PROPOSED SAN MH INV (EX) = 882.80-FT INV (E) = 899.52-FT PROPOSED CATCH BASIN RIM = 912.68-FT AT FLOW LINE INV = 906.68-FT PROPOSED CATCH BASIN RIM = 903.84-FT AT FLOW LINE INV = 895.95-FT 6 LF ~ 15" RCP @ 5.0% PROPOSED ST-MH RIM = 904.00-FT INV = 895.65-FT WATER LINE NOTES: 1. EXISTING WATER SERVICES SHALL BE DISCONNECTED AT THE CITY MAIN WITH APPROVED CAP AND SHUT OFF. WORK MUST BE COMPLETED IN PRESENCE OF CITY INSPECTOR. 2. TAPPING REQUIREMENTS: WATER TAPS WITH ONE-INCH CONNECTIONS SHALL HAVE A MINIMUM DISTANCE OF FIVE FEET BETWEEN TAPS WHEN THE TAPS ARE MADE ON THE SAME SIDE OF THE WATER MAIN. ONE-INCH CONNECTIONS MADE ON OPPOSITE SIDES OF THE WATER MAIN REQUIRE A MINIMUM DISTANCE OF FIVE FEET BETWEEN TAPS. A MINIMUM DISTANCE OF FIVE FEET IS REQUIRED BETWEEN THE TAP AND A HYDRANT TEE OR VALVES. A MINIMUM DISTANCE OF 2 FEET IS REQUIRED BETWEEN A TAP AND THE BELL OR FITTING. 3. ALL PIPING MUST BE INSTALLED PER MANUFACTURERS INSTALLATION INSTRUCTIONS. 4. ALL TEES, PLUGS, CAPS, BENDS, AND HYDRANT BRANCHES SHALL BE RESTRAINED AGAINST MOVEMENT. 5. ALL WATER SERVICES WILL BE ISOLATED FROM POLLUTION SOURCES PER MINNESOTA RULES (PART 4714.609.1). 6. ALL PIPE MATERIALS, PROPER JOINTS, AND SERVICE CONNECTIONS WILL COMPLY WITH CODE PER MINNESOTA RULES (PART 4715.0510, PART 4715.0530, PART 4715.0540, PART 4715.0620, PART 4715.0700, AND PART 4715.2410). 7. 48 HOUR NOTICE FOR TAP INSPECTION AND INSPECTION OF PIPING INSTALLED. 8. HYDROSTATIC TEST OF 200 PSI REQUIRED FOR 2 HOURS. 9. CONDUCTIVITY TEST REQUIRED PER CITY ENGINEERS ASSOCIATION OF MINNESOTA. CONDUCTIVITY TEST MUST BE COMPLETED WITHIN ONE WEEK AFTER COMPLETION OF PRESSURE TESTING OF THE MAIN ON ALL IRON PIPE WATER MAINS TO ESTABLISH THAT ELECTRICAL THAWING MAY BE CARRIED OUT IN THE FUTURE. 10. WATER SAMPLES MUST BE DRAWN AND VERIFIED BY AN INSPECTOR OF THE CITY OF ST. LOUIS PARK. SAMPLE RESULTS CAN BE EMAILED TO DSKALLET@STLOUISPARK.ORG OR FAXED 952.924.2663. 11. VALVE ACCESS WILL BE REQUIRED AFTER FINAL LAYER OF ASPHALT IS INSTALLED. SANITARY SEWER NOTES: 1. ALL SEWER SERVICE LINES MUST BE 4 INCHES OR GREATER IN DIAMETER. 2. ALL SERVICE LINES WILL BE CONNECTED TO THE CITY MAIN BY WYE FITTINGS OR WYE SADDLES. 3. TAPS WILL BE INSTALLED BY LICENSED PLUMBER AND WITNESSED BY AN INSPECTOR WORKING FOR THE CITY OF ST. LOUIS PARK. 4. NO ROOF DRAINS, UNDER DRAIN OR ANY OTHER TYPE OF STORM DRAINS SHALL BE CONNECTED TO THE SANITARY SEWER SYSTEM. 5. ALL PIPE AND FITTINGS MUST BE INSTALLED IN POSITIONS THAT ALLOW INSPECTION OF ALL MARKINGS AND IDENTIFICATIONS. 6. WATER AND SEWER LINES MUST HAVE AT LEAST A 10 FOOT SEPARATION BETWEEN TRENCHES. ABANDON EXISTING WATER SERVICE AND CAP AT MAIN IN STREET APPROXIMATE LIMITS OF UTILITY EXCAVATION WORK WITHIN STREET ROW PROPERTY LINE EXISTING OVERHEAD POWER LINE EXISTING GAS LINE 3 10.29.2019 PUD AMENDMENT PROPOSED STORM SEWER BY LRT PROPOSED STORM SEWER BY LRT PROPOSED STORM SEWER BY LRT PROPOSED STORM SEWER BY LRT 10" APPROXIMATE LIMITS OF UTILITY EXCAVATION WORK WITHIN STREET ROW 38 SANSANFM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM M ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST STSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTS S S S ST ST ST ST ST ST ST ST ST ST ST ST CADD USER: Jeremy J. Gacnik FILE: M:\DESIGN\23271732.00\BARR_CIVIL\23271732.00_C5.0_EROSION CONTROL PLAN.DWG PLOT SCALE: 1:1 PLOT DATE: 10/29/2019 11:06 AM1 - PLAN: PROPOSED GRADING 1" = 20' GENERAL NOTES: 1. ALL SEDIMENT CONTROL BMP TO BE INSTALLED PRIOR TO START OF CONSTRUCTION ACTIVITIES. 2. SEDIMENT CONTROL BMP TO BE MAINTAINED THROUGHOUT THE CONSTRUCTION PROJECT. ACCUMULATED SEDIMENT TO BE REMOVED PERIODICALLY. W 36TH STREET YOSMITE AVE SWOODDA L E A V E S PROPOSED CONSTRUCTION ENTRANCE PROPOSED BIOLOG PROPOSED SILT FENCE LEGEND : PROPOSED STORM SEWER PROPOSED BIOLOG BMP PROPOSED CONSTRUCTION ENTRANCE INLET PROTECTION PROPERTY LINE Minneapolis, Minnesota Ph: 1-800-632-2277 Corporate Headquarters: BARR ENGINEERING CO. Project Office: Suite 200 4300 MARKETPOINTE DRIVE Fax: (952) 832-2601 www.barr.com Ph: 1-800-632-2277 MINNEAPOLIS, MN 55435 1 08.05.2019 PUD AMENDMENT 2 10.07.2019 PUD AMENDMENT PROPOSED CATCH BASIN BY SWLRT EXISTING BUILDING PROPOSED BUILDING PROPOSED BUILDING RAMPIP IP IP IPPROPOSED SILT FENCE PROPOSED SILT FENCE PROPOSED UNDERGROUND STORMWATER STORAGE AND TREATMENT SYSTEM. SEE SHEET 6.2. PROPOSED STORM SEWER PROPOSED STORM SEWER PROPOSED SILT FENCE EXISTING STORM SEWER PROPERTY LINE 3 10.29.2019 PUD AMENDMENT 39 0.9 0.4 0.4 4.4 3.1 1.1 1.2 9.6 13.9 2.5 2.8 1.5 2.4 10.2 12.2 6.4 2.9 0.2 5.2 16.3 7.6 4.3 1.9 0.4 7.2 16.3 4.9 3.0 0.8 7.5 13.3 8.4 4.4 1.5 0.2 1.5 11.3 10.4 7.7 5.2 2.4 0.4 3.7 8.3 9.4 6.2 2.9 1.2 6.4 13.8 8.7 8.3 5.1 2.6 0.9 1.0 6.1 15.2 10.9 7.5 4.8 3.5 3.2 2.3 1.6 5.8 15.4 9.5 6.8 4.1 2.2 2.0 3.3 5.1 2.5 0.4 1.2 6.1 20.0 9.7 8.5 6.6 3.4 2.0 0.8 0.5 2.3 6.1 8.2 0.6 1.2 7.1 16.9 10.1 9.7 5.9 3.2 2.0 0.7 0.3 0.3 1.3 3.9 5.9 2.3 0.6 1.1 6.5 22.4 11.2 7.2 3.8 5.1 12.1 0.9 0.2 0.3 6.8 2.2 3.5 2.4 0.4 0.7 6.3 12.2 11.5 6.1 2.6 0.4 0.1 0.1 0.1 2.1 9.0 1.3 2.2 1.9 0.8 0.1 0.5 5.5 21.1 10.2 5.0 2.0 1.0 0.1 0.1 12.1 2.4 0.7 0.7 1.5 1.7 0.9 0.2 0.4 4.0 12.2 6.3 3.3 1.5 3.1 0.3 0.1 0.9 1.6 1.6 0.8 1.1 1.7 1.5 0.4 0.4 0.7 4.0 7.1 9.8 8.6 3.8 4.0 8.9 8.6 4.7 2.4 1.3 1.2 2.7 0.6 2.0 5.3 1.6 1.1 1.2 1.7 2.3 2.1 0.6 1.3 3.3 5.6 7.9 7.9 6.4 6.1 7.4 7.0 5.0 3.1 2.0 1.9 1.9 2.1 2.8 2.9 2.3 1.9 1.7 2.0 3.0 4.4 0.7 1.4 4.4 6.1 9.3 10.3 10.1 7.9 8.3 7.4 5.8 5.8 5.1 3.7 3.7 5.5 6.5 6.5 5.5 4.1 3.2 2.6 2.9 3.6 2.7 0.5 1.3 4.0 7.3 10.0 8.6 4.9 8.2 8.5 3.8 4.0 9.2 9.8 9.9 9.1 6.1 5.1 3.6 2.9 2.3 1.9 0.7 1.3 6.7 9.6 6.2 3.4 1.9 1.3 0.5 0.8 1.1 7.5 10.9 8.1 4.4 2.4 1.1 0.6 0.3 0.7 8.7 10.8 6.3 3.0 1.5 1.0 0.4 0.3 0.7 8.5 9.6 7.2 3.8 2.2 1.6 1.9 0.6 0.9 7.5 9.1 4.7 2.5 2.2 3.2 2.9 0.7 1.1 6.5 6.8 3.7 2.3 2.3 3.2 4.1 0.7 1.4 7.9 8.6 7.1 9.2 8.6 7.8 10.1 9.4 9.7 4.9 3.6 1.7 1.7 2.3 2.5 1.4 0.8 1.5 11.6 4.0 4.5 4.8 4.7 4.8 5.4 5.5 5.1 3.2 2.0 1.1 1.2 1.5 1.5 1.1 0.9 1.5 15.2 9.2 7.4 7.4 5.5 3.4 2.1 1.9 2.0 2.0 2.1 1.9 1.4 1.0 0.7 0.8 1.0 1.0 0.8 0.3 0.7 1.1 12.2 8.0 5.2 4.1 3.2 2.4 1.5 0.8 0.7 0.6 0.6 0.6 0.6 0.5 0.5 0.5 0.7 0.8 0.9 0.8 0.3 0.5 0.9 8.5 1.0 1.4 1.2 0.6 1.3 0.9 0.5 4.1 2.8 2.0 1.6 1.4 1.0 0.8 0.7 0.7 0.7 0.6 0.6 0.5 0.4 0.5 0.6 0.8 0.9 1.1 1.1 0.8 1.2 5.8 4.7 8.4 8.3 8.1 8.3 8.2 4.6 1.9 1.4 0.9 1.0 1.2 1.4 1.0 1.0 1.0 1.3 1.0 0.8 0.6 0.6 0.6 0.6 0.8 1.0 1.4 2.0 2.2 0.9 1.6 8.9 1.6 2.8 2.6 1.9 2.6 3.0 1.7 1.1 1.3 1.0 1.1 1.8 2.1 1.3 1.2 1.5 2.1 1.4 1.0 0.8 1.1 0.8 0.6 0.7 1.0 1.6 2.7 4.1 0.5 1.4 10.0 0.5 1.0 1.3 1.3 1.5 2.2 2.1 1.7 1.5 2.1 2.0 1.9 1.3 1.3 1.2 0.8 0.6 0.7 0.9 1.5 2.4 3.4 3.0 0.8 1.9 7.3 0.4 0.0 0.0 0.0 0.0 0.1 0.5 0.8 0.8 0.8 1.2 1.7 1.7 1.3 1.1 1.7 1.6 1.5 0.9 1.1 0.8 0.7 0.5 0.6 0.8 1.1 1.7 2.1 1.9 0.8 1.0 3.1 0.4 0.2 0.1 0.0 0.0 0.0 0.1 0.0 0.0 0.1 0.1 0.2 0.5 0.3 0.2 0.3 0.5 0.3 0.2 0.2 0.5 0.5 0.3 0.4 0.6 0.8 1.1 1.3 1.2 0.6 0.4 0.6 0.8 0.8 0.7 0.4 0.2 0.4 0.5 0.6 0.6 0.5 0.2 0.2 0.4 0.5 0.7 0.9 0.8 0.2 0.4 0.6 0.9 1.2 1.8 1.4 0.4 0.6 1.0 1.5 2.6 3.8 0.3 0.6 0.9 1.5 2.6 3.7 3.0 0.5 0.8 1.3 1.9 2.5 2.3 0.4 0.6 0.9 1.3 1.6 1.5 0.7 0.5 0.8 1.1 1.4 1.5 1.0 0.4 0.7 1.1 1.4 1.6 1.8 0.9 0.5 0.9 1.2 1.6 2.5 3.5 0.4 0.7 1.0 1.6 2.7 3.9 2.7 0.6 0.8 1.3 2.1 2.8 2.5 0.5 0.7 1.0 1.4 1.6 1.5 0.6 0.5 0.7 0.9 1.0 1.0 0.6 0.3 0.5 0.6 0.7 0.8 0.6 0.2 0.3 0.3 0.5 1.0 0.8 0.3 0.1 0.2 0.7 1.4 1.0 0.3 0.0 0.1 0.1 1.3 2.1 1.4 0.2 0.0 0.1 0.3 2.1 3.6 1.7 0.2 0.1 0.1 0.7 3.6 6.1 1.2 0.3 0.1 1.4 4.0 5.2 0.7 0.3 0.4 1.8 2.9 1.6 0.3 0.2 1.4 1.5 0.4 0.1 0.6 0.1 0.0 0.0 CADD USER: Jeremy J. Gacnik FILE: M:\DESIGN\23271732.00\BARR_CIVIL\23271732.00_C7.0_PHOTMETRIC PLAN V2.DWG PLOT SCALE: 1:1 PLOT DATE: 10/31/2019 9:59 AM1 - PLAN: PHOTOMETRIC 1" = 20'SCALE IN FEET 40200 STATISTICS DESCRIPTION AVERAGE MAXIMUM MINIMUM MAX/MIN AVG/MIN CALCULATION ZONE 2.9 FC 22.4 FC 0.0 FC N/A N/A LIGHTING FIXTURE SCHEDULE B BOLLARD SOLECITY ULB100-30W16LED4K-G2-LEV3 D AREA CREE ARE-EDG-4MB-DA-04-E-UL-350-40K (20 FOOT POLE) EH AREA LSI LSAH100HPSMT3FBLK/SCS4BLK (EXISTING FIXTURE) G AREA PHILIPS GARDCO ECOFORM ECF-S-32L-530-NW-G2-4 (15 FOOT POLE) J AREA PHILIPS GARDCO ECOFORM ECF-S-32L-530-NW-G2-2 (15 FOOT POLE) J1 AREA PHILIPS GARDCO ECOFORM ECF-S-32L-700-NW-G2-2 (15 FOOT POLE) K WALL PACK PHILIPS TRAPEZOIDAL WEDGE 101L-32L-530-NW-G1-4-UNV (WALL 9'-6" AFF) K1 WALL PACK PHILIPS TRAPEZOIDAL WEDGE 101L-32L-530-NW-G1-2-UNV (WALL 9'-6" AFF) X DOWNLIGHT PRESCOLITE LF6SL-6LFSL20L40K8 NOTES: 1. EACH FIXTURE SHALL HAVE AN INTEGRAL PHOTOCELL AND SHALL BE CONTROLLED BY A LIGHTING CONTROL PANEL. W 36TH STREET PROPOSED BUILDING YOSMITE AVE SWOODDA L E A V E S PROPOSED BUILDING EXISTING BUILDING Minneapolis, Minnesota Ph: 1-800-632-2277 Corporate Headquarters: BARR ENGINEERING CO. Project Office: Suite 200 4300 MARKETPOINTE DRIVE Fax: (952) 832-2601 www.barr.com Ph: 1-800-632-2277 MINNEAPOLIS, MN 55435 1 08.05.2019 PUD AMENDMENT 2 10.07.2019 PUD AMENDMENT 3 10.29.2019 PUD AMENDMENT 4 10.31.2019 PUD AMENDMENT 40 CONTACTS CLIENT PLACE DEVELOPMENT 100 PORTLAND AVENUE SOUTH, SUITE 100 MINNEAPOLIS, MN 55401 CONTACT: CHRIS VELASCO 612.309.3889 ARCHITECT LHB, INC 701 WASTHINGTON AVE N, SUITE 200 MINNEAPOLIS, MN 55401 CONTACT: NICOLLE VANWIE 612.766.2826 CIVIL ENGINEER BARR ENGINEERING CO. 4300 MARKETPOINTE DR MINNEAPOLIS, MN 55435 CONTACT: JEREMY GACNIK LANDSCAPE ARCHITECT LHB, INC. 701 WASHINGTON AVE N, SUITE 200 MINNEAPOLIS, MN 55401 CONTACT: LYDIA MAJOR 612.338.2029 STRUCTURAL ENGINEER MEYER BORGMAN JOHNSON 510 S MARQUETTE AVE #900 MINNEAPOLIS, MN 55402 CONTACT: JASON PEDERSON 612.338.0713 SITE MAP MIXED USE DEVELOPMENT, INCLUDING HOTEL, RESIDENTIAL, PERFORMANCE SPACE, RESTAURANT, AND COFFEE SHOP PUD AMENDMENT RESPONSE TO COMMENTS PLACE DEVELOPMENT ST LOUIS PARK, MN VIA LUNA & FAIRFIELD INN HOTEL BUILDING AREA TABULATION SOUTH BUILDING - OVERALL FLOOR NAME AREA (GSF)DESCRIPTION LEVEL 0 57,038 SOUTH BUILDING - RESIDENTIAL LEVEL 1 10,670 LEVEL 2 10,670 LEVEL 3 12,003 LEVEL 4 LEVEL 5 LEVEL 6 LEVEL 7 1,480 15,672 16,271 12,154 2,933 204,806 SOUTH BUILDING - HOTEL LEVEL 1 LEVEL 2 LEVEL 3 LEVEL 4 LEVEL 5 LEVEL 6 TOTAL BOTH 12,003 10,685 10,685 UNIT / GUEST ROOM TYPES SOUTH BUILDING - RESIDENTIAL UNIT TYPE STUDIO TYPE II - NO LIVING SPACE STUDIO - NO LIVING SPACE STUDIO APARTMENTS ONE BEDROOM (1 BR) GUEST ROOM TYPE SOUTH BUILDING - HOTEL KING (K) KING SUITE (KS) ACCESSIBLE KING (AK) ACCESSIBLE KING SUITE (AKS) QUEEN QUEEN (QQ) ACCESSIBLE QUEEN QUEEN (AQQ) TOTAL -- 29 -- -- -- -- 15 L02 5 1 -- 8 -- TWO BEDROOM (2 BR) THREE BEDROOM (3 BR) TOTAL -- -- 8 1 3 1 15 L03 5 -- -- 8 1 15 L04 5 1 1 8 -- 12 L05 5 1 -- 2 -- -- L06 -- -- -- TOTAL TOTAL 57 20 3 1 26 1 -- -- --11020303030 3 35 32 4 12 2 501328 -- L01 -- -- -- -- -- -- 3 6 -- -- -- -- 7 -- -- 8 1 3 1 13 -- -- 8 1 3 -- 12 -- -- 8 1 3 -- 12 PARKING STALL TABULATION TYPE ENCLOSED SURFACE TOTAL STANDARD COMPACT / TANDEM ACCESSIBLE TOTALS 96 35 4 33 0 2 129 35 6 BIKE STALL TABULATION TYPE COUNT INTERIOR EXTERIOR TOTAL 114 84 30 BUILDING EXTERIOR SIGNAGE TABULATION LABEL SOUTH ELEVATION A TOTALS 20 1 16,271 16,271 L02 L03 L04 L05 L06L01 PARKING; BIKE, MECH, ELEC, & STORAGE USE AREA (SF)QTY TOTAL AREA LIVE/WORK 20 B151RESTAURANT15 C151HOTEL15 D451HOTEL45 NORTH ELEVATION E151RES. ENTRY 15 EAST ELEVATION - HOTEL F 10 1COFFEE SHOP 10 NORTHWEST ELEVATION - HOTEL G 45 1HOTEL 45 10 1COFFEE SHOP 10 WEST ELEVATION - HOTEL H 62 1BUILDING SIGNAGE (BLADE SIGN) 62I SOUTHWEST ELEVATION - HOUSING 62 1BUILDING SIGNAGE 62J 12 299 SQUARE FEET STUDIO, STUDIO TYPE 2, PERFORMANCE, BIKES, OFFICES RESTAURANT, COFFEE SHOP, POOL, FITNESS, RECEPTION HOTEL GUEST ROOMS, HOUSEKEEPING STUDIO RESIDENTIAL UNITS, LAUNDRY RESIDENTIAL UNITS, LAUNDRY RESIDENTIAL UNITS, LAUNDRY RESIDENTIAL UNITS, LAUNDRY MECHANICAL PENTHOUSE MECHANICAL PENTHOUSE HOTEL GUEST ROOMS, LINEN, MECHANICAL ROOM HOTEL GUEST ROOMS, LINEN, MECHANICAL ROOM HOTEL GUEST ROOMS, LINEN, OUTDOOR PATIO OCTOBER 29, 2019 FLOOR NAME AREA (GSF) DESCRIPTION FLOOR NAME AREA (GSF) DESCRIPTION QUEEN QUEEN SUITE (QQS)1 -- -- --1---- ACCESSIBLE QUEEN QUEEN SUITE (AQQS) -- 1 -- --1---- 135 38 173 B NORTH A E-GEN C HOTEL D SOUTH DORA TABULATION TYPE TOTAL % OF SITE PERFORMANCE ROOF PATIO TOTALS 1035 732 37,438 SF NORTH SITE 35,671 16.3 % TOTAL HOTEL 79,572 TOTAL HOUSING 68,196 15 MIN LOADING/UNLOADING 0 3 3 FILE: DRAWN BY: CHECKED BY: PROJ. NO: DRAWING NO: DRAWING TITLE: PROJECT NAME: 9,$/81$ )$,5),(/' ,11+27(/ M:\\18Proj\180647\600 Drawings\A\ 67/28,63$5.01 N O T FO R C O N S T R U C T IO NPRELIMINARY COPYRIGHT 2019 BY LHB, INC. ALL RIGHTS RESERVED. NO DATE ISSUED FOR THIS SQUARE APPEARS 1/2"x1/2" ON FULL SIZE SHEETS :DVKLQJWRQ$YH16WH_0LQQHDSROLV01_ A 1 CLIENT: 3RUWODQG$YHQXH6RXWK6XLWH 0LQQHDSROLV01 WHO 1 08.05.2019 PUD AMENDMENT 2 10.07.2019 PUD AMENDMENT 2 3 4 5 B C D 3 10.29.2019 PUD AMENDMENT RESPONSE BIM 360://180647 Via Luna and Fairfield Inn Hotel/180647 Place Hotel A19.rvt10/29/2019 12:02:53 PMG0.01 DJP KDB 180647 &29(56+((7 38' $0(1'0(17 1 0 /2 9 /2 0 1 9 SHEET INDEX - PUD RE-SUBMITTAL NUMBER NAME 10/29/19 PUD Amendment ResponseGENERAL G0.02 LEGEND G0.03 GENERAL NOTES S0.01 SITE PLAN SURVEY / MAPPING V1.01 PRELIMINARY PLAT V1.02 PRELIMINARY PLAT V1.03 PRELIMINARY PLAT V3.01 ALTA / NSPS LAND TITLE SURVEY V3.02 ALTA CIVIL C1.0 EXISTING CONDITIONS ● C1.1 TREE PRESERVATION PLAN ● C2.0 SITE PLAN ● C3.0 GRADING PLAN ● C4.0 UTILITY PLAN ● C5.0 EROSION AND SEDIMENT CONTROL PLAN ● C6.0 DETAIL SHEET ● C6.1 DETAIL SHEET ● C6.2 DETAIL SHEET ● C6.3 DETAIL SHEET ● C6.4 DETAIL SHEET (OMITTTED) C7.0 PHOTOMETRIC PLAN ● LANDSCAPE ARCHITECTURE L1.01 PLANTING PLAN - OVERALL L1.02 PLANTING PLAN - NORTHWEST L1.03 PLANTING PLAN - NORTHEAST L100 PLANTING PLAN ● L500 PLANTING DETAILS ● ARCHITECTURAL A1.01 NORTH BLDG FLOOR PLANS A1.02 NORTH BLDG FLOOR PLANS A1.03 NORTH BLDG FLOOR PLANS A1.04 NORTH BLDG FLOOR PLANS A1.05 NORTH BLDG FLOOR PLANS A1.06 NORTH BLDG ELEVATIONS A1.07 NORTH BUILDING ILLUSTRATIVE ELEVATIONS A2.01 SOUTH SITE HOTEL & RESIDENTIAL - LOWER LEVEL FLOOR PLAN ● A2.02 SOUTH SITE HOTEL & RESIDENTIAL - LEVEL 1 FLOOR PLANS ● A2.03 SOUTH SITE HOTEL & RESIDENTIAL - LEVEL 2 FLOOR PLANS ● A2.04 SOUTH SITE HOTEL & RESIDENTIAL - LEVEL 3 FLOOR PLANS ● A2.05 SOUTH SITE HOTEL & RESIDENTIAL - LEVEL 4 FLOOR PLANS ● A2.06 SOUTH SITE HOTEL & RESIDENTIAL - LEVEL 5 FLOOR PLANS ● A2.07 SOUTH SITE HOTEL & RESIDENTIAL - LEVEL 6 FLOOR PLANS ● A2.08 SOUTH SITE HOTEL & RESIDENTIAL - LEVEL 7 FLOOR PLANS ● A2.10 SOUTH SITE HOTEL & RESIDENTIAL - NORTH & SOUTH ELEVATIONS & SECTIONS ● A2.11 SOUTH SITE HOTEL & RESIDENTIAL - EAST & WEST ELEVATIONS & SECTIONS ● A2.12 SOUTH SITE HOTEL & RESIDENTIAL - ELEVATIONS & SECTIONS ● A3.01 E-GEN FLOOR PLANS A3.02 E-GEN FLOOR PLANS A3.03 E-GEN ELEVATIONS A4.01 3D VIEW ● A5.01 ILLUSTRATIVE SECTIONS A5.02 TECHNICAL SECTIONS PLACE SHADOW STUDIES ● ELECTRICAL E1.01 ELECTRICAL SITE PLAN - OVERALL GREYED OUT SHEETS HAVE NOT BEEN REVISED AND ARE NOT BEING RESUBMITTED FOR THE PUD AMENDMENT NO DATE REVISION 41 & $ BBBBBBBBBBBBBBBBBBBBB $ $ BBBBBBBBBBBBBBBBBBBBB & $ BBBBBBBBBBBBBBBBBBBBB & $ BBBBBBBBBBBBBBBBBBBBB A2.111C A 2.12 1A A2.10 1AA2.123A STAIR C POOL ABOVE 1 2 3 4 5 6 7 8 9 22 21 20 19 18 17 16 15 14 23 24 25 26 27 28 29 30 31 323334353637383940424344454647484950515241 605958575655 54 53 61 70 71 7276788284889092949698 85899193959799 7779 111 124 125116117118 119 120 126 127 128 133 132 131 130 134 135 106 73 110 8183 62 63 64 65 66 67 68 69 74 75 8086 87 112 114 129 100 101 113 121 42 BIKES STAIR A RESIDENT STORAGE (31) MECH/ WATER SERVICE ELEV A LOBBY PRACTICE SPACE MECHANICAL ROOM ELEV B LOBBY STAIR D ELEC. ELEV B SUMP 102 103 122 123 BUILDING ABOVE BUILDING ABOVE BUILDING ABOVE BUILDING ABOVE RAMP DOWN PROPERTY LINE PROPERTY LINEP R O P E R T Y L IN E P R O P E R T Y L IN E P R O P E R T Y LIN E 254' - 0"85' - 2 13/16"256' - 7 1/4"SETBA CK5 ' - 0 " BL DGSETBACK10' - 0" BLDG341' - 10 1/16"SETBACK5' - 0" BLDG105 104 10 11 13 12 107 108 109 115 S W L R T U T IL IT Y E A S E M E N T S W L R T U T ILIT Y E A S E M E N T SWLRT UTILITY EASEMENTSWLRT UTILITY EASEMENT S W L R T U TILIT Y E A S E M E N T ELECTRIC VEHICLE (LEVEL 02) ELECTRIC VEHICLE (LEVEL 02) ELECTRIC VEHICLE (LEVEL 02) ELECTRIC VEHICLE (LEVEL 02) ELECTRIC VEHICLE (LEVEL 02) ELECTRIC VEHICLE (LEVEL 02) ELEVATOR A SUMP EXISTING ADJACENT BUILDING FILE: DRAWN BY: CHECKED BY: PROJ. NO: DRAWING NO: DRAWING TITLE: PROJECT NAME: 9,$/81$ )$,5),(/' ,11+27(/ M:\\18Proj\180647\600 Drawings\A\ 67/28,63$5.01 N O T FO R C O N S T R U C T IO NPRELIMINARY COPYRIGHT 2019 BY LHB, INC. ALL RIGHTS RESERVED. NO DATE ISSUED FOR THIS SQUARE APPEARS 1/2"x1/2" ON FULL SIZE SHEETS :DVKLQJWRQ$YH16WH_0LQQHDSROLV01_ A 1 CLIENT: 3RUWODQG$YHQXH6RXWK6XLWH 0LQQHDSROLV01 WHO 1 08.05.2019 PUD AMENDMENT 2 10.07.2019 PUD AMENDMENT 2 3 4 5 B C D 3 10.29.2019 PUD AMENDMENT RESPONSE BIM 360://180647 Via Luna and Fairfield Inn Hotel/180647 Place Hotel A19.rvt10/29/2019 12:01:58 PMA2.01 DJP NMV 180647 6287+6,7(+27(/ 5(6,'(17,$/ /2:(5 /(9(/)/2253/$1 1 0 /2 9 /2 0 1 9 3/32" = 1'-0"1 LOWER LEVEL FLOOR PLAN NO DATE REVISION 42 DN DN DN & $ BBBBBBBBBBBBBBBBBBBBB $ $ BBBBBBBBBBBBBBBBBBBBB & $ BBBBBBBBBBBBBBBBBBBBB & $ BBBBBBBBBBBBBBBBBBBBB A2.111C A2.121CA2.122C A 2 .1 1 1A A 2.12 1A A2.10 1AA2.123A STORAGE MAINT WORK VEST ENTRYVESTVEST POOL FITNESS ELEC COFFEE SHOP STAIR C BACK OF HOUSE RESTAURANT EMPLOYEE BREAK OFFICE OFFICE RES LOBBY TRASH/RECYCLE OFFICE PERFORMANCE GREEN ROOM 42 BIKESCOFFEE BAR SHWR MECH POOL EQUIPMENT POOL STOR. STORAGE CORNER MARKET REGISTRATION LOUNGE BREAKFAST STUDIO TYPE 2 121 278.06 SF STUDIO TYPE 2 122 281.26 SF STUDIO TYPE 2 120 284.82 SF PACKAGES VEST MOVE-IN STAGING MAIL STUDIO STUDIO STUDIO STUDIO STUDIO STUDIO STAIR A UNISEX PUBLIC RR'S RAMP DOWN 1 2 3 4 5 6 7 8 9 10 12 11 13 14 15 1617 18 19 20 21 22 23 24 25 26 27 28 29 TRASH TRASH GREASE M W QUICK PRINT FOOD PREP SETBACK10' - 0" BUILDINGBLDG SETBACK5' - 0"SETBACK10 '- 0" BLDGSETBACK 10 - 0" BLDGBLDG SET BACK5' - 0 " PROPERTY LINE PROPERTY LINE PROPERTY LINEP R O P E R T Y L IN E P R O P E R T Y L IN E 35 34 33 32 31 30 62' - 0"76' - 4 1/4"31' - 5 3/4"109' - 4"24' - 0"15' - 4"62' - 0"62' - 0"24' - 4"160' - 9"62' - 0"1 3 2' - 3 3/4" JANELEC/IT STAIR B W O O D D A L E A V E N U E S. W 36TH STREET BICYCLE MAINTENANCE STATION P R O P E R T Y LIN E S W L R T U T IL IT Y E A S E M E N T S W LR T U T IL IT Y E A S E M E N T SWLRT UTILITY EASEMENTSWLRT UTILITY EASEMENT S W L R T U TILIT Y E A S E M E N T TRASH RECYCLE COMPOST 10' - 5"8' - 0"RECYCLE ELECTRIC VEHICLE (LEVEL 02) ELECTRIC VEHICLE (LEVEL 02) ELECTRIC VEHICLE (LEVEL 02) 2 A2.02 BBBBBBBBBBBBBBBBBBB CANOPY OVERHEAD CANOPY OVERHEAD CANOPY OVERHEAD CANOPY OVERHEAD, TYP. PARRALLEL STALLS WILL BE SIGNED BUT NOT STRIPED CANOPY OVERHEADCANOPY OVERHEAD CANOPY OVERHEAD CANOPY OVERHEAD RAISED SEATING AREA WITH GUARDRAIL BUILDING ABOVE 2 0 ' - 0" 2 0 ' - 0" 2 0 ' - 0" 2 0 ' - 0" 2 0 ' - 0" 2 0 ' - 0" 3 A2.02 BBBBBBBBBBBBBBBBBBB 4 A2.02 BBBBBBBBBBBBBBBBBBB ACCESSIBLE ROUTE (MAX 5% SLOPE) A C C E S S IB L E R O U T E (M A X 5 % S L O P E )ACCESSIBLE ROUTE(MAX 5% SLOPE) ACCESSIBLE ROUTE (MAX 5% SLOPE) A C C E S SIB L E R O U T E ( M A X 5 % S L O P E) RETAINING WALL TO MATCH EXISTING PLANTER -SEE CIVIL EXISTING ADJACENT BUILDING A C C E S S IB L E R O U T E (M A X 5 % S L O P E )CANOPY OVERHEAD BICYCLE PARKING -LOCATIONS TO BE COORDINATED WITH SWLRT BUILDING ABOVE STOOP BELOW STOOP BELOW STOOP BELOW STOOP BELOW STOOP BELOW STOOP BELOW STOOP BELOW STOOP BELOW EXISTING ADJACENT BUILDING STOOP BELOW STAIR D POOL AIR HANDLING UNIT POOL CONDENSING UNIT (DEHUMIDIFIER) ACCESSIBLE ROUTE (MAX 5% SLOPE) GARAGE VENTILATION CAST-IN-PLACE CONCRETE STAIR; REFER TO STRUCTURAL2' - 10" HANDRAIL HEIGHTCONTINUOUS GALV. STL HANDRAIL RETURN TO VERTICAL POST; MITER AND WELD ALL JOINTS SMOOTH, PAINT 1' - 6"MAX 30"ONE TREAD DEPTH MINIMUM 6' - 6"4"RIBBED METAL PANEL. PROFILE TO MATCH RIBBED NICHIHA PANEL 6" x 6" GALV STEEL TUBE, PAINT CONCRETE PAD AT TRASH ENCLOSURE ASPHALT PARKING LOT CONCRETE CAISSONTYP4"4"2"3' - 6"SS CABLE GUARD RAIL WITH GALVANIZED AND PAINTED STEEL POSTS 2" GALVANIZED STEEL POST STOP GALVANIZED STEEL SLEEVE POST SS SET SCREWS GALV STEEL MOUNTING PLATE. PAINT1/4"FILE: DRAWN BY: CHECKED BY: PROJ. NO: DRAWING NO: DRAWING TITLE: PROJECT NAME: 9,$/81$ )$,5),(/' ,11+27(/ M:\\18Proj\180647\600 Drawings\A\ 67/28,63$5.01 N O T FO R C O N S T R U C T IO NPRELIMINARY COPYRIGHT 2019 BY LHB, INC. ALL RIGHTS RESERVED. NO DATE ISSUED FOR THIS SQUARE APPEARS 1/2"x1/2" ON FULL SIZE SHEETS :DVKLQJWRQ$YH16WH_0LQQHDSROLV01_ A 1 CLIENT: 3RUWODQG$YHQXH6RXWK6XLWH 0LQQHDSROLV01 WHO 1 08.05.2019 PUD AMENDMENT 2 10.07.2019 PUD AMENDMENT 2 3 4 5 B C D 3 10.29.2019 PUD AMENDMENT RESPONSE BIM 360://180647 Via Luna and Fairfield Inn Hotel/180647 Place Hotel A19.rvt10/29/2019 12:02:18 PMA2.02 DJP NMV 180647 6287+6,7(+27(/ 5(6,'(17,$/ /(9(/ )/2253/$16 1 0 /2 9 /2 0 1 9 3/32" = 1'-0"1 LEVEL 1 FLOOR PLAN 3/4" = 1'-0"2 CONCRETE STAIR RAILING AT EXTERIOR 3/4" = 1'-0"3 SECTION AT TRASH ENCLOSURE 1 1/2" = 1'-0"4 GUARDRAIL AT RAMP NO DATE REVISION 43 & $ BBBBBBBBBBBBBBBBBBBBB $ $ BBBBBBBBBBBBBBBBBBBBB & $ BBBBBBBBBBBBBBBBBBBBB & $ BBBBBBBBBBBBBBBBBBBBB A2.111C A2.121CA2.122C A 2 .1 11A A 2 .1 2 1A A2.10 1AA2.123A K K QQ QQ QQ K K QQ KS K K KS KS K K KS AK K K KSKKKK HOUSEKEEPING QQ QQ QQ QQ K STUDIOSTUDIOSTUDIOSTUDIOSTUDIO STUDIO STUDIO STUDIO STUDIO STUDIO STUDIO STUDIO STUDIO STORAGE STUDIO STUDIO STUDIO STUDIO STUDIO STUDIO STUDIO STUDIO STORAGE STUDIO STUDIO STUDIO STUDIO STAIR B STUDIO STUDIO STUDIO STUDIO JAN/TRASH/ RECYCLEELEC/ IT UNISEX STAIR A BUILDING ABOVE62' - 0"76' - 3 3/4"31' - 5 3/4"148' - 8"62' - 0"ROOF BELOW77°160' - 9"31' - 2 1/4"1 32' - 4"62' - 0"104' - 6" 230° 62' - 0" QQS 256' - 5 1/2" STAIR C STAIR D 3' - 11"86' - 8" ENTRY CANOPY BELOW ENTRY CANOPY BELOW ENTRY CANOPY BELOW ENTRY CANOPY BELOW ENTRY CANOPY BELOW ENTRY CANOPY BELOW ENTRY CANOPY BELOW ENTRY CANOPY BELOW FILE: DRAWN BY: CHECKED BY: PROJ. NO: DRAWING NO: DRAWING TITLE: PROJECT NAME: 9,$/81$ )$,5),(/' ,11+27(/ M:\\18Proj\180647\600 Drawings\A\ 67/28,63$5.01 N O T FO R C O N S T R U C T IO NPRELIMINARY COPYRIGHT 2019 BY LHB, INC. ALL RIGHTS RESERVED. NO DATE ISSUED FOR THIS SQUARE APPEARS 1/2"x1/2" ON FULL SIZE SHEETS :DVKLQJWRQ$YH16WH_0LQQHDSROLV01_ A 1 CLIENT: 3RUWODQG$YHQXH6RXWK6XLWH 0LQQHDSROLV01 WHO 1 08.05.2019 PUD AMENDMENT 2 10.07.2019 PUD AMENDMENT 2 3 4 5 B C D 3 10.29.2019 PUD AMENDMENT RESPONSE BIM 360://180647 Via Luna and Fairfield Inn Hotel/180647 Place Hotel A19.rvt10/29/2019 12:02:22 PMA2.03 DJP NMV 180647 6287+6,7(+27(/ 5(6,'(17,$/ /(9(/ )/2253/$16 1 0 /2 9 /2 0 1 9 3/32" = 1'-0"1 LEVEL 2 FLOOR PLAN NO DATE REVISION 44 & $ BBBBBBBBBBBBBBBBBBBBB$ $ BBBBBBBBBBBBBBBBBBBBB & $ BBBBBBBBBBBBBBBBBBBBB & $ BBBBBBBBBBBBBBBBBBBBB A2.111C A2.121CA2.122C A 2 .1 11A A 2 .1 2 1A A2.10 1AA2.123A KKSAQQKKSKSKS KSKKKK LINEN K K QQ K K QQ QQ QQ QQ K K K STAIR D GUEST LAUNDRY STOR ICE QQ QQ QQ K STAIR C AQQS UNIT C-1 3BR APT UNIT S-2 STUDIO APT UNIT S-1 STUDIO APTUNIT B-1 2BR APT UNIT S-1 STUDIO APT UNIT A-1 1BR APT UNIT B-2 2BR APT UNIT B-3 2BR APT UNIT S-3 STUDIO APT UNIT S-1 STUDIO APT UNIT S-1 STUDIO APT LAUNDRY ELEC/IT JAN/TRASH/ RECYCLE STAIR B STAIR A UNIT S-1 STUDIO APT UNIT S-2 STUDIO APT62' - 0"76' - 3 3/4"31' - 5 3/4"148' - 8"62' - 0"160' - 9"31' - 2 1/4"62' - 0"62' - 0" 3' - 11"86' - 8" 1 32' - 4" 104' - 6" K 256' - 5 1/2"10' - 0"FILE: DRAWN BY: CHECKED BY: PROJ. NO: DRAWING NO: DRAWING TITLE: PROJECT NAME: 9,$/81$ )$,5),(/' ,11+27(/ M:\\18Proj\180647\600 Drawings\A\ 67/28,63$5.01 N O T FO R C O N S T R U C T IO NPRELIMINARY COPYRIGHT 2019 BY LHB, INC. ALL RIGHTS RESERVED. NO DATE ISSUED FOR THIS SQUARE APPEARS 1/2"x1/2" ON FULL SIZE SHEETS :DVKLQJWRQ$YH16WH_0LQQHDSROLV01_ A 1 CLIENT: 3RUWODQG$YHQXH6RXWK6XLWH 0LQQHDSROLV01 WHO 1 08.05.2019 PUD AMENDMENT 2 10.07.2019 PUD AMENDMENT 2 3 4 5 B C D 3 10.29.2019 PUD AMENDMENT RESPONSE BIM 360://180647 Via Luna and Fairfield Inn Hotel/180647 Place Hotel A19.rvt10/29/2019 12:02:26 PMA2.04 DJP NMV 180647 6287+6,7(+27(/ 5(6,'(17,$/ /(9(/ )/2253/$16 1 0 /2 9 /2 0 1 9 3/32" = 1'-0"1 LEVEL 3 FLOOR PLAN NO DATE REVISION 45 & $ BBBBBBBBBBBBBBBBBBBBB$ $ BBBBBBBBBBBBBBBBBBBBB & $ BBBBBBBBBBBBBBBBBBBBB & $ BBBBBBBBBBBBBBBBBBBBB A2.111C A2.121CA2.122C A 2 .1 11A A 2 .1 21A A2.10 1AA2.123A K ENGINEERS OFFICE AKS QQ K QQ QQ QQ K K QQ K QQ K QQ K K K K KS QQ KS K KS KS K AK K KSKK ICE LINEN STAIR D STAIR C UNIT B-2 2BR APT UNIT B-3 2BR APT UNIT S-3 STUDIO APT UNIT S-1 STUDIO APT UNIT S-1 STUDIO APT LAUNDRY UNIT S-1 STUDIO APT UNIT S-2 STUDIO APT UNIT C-1 3BR APT UNIT S-2 STUDIO APT UNIT S-1 STUDIO APTUNIT B-1 2BR APT UNIT S-1 STUDIO APT UNIT A-1 1BR APT 148' - 8"62' - 0"160' - 9"31' - 2 1/4"62' - 0" 3' - 11"86' - 8" ELEC JAN/TRASH/ RECYCLE STAIR B STAIR A EXIT ACCESS STAIR FILE: DRAWN BY: CHECKED BY: PROJ. NO: DRAWING NO: DRAWING TITLE: PROJECT NAME: 9,$/81$ )$,5),(/' ,11+27(/ M:\\18Proj\180647\600 Drawings\A\ 67/28,63$5.01 N O T FO R C O N S T R U C T IO NPRELIMINARY COPYRIGHT 2019 BY LHB, INC. ALL RIGHTS RESERVED. NO DATE ISSUED FOR THIS SQUARE APPEARS 1/2"x1/2" ON FULL SIZE SHEETS :DVKLQJWRQ$YH16WH_0LQQHDSROLV01_ A 1 CLIENT: 3RUWODQG$YHQXH6RXWK6XLWH 0LQQHDSROLV01 WHO 1 08.05.2019 PUD AMENDMENT 2 10.07.2019 PUD AMENDMENT 2 3 4 5 B C D 3 10.29.2019 PUD AMENDMENT RESPONSE BIM 360://180647 Via Luna and Fairfield Inn Hotel/180647 Place Via Luna Hotel A19.rvt10/30/2019 1:58:19 PMA2.05 DJP NMV 180647 6287+6,7(+27(/ 5(6,'(17,$/ /(9(/ )/2253/$16 1 0 /2 9 /2 0 1 9 3/32" = 1'-0"1 LEVEL 4 FLOOR PLAN NO DATE REVISION 46 & $ BBBBBBBBBBBBBBBBBBBBB$ $ BBBBBBBBBBBBBBBBBBBBB & $ BBBBBBBBBBBBBBBBBBBBB & $ BBBBBBBBBBBBBBBBBBBBB A2.111C A2.121CA2.122C A 2 .1 11A A 2 .1 2 1A A2.10 1AA2.123A ROOF TOP PATIO 737 SF QQ K K QQ ICE MATVCOMPUTER LINEN ROOF BELOW KS K K KS KS K K KS AK K K KSKKKK STAIR D UNIT S-1 STUDIO APT UNIT S-2 STUDIO APT UNIT S-2 STUDIO APT UNIT S-1 STUDIO APTUNIT B-1 2BR APT STAIR B LAUNDRY ELEC/ IT JAN/TRASH/ RECYCLEUNIT S-1 STUDIO APT UNIT A-1 1BR APT UNIT B-2 2BR APT UNIT B-3 2BR APT UNIT S-3 STUDIO APT UNIT S-1 STUDIO APT UNIT S-1 STUDIO APT QQ STAIR C 62' - 0"76' - 3 3/4"31' - 5 3/4"148' - 8"62' - 0"160' - 9"31' - 2 1/4"62' - 0"62' - 0" 3' - 11"86' - 8" 104' - 6" STAIR A SOLAR PERGOLA ABOVE 256' - 5 1/2" 1 32' - 4"DEAD END CORRIDOR46' - 6"SHIPS LADDER EXIT ACCESS STAIR PLANTER WITH ORNAMENTAL TREE, TYP. FILE: DRAWN BY: CHECKED BY: PROJ. NO: DRAWING NO: DRAWING TITLE: PROJECT NAME: 9,$/81$ )$,5),(/' ,11+27(/ M:\\18Proj\180647\600 Drawings\A\ 67/28,63$5.01 N O T FO R C O N S T R U C T IO NPRELIMINARY COPYRIGHT 2019 BY LHB, INC. ALL RIGHTS RESERVED. NO DATE ISSUED FOR THIS SQUARE APPEARS 1/2"x1/2" ON FULL SIZE SHEETS :DVKLQJWRQ$YH16WH_0LQQHDSROLV01_ A 1 CLIENT: 3RUWODQG$YHQXH6RXWK6XLWH 0LQQHDSROLV01 WHO 1 08.05.2019 PUD AMENDMENT 2 10.07.2019 PUD AMENDMENT 2 3 4 5 B C D 3 10.29.2019 PUD AMENDMENT RESPONSE BIM 360://180647 Via Luna and Fairfield Inn Hotel/180647 Place Hotel A19.rvt10/29/2019 12:02:36 PMA2.06 DJP NMV 180647 6287+6,7(+27(/ 5(6,'(17,$/ /(9(/ )/2253/$16 1 0 /2 9 /2 0 1 9 3/32" = 1'-0"1 LEVEL 5 FLOOR PLAN NO DATE REVISION 47 & $ BBBBBBBBBBBBBBBBBBBBB$ $ BBBBBBBBBBBBBBBBBBBBB & $ BBBBBBBBBBBBBBBBBBBBB & $ BBBBBBBBBBBBBBBBBBBBB A2.111C A2.121CA2.122C A 2 .1 1 1A A 2 .121A A2.10 1AA2.123A SOLAR PANELS, TYP. 3' WIDE SERVICE WALK SOLAR PERGOLA INTERIOR MECHANICAL STAIR D UNIT S-1 STUDIO APT UNIT S-2 STUDIO APT UNIT S-2 STUDIO APT UNIT S-1 STUDIO APT LAUNDRY ELEC/ IT JAN/TRASH/ RECYCLE UNIT S-1 STUDIO APT UNIT S-1 STUDIO APT UNIT S-3 STUDIO APT UNIT B-3 2BR APT UNIT B-2 2BR APT STAIR A UNIT A-1 1BR APT UNIT S-1 STUDIO APT STAIR B UNIT B-1 2BR APT ROOF BELOW ROOF BELOW STAIR C ROOF 62' - 0"76' - 3 3/4"31' - 5 3/4"148' - 8"100' - 7"60' - 2 1/4"31' - 2 1/4"62' - 0"62' - 0" 90' - 7" 1 32' - 4"69' - 6 3/4"41' - 10" 256' - 5 1/2"62' - 0"104' - 6" SHIPS LADDER STUDIO WORKSPACE STUDIO WORKSPACE STUDIO WORKSPACE STUDIO WORKSPACE STUDIO WORKSPACE STUDIO WORKSPACE STUDIO WORKSPACE STUDIO WORKSPACE STUDIO WORKSPACE STUDIO WORKSPACE STUDIO WORKSPACE STUDIO WORKSPACE CONDENSING WATER HEATERS KITCHEN MAKE-UP AIR UNIT ENERGY RECOVERY UNIT EXTERIOR MECHANICAL AIR COOLED CHILLERS FILE: DRAWN BY: CHECKED BY: PROJ. NO: DRAWING NO: DRAWING TITLE: PROJECT NAME: 9,$/81$ )$,5),(/' ,11+27(/ M:\\18Proj\180647\600 Drawings\A\ 67/28,63$5.01 N O T FO R C O N S T R U C T IO NPRELIMINARY COPYRIGHT 2019 BY LHB, INC. ALL RIGHTS RESERVED. NO DATE ISSUED FOR THIS SQUARE APPEARS 1/2"x1/2" ON FULL SIZE SHEETS :DVKLQJWRQ$YH16WH_0LQQHDSROLV01_ A 1 CLIENT: 3RUWODQG$YHQXH6RXWK6XLWH 0LQQHDSROLV01 WHO 1 08.05.2019 PUD AMENDMENT 2 10.07.2019 PUD AMENDMENT 2 3 4 5 B C D 3 10.29.2019 PUD AMENDMENT RESPONSE BIM 360://180647 Via Luna and Fairfield Inn Hotel/180647 Place Hotel A19.rvt10/29/2019 12:02:47 PMA2.07 DJP NMV 180647 6287+6,7(+27(/ 5(6,'(17,$/ /(9(/ )/2253/$16 1 0 /2 9 /2 0 1 9 3/32" = 1'-0"1 LEVEL 6 FLOOR PLAN NO DATE REVISION 48 & $ BBBBBBBBBBBBBBBBBBBBB$ $ BBBBBBBBBBBBBBBBBBBBB & $ BBBBBBBBBBBBBBBBBBBBB & $ BBBBBBBBBBBBBBBBBBBBB A2.111C A2.121CA2.122C A 2 .1 1 1A A 2 .121A A2.10 1AA2.123A ELEVATOR OVERRUN SOLAR PANELS -TYP 3' WIDE SERVICE WALK 3' W ID E S E R VIC E W A L K 3' W ID E S E R VIC E W A L K STAIR B ELEVATOR OVERRUN PERGOLA BELOW ROOF BELOW S O L A R P A N E L S - T Y P MECHANICAL PENTHOUSE 10' - 0 1/8"10' - 0 1/8"STAIR C ROOF STAIR D ROOF 76' - 3 3/4"31' - 5 3/4"148' - 8" 256' - 5 13/32" 3' - 11"86' - 8"62' - 0"62' - 0"100' - 5 5/8"60' - 3 3/8"1 32' - 4"62' - 0"104' - 6" BALCONY BELOW BALCONY BELOW BALCONY BELOW ACCESS PANEL BELOW WITH HOISTWAY BEAM ABOVE FOR EQUIPMENT REMOVAL ERU CONDENSIGN WATER HEATERSAIR-COOLED CHILLER EXTERIOR MECHANICAL PENTHOUSE BELOW FILE: DRAWN BY: CHECKED BY: PROJ. NO: DRAWING NO: DRAWING TITLE: PROJECT NAME: 9,$/81$ )$,5),(/' ,11+27(/ M:\\18Proj\180647\600 Drawings\A\ 67/28,63$5.01 N O T FO R C O N S T R U C T IO NPRELIMINARY COPYRIGHT 2019 BY LHB, INC. ALL RIGHTS RESERVED. NO DATE ISSUED FOR THIS SQUARE APPEARS 1/2"x1/2" ON FULL SIZE SHEETS :DVKLQJWRQ$YH16WH_0LQQHDSROLV01_ A 1 CLIENT: 3RUWODQG$YHQXH6RXWK6XLWH 0LQQHDSROLV01 WHO 1 08.05.2019 PUD AMENDMENT 2 10.07.2019 PUD AMENDMENT 2 3 4 5 B C D 3 10.29.2019 PUD AMENDMENT RESPONSE BIM 360://180647 Via Luna and Fairfield Inn Hotel/180647 Place Hotel A19.rvt10/29/2019 12:02:51 PMA2.08 DJP NMV 180647 6287+6,7(+27(/ 5(6,'(17,$/ /(9(/ )/2253/$16 1 0 /2 9 /2 0 1 9 3/32" = 1'-0"1 LEVEL 7 FLOOR PLAN NO DATE REVISION 49 EXTERIOR MATERIALS KEYTRANSPARENT SURFACE ANALYSIS LEVEL 1 HOTEL 915' -0" LEVEL 2 RES. 930' -10" LEVEL 3 RES. 942' -10" LEVEL 4 RES. 953' -10" LEVEL 5 RES. 964' -10" LEVEL 6 RES. 975' -10" LEVEL 2 HOTEL 930' -8" LEVEL 3 HOTEL 941' -8" LEVEL 4 HOTEL 952' -8" ROOF -RES. 987' -10" LEVEL 5 HOTEL 963' -8" ROOF -HOTEL 975' -8" LEVEL 1 RES. 915' -10" PH ROOF -HOTEL 985' -0" MAS1 MAS1 SF SF ECEC FCP2 FCP1 FCP3 FCP2 FCP5 PV FCP4 PV CO CO 0 0 0 0 D. HOTEL SIGNAGE 45 SF A. LIVE/WORK SIGNAGE 20 SF C. HOTEL SIGNAGE 15 SF B. RESTAURANT SIGNAGE 15 SF 0 0 0 0 I. BUILDING SIGNAGE 9' - 4"12' - 0"11' - 0"11' - 0"11' - 0"15' - 8"FCP3 EC FCP6 FCP1 MS ELEVATION FORESHORTENED COMS BUILDING ADDRESSBUILDING ADDRESS12' - 0"11' - 0"11' - 0"11' - 0"12' - 0"15' - 0"AN ADDRESS NUMBERS MAS1 DECORATIVE MASONRY (4x16) BAL PREMANUFACTURED ALUMINUM BALCONY (HUNG) CO PREFINISHED METAL COPING EC ENTRANCE CANOPY (FABRICATED STEEL) FCP1 FIBER CEMENT PANEL - RIBBED NICHIHA - BLUE FCP3 FIBER CEMENT PANEL - RIBBED NICHIHA - GRAY GR GUARD RAIL ML MECHANICAL LOUVER - PREFINISHED METAL MS MECHANICAL SCREEN - PREFINISHED METAL PV PHOTOVOLTAIC PANEL ARRAY (ROOFTOP) SF ALUMINUM STOREFRONT AD ART DISPLAY AREA FCP4 FIBER CEMENT PANEL - PANEL NICHIHA - GRAY FCP5 FIBER CEMENT PANEL - PANEL NICHIHA - WHITE FCP6 FIBER CEMENT PANEL - PANEL NICHIHA - CHARCOAL FCP2 FIBER CEMENT PANEL - RIBBED NICHIHA - WHITE GW GLASS WALL LEVEL 1 HOTEL 915' -0" LEVEL 0 904' -0" LEVEL 0 904' -0" LEVEL 2 RES. 930' -10" LEVEL 3 RES. 942' -10" LEVEL 4 RES. 953' -10" LEVEL 5 RES. 964' -10" LEVEL 6 RES. 975' -10" LEVEL 2 HOTEL 930' -8" LEVEL 3 HOTEL 941' -8" LEVEL 4 HOTEL 952' -8" ROOF -RES. 987' -10" LEVEL 5 HOTEL 963' -8" ROOF -HOTEL 975' -8" LEVEL 1 RES. 915' -10"11' - 10"15' - 0"12' - 0"11' - 0"11' - 0"11' - 0"12' - 0"10' - 0"PENTHOUSE RF -RES. 997' -10" PH ROOF -HOTEL 985' -0" QQ COFFEE SHOP 11' - 0"15' - 8"11' - 0"11' - 0"11' - 0"12' - 0"9' - 4"MAS1 SF EC PV PV PV MAS1 SF EC E. RESIDENTIAL ENTRY SIGNAGE 15 SF QQ QQ QQ QQ QQ EMPLOYEE BREAK FCP2 FCP1 CO FCP3 FCP3 CO FCP6 BAL FCP5 FCP2 FCP1 FCP4 CO MS GR MAS1 72' - 0"71' - 8"KEY PLAN - EXTERIOR ELEVATIONS FACADES IN PUBLIC RIGHT OF WAY (REQUIRING TRANSPARENT SURFACE ANALYSIS). SEE SHEET A2.10. / 3 A A 2.12 D -SOUTH BUILDING C -HOTEL BUILDING /1A A2.10/1 A A 2 .1 2 / 2 C A 2.12 /1C A2.10 /1C A2.10/3AA2.11/1 A A 2 .1 1 /1A A2.10 /2CA2.11/1CA2.11/1CA2.12PERCENT OF TRANSPARENT SURFACE AREA ALONG PEDESTRIAN RIGHT OF WAY (BETWEEN 2'-0" AND 8'-0" ABOVE GRADE) C - HOTEL BUILDING D - SOUTH ELEVATION TOTAL AREA BETWEEN 2'-0" & 8'-0" ABOVE GRADE TRANSPARENT SURFACE AREA % OF TRANSPARENT SURFACE AREA OF TOTAL D - SOUTHWEST ELEVATION TOTAL AREA BETWEEN 2'-0" & 8'-0" ABOVE GRADE TRANSPARENT SURFACE AREA % OF TRANSPARENT SURFACE AREA OF TOTAL D - NORTHWEST ELEVATION TOTAL AREA BETWEEN 2'-0" & 8'-0" ABOVE GRADE TRANSPARENT SURFACE AREA % OF TRANSPARENT SURFACE AREA OF TOTAL D - NORTHEAST ELEVATION TOTAL AREA BETWEEN 2'-0" & 8'-0" ABOVE GRADE TRANSPARENT SURFACE AREA % OF TRANSPARENT SURFACE AREA OF TOTAL D - EAST ELEVATION TOTAL AREA BETWEEN 2'-0" & 8'-0" ABOVE GRADE TRANSPARENT SURFACE AREA % OF TRANSPARENT SURFACE AREA OF TOTAL D - NORTH ELEVATION TOTAL AREA BETWEEN 2'-0" & 8'-0" ABOVE GRADE TRANSPARENT SURFACE AREA % OF TRANSPARENT SURFACE AREA OF TOTAL D - SOUTH BUILDING C - SOUTH ELEVATION TOTAL AREA BETWEEN 2'-0" & 8'-0" ABOVE GRADE TRANSPARENT SURFACE AREA % OF TRANSPARENT SURFACE AREA OF TOTAL C - WEST ELEVATION TOTAL AREA BETWEEN 2'-0" & 8'-0" ABOVE GRADE TRANSPARENT SURFACE AREA % OF TRANSPARENT SURFACE AREA OF TOTAL C - NORTHWEST ELEVATION TOTAL AREA BETWEEN 2'-0" & 8'-0" ABOVE GRADE TRANSPARENT SURFACE AREA % OF TRANSPARENT SURFACE AREA OF TOTAL 748.02 SF 498.01 SF 66.58 % 964.55 SF 638.53 SF 66.20 % 416.65 SF 256.28 SF 61.51 % 458.13 SF 280.51 SF 61.23 % 794.03 SF 476.01 SF 59.95% 382.25 SF 203.95 SF 25.69 % 532.56 SF 304.80 SF 57.23 % 372.13 SF 180.07 SF 48.39 % 284.55 SF 148.05 SF 52.03 % TOTAL ALL ELEVATIONS TOTAL AREA BETWEEN 2'-0" & 8'-0" ABOVE GRADE TRANSPARENT SURFACE AREA % OF TRANSPARENT SURFACE AREA OF TOTAL 4,952.87 SF 2,986.21 SF 60.30 % FILE: DRAWN BY: CHECKED BY: PROJ. NO: DRAWING NO: DRAWING TITLE: PROJECT NAME: 9,$/81$ )$,5),(/' ,11+27(/ M:\\18Proj\180647\600 Drawings\A\ 67/28,63$5.01 N O T FO R C O N S T R U C T IO NPRELIMINARY COPYRIGHT 2019 BY LHB, INC. ALL RIGHTS RESERVED. NO DATE ISSUED FOR THIS SQUARE APPEARS 1/2"x1/2" ON FULL SIZE SHEETS :DVKLQJWRQ$YH16WH_0LQQHDSROLV01_ A 1 CLIENT: 3RUWODQG$YHQXH6RXWK6XLWH 0LQQHDSROLV01 WHO 1 08.05.2019 PUD AMENDMENT 2 10.07.2019 PUD AMENDMENT 2 3 4 5 B C D 3 10.29.2019 PUD AMENDMENT RESPONSE BIM 360://180647 Via Luna and Fairfield Inn Hotel/180647 Place Hotel A19.rvt10/29/2019 12:07:24 PMA2.10 DJP SLD 180647 6287+6,7(+27(/ 5(6,'(17,$/ 1257+ 6287+(/(9$7,216 6(&7,216 1 0 /2 9 /2 0 1 9 3/32" = 1'-0"1A BUILDINGS C & D - SOUTH ELEVATION 3/32" = 1'-0"1C BUILDINGS C & D - NORTH ELEVATION MATERIAL CALCULATIONS - C & D - SOUTH ELEVATION MATERIAL AREA PERCENT CLASS 1 5/8" CEMENTITIOUS PANEL 11,220.04 SF 67% BRICK 1,027.19 SF 6% WINDOWS & STOREFRONT 3,895.59 SF 23% 16,142.82 SF 96% CLASS 2 METAL WRAPPED SUBSTRATE 658.56 SF 4% 658.56 SF 4% TOTAL 16,801.38 SF 100% MATERIAL CALCULATIONS - C & D - NORTH ELEVATION MATERIAL AREA PERCENT CLASS 1 5/8" CEMENTITIOUS PANEL 7,806.57 SF 68% BRICK 874.07 SF 8% WINDOWS & STOREFRONT 2,211.58 SF 19% 10,892.22 SF 95% CLASS 2 METAL WRAPPED SUBSTRATE 556.66 SF 5% 556.66 SF 5% TOTAL 11,448.88 SF 100% MATERIAL CALCULATIONS - C & D - TOTAL MATERIAL AREA PERCENT CLASS 1 5/8" CEMENTITIOUS PANEL 52,088.49 SF 66% BRICK 6,963.34 SF 9% WINDOWS & STOREFRONT 16,926.88 SF 21% 75,978.71 SF 96% CLASS 2 METAL WRAPPED SUBSTRATE 3,246.32 SF 4% 3,246.32 SF 4% TOTAL 79,225.03 SF 100% NO DATE REVISION 50 EXTERIOR MATERIALS KEY LEVEL 1 HOTEL 915' -0" LEVEL 2 HOTEL 930' -8" LEVEL 3 HOTEL 941' -8" LEVEL 4 HOTEL 952' -8" LEVEL 5 HOTEL 963' -8" ROOF -HOTEL 975' -8" PH ROOF -HOTEL 985' -0" PV FCP1 G. COFFEE SHOP SIGNAGE 10 SF FCP2 MAS1 SF ELEVATION FORESHORTENED 12' - 0"11' - 0"11' - 0"11' - 0"15' - 8"FCP1 MAS1 I. BUILDING SIGNAGE FCP2 CO FCP3 ML LEVEL 1 HOTEL 915' -0" LEVEL 0 904' -0" LEVEL 2 HOTEL 930' -8" LEVEL 3 HOTEL 941' -8" LEVEL 4 HOTEL 952' -8" LEVEL 5 HOTEL 963' -8" ROOF -HOTEL 975' -8" PH ROOF -HOTEL 985' -0" EC FCP3 MAS1 PV PV F. HOTEL SIGNAGE 45 SF9' - 4"12' - 0"11' - 0"11' - 0"11' - 0"15' - 8"11' - 0"SF FCP2 FCP1 COFCP3 LEVEL 1 HOTEL 915' -0" LEVEL 2 HOTEL 930' -8" LEVEL 3 HOTEL 941' -8" LEVEL 4 HOTEL 952' -8" LEVEL 5 HOTEL 963' -8" ROOF -HOTEL 975' -8" PH ROOF -HOTEL 985' -0" CO SF H. COFFEE SHOP SIGNAGE 10 SF I. BUILDING SIGNAGE 62 SF BLADE 12' - 0"11' - 0"11' - 0"11' - 0"15' - 8"FCP3 PV FCP2 FCP1 MAS1 ELEVATION FORESHORTENED AN ADDRESS NUMBERS MAS1 DECORATIVE MASONRY (4x16) BAL PREMANUFACTURED ALUMINUM BALCONY (HUNG) CO PREFINISHED METAL COPING EC ENTRANCE CANOPY (FABRICATED STEEL) FCP1 FIBER CEMENT PANEL - RIBBED NICHIHA - BLUE FCP3 FIBER CEMENT PANEL - RIBBED NICHIHA - GRAY GR GUARD RAIL ML MECHANICAL LOUVER - PREFINISHED METAL MS MECHANICAL SCREEN - PREFINISHED METAL PV PHOTOVOLTAIC PANEL ARRAY (ROOFTOP) SF ALUMINUM STOREFRONT AD ART DISPLAY AREA FCP4 FIBER CEMENT PANEL - PANEL NICHIHA - GRAY FCP5 FIBER CEMENT PANEL - PANEL NICHIHA - WHITE FCP6 FIBER CEMENT PANEL - PANEL NICHIHA - CHARCOAL FCP2 FIBER CEMENT PANEL - RIBBED NICHIHA - WHITE GW GLASS WALL KEY PLAN - EXTERIOR ELEVATIONS FACADES IN PUBLIC RIGHT OF WAY (REQUIRING TRANSPARENT SURFACE ANALYSIS). SEE SHEET A2.10. / 3 A A 2.12 D -SOUTH BUILDING C -HOTEL BUILDING /1A A2.10/1 A A 2 .1 2 / 2 C A 2.12 /1C A2.10 /1C A2.10/3AA2.11/1 A A 2 .1 1 /1A A2.10 /2CA2.11/1CA2.11/1CA2.12FILE: DRAWN BY: CHECKED BY: PROJ. NO: DRAWING NO: DRAWING TITLE: PROJECT NAME: 9,$/81$ )$,5),(/' ,11+27(/ M:\\18Proj\180647\600 Drawings\A\ 67/28,63$5.01 N O T FO R C O N S T R U C T IO NPRELIMINARY COPYRIGHT 2019 BY LHB, INC. ALL RIGHTS RESERVED. NO DATE ISSUED FOR THIS SQUARE APPEARS 1/2"x1/2" ON FULL SIZE SHEETS :DVKLQJWRQ$YH16WH_0LQQHDSROLV01_ A 1 CLIENT: 3RUWODQG$YHQXH6RXWK6XLWH 0LQQHDSROLV01 WHO 1 08.05.2019 PUD AMENDMENT 2 10.07.2019 PUD AMENDMENT 2 3 4 5 B C D 3 10.29.2019 PUD AMENDMENT RESPONSE BIM 360://180647 Via Luna and Fairfield Inn Hotel/180647 Place Hotel A19.rvt10/29/2019 12:07:37 PMA2.11 DJP SLD 180647 6287+6,7(+27(/ 5(6,'(17,$/ ($67 :(67(/(9$7,216 6(&7,216 1 0 /2 9 /2 0 1 9 3/32" = 1'-0"1A BUILDING C - NORTHWEST ELEVATION 3/32" = 1'-0"1C BUILDING C - EAST ELEVATION 02 3/32" = 1'-0"2C BUILDING C - EAST ELEVATION 01 3/32" = 1'-0"3A BUILDING C - WEST ELEVATION MATERIAL CALCULATIONS - C - WEST ELEVATION MATERIAL AREA PERCENT CLASS 1 5/8" CEMENTITIOUS PANEL 6,071.45 SF 64% BRICK 768.90 SF 8% WINDOWS & STOREFRONT 1,949.11 SF 21% 8,789.46 SF 93% CLASS 2 METAL WRAPPED SUBSTRATE 626.41 SF 7% 626.41 SF 7% TOTAL 9,415.87 SF 100% MATERIAL CALCULATIONS - C - EAST ELEVATION MATERIAL AREA PERCENT CLASS 1 5/8" CEMENTITIOUS PANEL 7,998.11 SF 67% BRICK 1,852.10 SF 16% WINDOWS & STOREFRONT 1,561.25 SF 13% 11,411.46 SF 96% CLASS 2 METAL WRAPPED SUBSTRATE 524.52 SF 4% 524.52 SF 4% TOTAL 11,935.98 SF 100% MATERIAL CALCULATIONS - C - NORTHWEST ELEVATION MATERIAL AREA PERCENT CLASS 1 5/8" CEMENTITIOUS PANEL 2,585.97 SF 67% BRICK 415.50 SF 11% WINDOWS & STOREFRONT 749.39 SF 19% 3,750.86 SF 98% CLASS 2 METAL WRAPPED SUBSTRATE 94.64 SF 2% 94.64 SF 2% TOTAL 3,845.50 SF 100% NO DATE REVISION 51 EXTERIOR MATERIALS KEY LEVEL 0 904' -0" LEVEL 2 RES. 930' -10" LEVEL 3 RES. 942' -10" LEVEL 4 RES. 953' -10" LEVEL 5 RES. 964' -10" LEVEL 6 RES. 975' -10" ROOF -RES. 987' -10" LEVEL 1 RES. 915' -10" PENTHOUSE RF -RES. 997' -10"82' - 0"12' - 0"11' - 0"11' - 0"11' - 0"12' - 0"15' - 0"LEVEL 2 RES. 930' -10" LEVEL 3 RES. 942' -10" LEVEL 4 RES. 953' -10" LEVEL 5 RES. 964' -10" LEVEL 6 RES. 975' -10" ROOF -RES. 987' -10" LEVEL 1 RES. 915' -10" PENTHOUSE RF -RES. 997' -10"12' - 0"11' - 0"11' - 0"11' - 0"12' - 0"15' - 0"VERTICAL CLEARANCE23' - 11"GWADECMAS1SF FCP4 FCP5FCP2 BAL FCP1 LEVEL 2 RES. 930' -10" LEVEL 3 RES. 942' -10" LEVEL 4 RES. 953' -10" LEVEL 5 RES. 964' -10" LEVEL 6 RES. 975' -10" ROOF -RES. 987' -10" LEVEL 1 RES. 915' -10" PENTHOUSE RF -RES. 997' -10" MAS1 SFAD FCP5 FCP2 FCP5 FCP1 COPV ELEVATION FORESHORTENED 12' - 0"11' - 0"11' - 0"11' - 0"12' - 0"15' - 0"LEVEL 2 RES. 930' -10" LEVEL 3 RES. 942' -10" LEVEL 4 RES. 953' -10" LEVEL 5 RES. 964' -10" LEVEL 6 RES. 975' -10" ROOF -RES. 987' -10" LEVEL 1 RES. 915' -10" PENTHOUSE RF -RES. 997' -10" SF J. RESIDENTIAL BUILDING SIGNAGE 62 SF AD FCP4 FCP5 FCP2FCP3 CO MS PV FCP1 MAS1 12' - 0"11' - 0"11' - 0"11' - 0"12' - 0"15' - 0"AN ADDRESS NUMBERS MAS1 DECORATIVE MASONRY (4x16) BAL PREMANUFACTURED ALUMINUM BALCONY (HUNG) CO PREFINISHED METAL COPING EC ENTRANCE CANOPY (FABRICATED STEEL) FCP1 FIBER CEMENT PANEL - RIBBED NICHIHA - BLUE FCP3 FIBER CEMENT PANEL - RIBBED NICHIHA - GRAY GR GUARD RAIL ML MECHANICAL LOUVER - PREFINISHED METAL MS MECHANICAL SCREEN - PREFINISHED METAL PV PHOTOVOLTAIC PANEL ARRAY (ROOFTOP) SF ALUMINUM STOREFRONT AD ART DISPLAY AREA FCP4 FIBER CEMENT PANEL - PANEL NICHIHA - GRAY FCP5 FIBER CEMENT PANEL - PANEL NICHIHA - WHITE FCP6 FIBER CEMENT PANEL - PANEL NICHIHA - CHARCOAL FCP2 FIBER CEMENT PANEL - RIBBED NICHIHA - WHITE GW GLASS WALL KEY PLAN - EXTERIOR ELEVATIONS FACADES IN PUBLIC RIGHT OF WAY (REQUIRING TRANSPARENT SURFACE ANALYSIS). SEE SHEET A2.10. / 3 A A 2.12 D -SOUTH BUILDING C -HOTEL BUILDING /1A A2.10/1 A A 2 .1 2 / 2 C A 2.12 /1C A2.10 /1C A2.10/3AA2.11/1 A A 2 .1 1 /1A A2.10 /2CA2.11/1CA2.11/1CA2.12FILE: DRAWN BY: CHECKED BY: PROJ. NO: DRAWING NO: DRAWING TITLE: PROJECT NAME: 9,$/81$ )$,5),(/' ,11+27(/ M:\\18Proj\180647\600 Drawings\A\ 67/28,63$5.01 N O T FO R C O N S T R U C T IO NPRELIMINARY COPYRIGHT 2019 BY LHB, INC. ALL RIGHTS RESERVED. NO DATE ISSUED FOR THIS SQUARE APPEARS 1/2"x1/2" ON FULL SIZE SHEETS :DVKLQJWRQ$YH16WH_0LQQHDSROLV01_ A 1 CLIENT: 3RUWODQG$YHQXH6RXWK6XLWH 0LQQHDSROLV01 WHO 1 08.05.2019 PUD AMENDMENT 2 10.07.2019 PUD AMENDMENT 2 3 4 5 B C D 3 10.29.2019 PUD AMENDMENT RESPONSE BIM 360://180647 Via Luna and Fairfield Inn Hotel/180647 Place Hotel A19.rvt10/29/2019 12:08:04 PMA2.12 DJP SLD 180647 6287+6,7(+27(/ 5(6,'(17,$/ (/(9$7,216 6(&7,216 1 0 /2 9 /2 0 1 9 3/32" = 1'-0"5C RESIDENTIAL - TYPICAL BUILDING SECTION 3/32" = 1'-0"1C BUILDING D - EAST ELEVATION 3/32" = 1'-0"2C BUILDING D - NORTHEAST ELEVATION 3/32" = 1'-0"1A BUILDING D - NORTHWEST ELEVATION 3/32" = 1'-0"3A BUILDING D - SOUTHWEST ELEVATION MATERIAL CALCULATIONS - D - SOUTHWEST ELEVATION MATERIAL AREA PERCENT CLASS 1 5/8" CEMENTITIOUS PANEL 6,550.08 SF 64% BRICK 697.75 SF 7% WINDOWS & STOREFRONT 2,652.56 SF 26% 9,900.39 SF 97% CLASS 2 METAL WRAPPED SUBSTRATE 317.12 SF 3% 317.12 SF 3% TOTAL 10,217.51 SF 100% MATERIAL CALCULATIONS - D - NORTHWEST ELEVATION MATERIAL AREA PERCENT CLASS 1 5/8" CEMENTITIOUS PANEL 3,041.73 SF 62% BRICK 389.79 SF 8% WINDOWS & STOREFRONT 1,259.50 SF 26% 4,691.02 SF 95% CLASS 2 METAL WRAPPED SUBSTRATE 239.36 SF 5% 239.36 SF 5% TOTAL 4,930.38 SF 100% MATERIAL CALCULATIONS - D - NORTHEAST ELEVATION MATERIAL AREA PERCENT CLASS 1 5/8" CEMENTITIOUS PANEL 4,334.19 SF 63% BRICK 460.24 SF 7% WINDOWS & STOREFRONT 1,892.74 SF 28% 6,687.17 SF 98% CLASS 2 METAL WRAPPED SUBSTRATE 166.92 SF 2% 166.92 SF 2% TOTAL 6,854.09 SF 100% MATERIAL CALCULATIONS - D - EAST ELEVATION MATERIAL AREA PERCENT CLASS 1 5/8" CEMENTITIOUS PANEL 2,480.35 SF 66% BRICK 477.80 SF 13% WINDOWS & STOREFRONT 575.09 SF 15% WINDOWS & STOREFRONT 180.07 SF 5% 3,713.31 SF 98% CLASS 2 METAL WRAPPED SUBSTRATE 62.13 SF 2% 62.13 SF 2% TOTAL 3,775.44 SF 100% NO DATE REVISION 52 FILE: DRAWN BY: CHECKED BY: PROJ. NO: DRAWING NO: DRAWING TITLE: PROJECT NAME: 9,$/81$ )$,5),(/' ,11+27(/ M:\\18Proj\180647\600 Drawings\A\ 67/28,63$5.01 N O T FO R C O N S T R U C T IO NPRELIMINARY COPYRIGHT 2019 BY LHB, INC. ALL RIGHTS RESERVED. NO DATE ISSUED FOR THIS SQUARE APPEARS 1/2"x1/2" ON FULL SIZE SHEETS :DVKLQJWRQ$YH16WH_0LQQHDSROLV01_ A 1 CLIENT: 3RUWODQG$YHQXH6RXWK6XLWH 0LQQHDSROLV01 WHO 1 08.05.2019 PUD AMENDMENT 2 10.07.2019 PUD AMENDMENT 2 3 4 5 B C D 3 10.29.2019 PUD AMENDMENT RESPONSE BIM 360://180647 Via Luna and Fairfield Inn Hotel/180647 Place Hotel A19.rvt10/29/2019 12:08:07 PMA4.01 SCS NMV 180647 '9,(: 1 0 /2 9 /2 0 1 9 1 1/2" = 1'-0"1 PERSPECTIVE VIEW OF SOUTH BUILDINGS FROM 36TH STREET NO DATE REVISION 53 15'30' 60' Scale: 1" = 30' PLANTING PLAN1 GENERAL LANDSCAPE NOTES: 1. THIS DRAWING DOES NOT CONSTITUTE AN OFFICIAL SURVEY OF THE SITE. CONFIRM ALL LOCATIONS OF SURFACE AND SUB-SURFACE FEATURES BEFORE BEGINNING INSTALLATION. ADVISE LANDSCAPE ARCHITECT OF ANY DISCREPANCIES. 2. CONFIRM ALL QUANTITIES, SHAPES AND LOCATIONS OF BEDS, AND ADJUST AS REQUIRED TO CONFORM TO THE SITE CONDITIONS. CONFIRM ANY ADJUSTMENTS WITH THE LANDSCAPE ARCHITECT. 3. LOCATE ALL UTILITIES. NOTIFY THE LANDSCAPE ARCHITECT OF ANY CONFLICTS WITH PLANT INSTALLATION. 4. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL MULCHES AND PLANTING SOIL QUANTITIES TO COMPLETE THE WORK SHOWN ON THE PLAN. VERIFY ALL QUANTITIES SHOWN ON THE PLANT SCHEDULE. 5. THE CONTRACTOR SHALL REMOVE FROM THE SITE ALL SOD/TURF WHICH HAS BEEN REMOVED FOR NEW PLANT BEDS. LONG-TERM STORAGE OF MATERIALS OR SUPPLIES ON-SITE WILL NOT BE ALLOWED. ANY PLANT STOCK NOT PLANTED ON DAY OF DELIVERY SHALL BE HEELED IN AND WATERED UNTIL INSTALLATION. PLANTS NOT MAINTAINED IN THIS MANNER WILL BE REJECTED. 6. THE PLAN TAKES PRECEDENCE OVER THE PLANT SCHEDULE IF DISCREPANCIES EXIST. ADVISE LANDSCAPE ARCHITECT OF ANY DISCREPANCIES. PROTECTIONS 7. THE CONTRACTOR SHALL AVOID DAMAGING EXISTING TREES. DO NOT STORE OR DRIVE HEAVY MATERIALS OVER TREE ROOTS. DO NOT DAMAGE TREE BARK OR BRANCHES. 8. THE CONTRACTOR SHALL KEEP PAVEMENTS, FIXTURES AND BUILDINGS CLEAN AND UNSTAINED. ANY DAMAGE TO EXISTING FACILITIES SHALL BE REPAIRED AT THE CONTRACTOR'S EXPENSE. THE PROJECT SITE SHALL BE KEPT CLEAR OF CONSTRUCTION WASTES AND DEBRIS. 9. PROVIDE SILT FENCE IF NECESSARY TO PROTECT STREET FROM EROSION. 10. SOD ALL AREAS DISTURBED BY CONSTRUCTION. TPI CERTIFIED TURFGRASS SOD QUALITY; 80% KENTUCKY BLUE GRASS, 20% PERENNIAL RYE; WITH STRONG FIBROUS ROOT SYSTEM, FREE OF STONES, BURNED OR BARE SPOTS; CONTAINING NO MORE THAN 5 WEEDS PER 1000 SQ FT. MINIMUM AGE OF 18 MONTHS, WITH ROOT DEVELOPMENT THAT WILL SUPPORT ITS OWN WEIGHT WITHOUT TEARING WHEN SUSPENDED VERTICALLY BY HOLDING THE UPPER TWO CORNERS. PLANT MATERIAL 11. NO SUBSTITUTIONS OF PLANT MATERIAL SHALL BE ACCEPTED UNLESS APPROVED IN WRITING BY THE LANDSCAPE ARCHITECT. THE LANDSCAPE ARCHITECT RESERVES THE RIGHT TO REJECT ANY PLANTS WHICH ARE DEEMED UNSATISFACTORY. 12. ALL PLANTING STOCK SHALL CONFORM TO THE "AMERICAN STANDARD FOR NURSERY STOCK", ANSI-Z60. LATEST EDITION, OF THE AMERICAN ASSOCIATION OF NURSERYMEN, INC. 13. ALL PLANTS SHALL BE GUARANTEED FOR TWO COMPLETE GROWING SEASONS (APRIL 1-NOVEMBER 1 OF FOLLOWING YEAR), UNLESS OTHERWISE SPECIFIED. THE GUARANTEE SHALL COVER THE FULL COST OF REPLACEMENT INCLUDING LABOR AND PLANTS. IRRIGATION 14. PROVIDE AN IRRIGATION PLAN, TO BE APPROVED BY THE LANDSCAPE ARCHITECT. 15. IRRIGATION SERVICE SHALL BE PROVIDED FOR ALL AREAS NOTED ON THE PLANTING PLAN. DRIP LINE IRRIGATION WILL NOT BE ACCEPTED. REFER TO 32 8200. 16. IRRIGATION SYSTEM TO CONNECT TO CISTERN IN PARKING STRUCTURE MECHANICAL ROOM. COORDINATE WITH RAINWATER HARVESTING SYSTEM. PROVIDE CITY WATER CONNECTION AS BACK-UP THAT WILL BE DEACTIVATED IN 3 YEARS AFTER PLANT ESTABLISHMENT. 17. IRRIGATION IN URBAN RAINGARDEN AREAS TO BE USED FOR PLANTING ESTABLISHMENT ONLY. ESTIMATED PERIOD OF USE BEFORE DEACTIVATION IS 3 YEARS. OTHER MATERIAL 18. PROVIDE SHREDDED HARDWOOD MULCH, CLEAN AND FREE OF NOXIOUS WEEDS OR OTHER DELETERIOUS MATERIAL, DELIVER MULCH ON DAY OF INSTALLATION. USE 2" DEPTH FOR PERENNIAL/GROUND COVER BEDS, UNLESS OTHERWISE DIRECTED. APPLY PELLET WEED PREVENTER UNDER MULCH BEDS IN SHRUB AREAS. SOILS AND GROUND 19. SOIL CORRECTION FOR TREES, SHRUBS AND TURF: DISC SOIL TO A FULL 5" DEPTH IN ALL AREAS TO BE PLANTED TO LOOSEN COMPACTED SOILS. IDENTIFY AND PROTECT ROOTS OF EXISTING TREES. 20. THE INTENT IS TO USE EXISTING TOPSOIL FOR ALL PLANTING SOIL IN TREE, SHRUB AND PERENNIAL AREAS. IF THE EXISTING TOPSOIL DOES NOT MEET REQUIREMENTS FOR PLANTING, IMPORTED PLANTING SOIL SHOULD BE USED THAT MEETS TESTING AGENCY'S REQUIREMENTS AND AT A MINIMUM SHOULD BE COMPOSED OF: o A UNIFORM MIXTURE OF 1 PART SAND, 1 PART RE-PEET, AND 1 PART TOPSOIL BY VOLUME. MAINTENANCE AND CARE 21. MAINTENANCE SHALL BEGIN IMMEDIATELY AFTER EACH PORTION OF THE WORK IS IN PLACE. PLANT MATERIAL SHALL BE PROTECTED AND MAINTAINED UNTIL THE INSTALLATION OF PLANTINGS IS COMPLETE, INSPECTION HAS BEEN MADE AND PLANTING IS ACCEPTED EXCLUSIVE OF THE GUARANTEE. 22. MAINTENANCE SHALL INCLUDE WATERING, WEEDING, MULCHING, REMOVAL OF DEAD MATERIAL PRIOR TO GROWING SEASON, RE-SETTING PLANTS AND PROPER GRADE, AND KEEPING PLANTS IN A PLUMB POSITION. AFTER ACCEPTANCE, THE OWNER SHALL ASSUME MAINTENANCE RESPONSIBILITIES. HOWEVER, THE CONTRACTOR SHALL CONTINUE TO BE RESPONSIBLE FOR KEEPING THE TREES PLUMB THROUGHOUT THE GUARANTEE PERIOD. 23. WATERING: MAINTAIN A WATERING SCHEDULE WHICH WILL THOROUGHLY WATER ALL PLANTS ONCE A WEEK. IN EXTREMELY HOT, DRY WEATHER, WATER MORE OFTEN AS REQUIRED BY INDICATIONS OF HEAT STRESS SUCH AS WILTING LEAVES. CHECK MOISTURE UNDER MULCH PRIOR TO WATERING TO DETERMINE NEED. CONTRACTOR SHALL MAKE THE NECESSARY ARRANGEMENTS FOR WATER. (Assume 1' of conifer height = 0.415 caliper inches) 3.32"Cal (Assume 1' of conifer height = 0.415 caliper inches) 3.32"Cal>>>>>>>>>>>lllllllll>>FM FM FM FM FM FM FM FM FM F FM FM FM FM FM FM FM FM FM >>>>> > > > > > > > l l l l l l l l l llllllll l lllllllllll> SS >> >>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>E-B E-B E-B E-B E-B E-B E-B E-B FO-B FO-B FO-B FO-B FO-B FO-B FO-B FO-B FO-B -B FO-B FO-B FO-B FO-B FO-B FO-B FO-B OHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHP O OHP OHP OHP OHP OHPOHPllll S S S DORA ROOFTOP PATIO: 732 SF DORA PERFORMANCE SPACE: 1,035 SF 4 BN 4 BN 4 VP 1 PM 7 PP 7 CV 3 MS 9 PS 3 AR 5 TW 3 TW 6 HL 3 GI 3 QB 4 VL IRRIGATION ZONE, TYP. IRRIGATION POINT-OF-CONNECTION: CISTERN IN PARKING STRUCTURE MECHANICAL ROOM SEAT WALL "DUNE" BERMS, TYP. SEE 1/L501 EXTENTS OF SUBSURFACE PARKING, TYP. EASEMENT, TYP. CONIFER CODE QTY BOTANICAL / COMMON NAME CONT CAL PS 9 Pinus sylvestris / Scotch Pine 8` B&B TW 8 Thuja occidentalis `Walter Brown` / Techny Gold Arborvitae 8` B&B DECIDUOUS CODE QTY BOTANICAL / COMMON NAME CONT CAL AR 3 Acer rubrum `Bailcraig` / Scarlet Jewel Red Maple B&B 2.5"Cal BN 8 Betula nigra / River Birch B&B 2.5"Cal CV 7 Chionanthus virginicus / White Fringetree B&B 2.5"Cal GI 3 Gleditsia triacanthos inermis `Skycole` TM / Skyline Thornless Honey Locust B&B 2.5"Cal HL 6 Hydrangea paniculata `Limelight` / Limelight Hydrangea B&B 1.5"Cal MS 3 Malus x `Snowdrift` / Snowdrift Crab Apple B&B 2.5"Cal PP 7 Populus tremuloides `Prairie Gold` Clump / Prairie Gold Aspen B&B 2.5"Cal PM 1 Prunus maackii / Amur Chokecherry B&B 2.5"Cal QB 3 Quercus bicolor / Swamp White Oak B&B 2.5"Cal VL 4 Viburnum lentago / Nannyberry Tree (Single Stem)B&B 2"Cal VP 4 Viburnum prunifolium / Blackhaw Viburnum B&B 2.5"Cal GROUND COVERS CODE QTY BOTANICAL / COMMON NAME CONT NOTES NF 410 sf No-Mow Fesuce Blend Sod None PI 1,165 sf Planted Infiltration Area None SP 6,658 sf Shrub and Perennial Garden None PLANT SCHEDULE 54 4'-0"NOT TO SCALE PERENNIAL PLANTING4 EQ.EQ.EQ.EQ. REMOVE CONTAINER MULCH (4" DEEP) REFER TO SPECIFICATION FINISHED GRADE LOOSENED SUBSOIL SUBSOILSECTION PLAN NOT TO SCALE DECIDUOUS TREE1 3' MIN. 6' STEEL STAKE 16" POLYPROPYLENE OR POLYETHYLENE (40 ML, 1-1/2" WIDE STRAP) (TYPICAL) DOUBLE STRAND 14 GA. WIRE, 3 SPACED EQUALLY AT OPPOSITE SIDES HARDWOOD MULCH (6" DEEP) PLANTING, PER PLAN ROOTBALL TO SIT ON SUBGRADE CUT ALL ROPES AND REMOVE INORGANIC CONTAINERS AND SEE DETAIL 5/L500 SUBGRADE MOUNDED SUBGRADE SOIL WITH CIRCULAR DRAINAGE TRENCH SURROUNDING NOT TO SCALE SHRUB PLANTING3 HARDWOOD MULCH (4" DEEP) GROUNDCOVER, PER PLAN APPROVED SUBGRADE SLIT ORGANIC CONTAINER, OR REMOVE INORGANIC CONT. AND SEE DETAIL 5/L500 SEE PLANS FOR SPACING NOT TO SCALE BOXING PROCEDURE FOR CONTAINERIZED PLANTS5 SECTION PLAN SOIL MASS/ROOT BALL REMOVE ENCIRCLING ROOTS >14" DIA. WITH A CLEAN SAW, CUTTING OFF ALL SIDES BACKFILL SOIL MULCH PLANTING SOIL PLANT ACCORDING TO SHRUB AND TREE PLANTING DETAILS ON THIS SHEET 2:1 MAX. SLOPE. RESTORE TO MATCH SURROUNDING TURF NOT TO SCALE TREE ON SLOPE7 PLANTING SOIL, PER SPECIFICATION 31 2323. MAY USE CONTINUOUS LAYER DEPENDING ON PLANT SPACING PLANTING SOIL, PER SPECIFICATION 31 2323 TOPSOIL, PER SPECIFICATION 31 2323 PLANTING SOIL,PER SPECIFICATION 31 2323 TOPSOIL, PER SPECIFICATION 31 2323 NOT TO SCALE PLUG PLANTING DETAIL FOR PLANTED INFILTRATION AREAS6 PLAN SECTION AT BASIN EDGE IN BASIN CENTER FORBS: GRASSES & SEDGES: BLACK EYED SUSAN (rudbeckia hirta) WILD BERGAMOT (monarda fistulosa) BONESET (eupatorium perfoliatum) GOLDEN ALEXANDER (zizia aurea) IRONWEED (vernonia fasciculata) BLUE FLAG IRIS (iris versicolor) SWAMP MILKWEED (asclepias incarnata) BLUE VERVAIN (verbena hastata) FRINGED BROME (bromus ciliatus) TUSSOCK SEDGE (carex stricta) INDIAN GRASS (sorgastrum nutans) WOOLGRASS (scirpus cyperinus) GREEN BULRUSH (scirpus atrovirens) POINTED BROOM SEDGE (carex scoparia) BASIN PLUG MIX: EXISTING GRADE CUT AREA MULCH 2" DEEP) REFER TO SPECIFICATION 18" O.C. NOT TO SCALE CONCRETE BOLLARD8 SURROUNDING CONCRETE SEE CIVIL 6" NOMINAL SIZE STANDARD SEAMLESS GALVANIZED STEEL PIPE, FINISH TBD CONCRETE FILLED WITH ROUNDED EDGE COMPACTED AGGREGATE BASE SEE CIVIL CONCRETE FOOTING 6" AGGREGATE BASE, COMPACTED TO 90% DENSITY IN 6" LIFTS COMPACTED SOIL ℄2"4'-0"6" 15" 6" NOTES: 1. FOR TREES, SHRUBS, AND PERENNIALS WITH INORGANIC CONTAINERS, FOLLOW THE "BOXING" PROCEDURE TO REMOVE ENCIRCLING ROOTS. 2. "BOXING" IS ONLY NECESSARY ON THE PLANTS THAT HAVE ENCRICLING ROOTS WITH DIAMETERS GREATER THAN 14" 3. HAND LOOSENING OF ROOTS IS STILL NECESSARY AFTER "BOXING" THE ROOT BALL (TYPICAL). PLANTING ON A SLOPE NOTE: 1. EXTEND EXCAVATION AND BACKFILL SOIL TO A POINT DOWNSLOPE EQUAL TO OR LOWER IN ELEVATION THAN THE BOTTOM OF THE HOLE DIRECTLY BENEATH THE PLANT TO ENSURE ADEQUATE DRAINAGE IN HEAVY SOILS. GRANULAR SOIL MUST BE ADDED AS BACKFILL IN AREAS OF POOR DRAINAGE. NOTES: 1. SEED MIX TO BE PLACED BETWEEN PLUG PLANTINGS. 2. SPREAD MULCH DELICATELY AROUND PLUGS. ALL PLUG VEGETATION SHALL BE ABOVE MULCH COVER FOR FINAL APPROVAL. NOTE: REFER TO PLAN FOR SPACING. NOTES: 1. HAND LOOSEN ROOTS OF CONTAINERIZED MATERIAL (TYPICAL). 2. HAND REMOVE EXCESS SOIL AT TOP OF ROOT BALL TO EXPOSE TOP OF ROOT FLARE. TYPICALLY REQUIRES THE REMOVAL OF 1-6" OF SOIL FROM CONTAINER OR B&B. 3. ENSURE THAT FIRST MAIN LATERAL ROOT IS LESS THAN 1" BELOW THE FINAL PLANTING SURFACE. 4. SCARIFY BOTTOM AND SIDES OF HOLE PRIOR TO PLANTING. 5. SHRUBS TO SIT ON SUBGRADE. 6. APPLY PELLET WEED PREVENTER PRIOR TO MULCHING. NOT TO SCALE CONIFEROUS TREE2 16" POLYPROPYLENE OR POLYETHYLENE (40 ML, 1-1/2" WIDE STRAP) (TYPICAL) FLAGGING (ONE PER WIRE) MULCH (6" DEEP) DOUBLE-SHREDDED UNDYED HARDWOOD TOPSOIL, PER SPECIFICATION 2" x 2" x 24" WOOD STAKE, SET AT ANGLE SURROUNDING PLANTING MATERIAL, SEE PLAN ROOTBALL TO SIT ON SUBGRADE, CUT ALL ROPES AND REMOVE INORGANIC CONTAINERS; SEE 5/C7.20 SUBGRADE MOUNDED SUBGRADE SOIL WITH CIRCULAR DRAINAGE TRENCH SURROUNDING 6'-0" STEEL STAKE DOUBLE STRAND 14 GA. WIRE 3'-0" @ 120' INTERVALS, TYP.4'-0" +/-3'-0" MIN.NOT TO SCALE BIKE RACK9 NOT TO SCALE WOONERF FOUNTAIN CURB10 METAL TRENCH GRATE2'-0" CONCRETE CURB 6"1"36" FROM CURB WOONERF SURFACE VARIES CONNECTION FOR RECIRCULATED RAINWATER FOUNTAIN PAVING SEE CIVIL TRENCH DRAIN 48" (36" MIN)SECTION AXON LAYOUT ADJACENT TO ROAD LAYOUT ADJACENT TO BUILDING24" FROM WALL48" (36" MIN) COMPACTED BASE SEE CIVIL NOTE: 1. INTERACTIVE FOUNTAIN HAS YET TO BE DESIGNED. FOUNTAIN CURB DETAIL SUBJECT TO CHANGE AS DESIGN OF INTERACTIVE FOUNTAIN IS FURTHER DEVELOPED. 2. CURB IS DESIGNED TO DEFLECT STORMWATER FROM FOUNTAIN. FOUNTAIN WILL BE FED BY CISTERN/ROOF RAINWATER AND IS INTENDED TO BE RECIRCULATING. PARKING ROOF DECK SEE STRUCTURAL 55 NOT TO SCALE AT GRADE TREE TRENCH PLANTER2 NOT TO SCALE "DUNE" BERM1 NOT TO SCALE URBAN RAINGARDEN3 WIDTH VARIES 96'-0" MIN 36'-5" MINADA ACCESSIBLE GRATE PLANTING SOIL CONCRETE PAVING WITH THICKENED CONCRETE EDGE DRAINAGE AGGREGATE DRAINTILE SUBGRADE GEOTEXTILE AGGREGATE 36'-5" MINPLANTINGS PLANTING SOIL CONCRETE PAVING WITH THICKENED CONCRETE EDGE DRAINAGE AGGREGATE DRAINTILE SUBGRADE GEOTEXTILE AGGREGATE TRENCH WITH BRIDGE TRENCH WITH PLANTINGS MULCH 12'-0"WIDTH VARIES 96'-0" MIN 12'-0"FASTENER COR-TEN STEEL PLATE GEOTEXTILE CONCRETE OR PAVERS, WITH THICKENED EDGE SEE CIVIL COMPACTED BASE SEE CIVIL GEOFOAM DRAINAGE AGGREGATE WITH 4" PVC PIPE UNDERDRAIN 96'-0" MAX WIDTH 36'-4" MAX HEIGHT18" STAKE 24" OC GEOTEXTILE WITH NO MOW FESCUE SOIL GEOTEXTILE PARKING ROOF DECK SEE STRUCTURAL WIDTH VARIES 36'-0" MINRAINGARDEN PLANTINGS PLANTING SOIL CONCRETE PAVING WITH THICKENED CONCRETE EDGE DRAINAGE AGGREGATE DRAINTILE SUBGRADE GEOTEXTILE AGGREGATE12'-0"56 PLACE Parking Requirements PLACE: North Site Site Specifics SLP Parking Required Before Discounts Discount SLP Parking Required After Discounts Reductions 218 Dwelling Units 84 – Studios 1 per bed 84 1 per unit 84 0 74 – 1 bedrooms 1 per bed 74 74-35=39 units for car free living @ 1 per unit 39 -35 35 – 2 bedrooms 1 per bed 70 35-25=10 units for car free living @ 2 per unit 20 -50 23 – 3 bedrooms 1 per bed 69 2 spaces per unit 46 -23 2 – 4 bedrooms 1 per bed 8 2 spaces per unit 4 -4 Total 305 Total 193 -144 2,570 bikeshop 1 per 250 10.28 50% discount for rail/trail adjacency and shared parking 5.14 -5.14 2,529 makers space 1 per 250 10.12 100 % discount for shared parking 0 -10.12 7,500 digester Per ZA 2 none 2 0 2472 greenhouse NA 0 none 0 0 5 car share spaces 5 0 Total Required North 327.4 Total Required North with Discounts 205 -159 Proposed Parking 216 Proposed Parking 216 Percent of Requirement 66% Percent of Requirement 105% PLACE: South Site Site Specifics SLP Parking Required Before Discounts Discount SLP Parking Required After Discounts Reductions 50 Dwelling Units 32 – Studios 1 per bed 32 32-22=10 units for car free living @ 1 per unit 10 -22 4 – 1 bedrooms 1 per bed 4 4-2=2 units for car free living @ 1 per unit 2 -2 12 – 2 bedrooms 1 per bed 24 12-6=6 units for car free living @ 2 per unit 12 -12 2 – 3 bedrooms 1 per bed 6 2 spaces per unit 2 -4 0 – 4 bedrooms 1 per bed 0 2 spaces per unit 0 0 Total 66 Total 30 -36 110 room hotel 1.5 per room 165 1 per room 110 -55 2,920 café 1 per 60 48.66 25% discount for rail/trail/shared parking 36.56 -12.10 1,223 coffee 1 per 200 6.1 50% discount for rail/trail/shared parking 3.05 -3.05 1,000 live/work II 1 per 250 4 25% discount for rail/trail/shared parking 3 -1 Total Required South 224 Total Required South 183 -107.15 Proposed Parking 173 Proposed Parking 173 Percent of Requirement 77% Percent of Requirement 94% Total Required 552 Total Required 388 Total Proposed 389 Total Proposed 389 Percent of Requirement 70% Percent of Requirement 100% 57 Planning commission: Regular meeting Meeting date: November 6, 2019 Agenda item: 3b 3b Benilde-St. Margaret’s – Special Permit Major Amendment Location: 2501 State Highway 100 Case Number: 19-31-CUP Applicant: Paul G. May on behalf of Benilde-St. Margaret’s Owner: Benilde-St. Margaret’s Review Deadline: 60 days: December 3, 2019 120 days: February 1, 2020 Recommended motions: Motion to recommend approval of a major amendment to the special permit to allow a building expansion and accessory building at Benilde- St. Margaret’s school with conditions recommended by staff. Summary of request: Benilde-St. Margaret’s (BSM) requests an amendment to its existing special permit to convert an interior courtyard to classrooms and to construct an accessory building for the athletic complex. Site information: Site area: 31.97 acres Current use: Middle and high school Surrounding land uses: North: Single-family residences East: Single-family residences South: Synagogue and multi-family residence West: Highway 100 Current 2040 land use guidance Current zoning CIV - civic R-1 single-family residence 59 Regular meeting meeting of November 6, 2019 (Item No. 3b) Title: Benilde-St. Margaret’s – Special Permit Major Amendment Proposal: The proposal includes two components. 1. Convert a courtyard into classroom space. The courtyard is approximately 3,600 square feet in area. It is located within the existing building footprint of the school, so the addition does not expand the existing outer perimeter of the school building. The subject courtyard is pictured below. 2. Construct a 3,000 square foot (50 x 60 foot) athletics and maintenance building on the site of an existing smaller 660 square foot (22 x 30 foot) maintenance building. Background: BSM has been part of the St. Louis Park community since 1956. The site was originally owned by the Christian Brothers, who started Benilde as an all-boys school. In 1974 Benilde merged with the Minneapolis all-girls school St. Margaret’s forming the basis for the current school. BSM has changed over time, as has the land surrounding the school. Single family housing developed to the north and south of the school, with some multi-family housing developed adjacent to the school’s southeast border. Today BSM has approximately 1,140 students and does not plan to increase enrollment. The proposed improvements are meant to improve the quality of the facility including the maintenance and athletic components. Present considerations: Educational facilities are a conditional use in the R-1 Single-Family Residence district. However, BSM operates under a special permit that was first approved in 1985 and has been amended several times since. BSM was last before the city in 2017 for a similar remodel that entailed enclosing an interior courtyard. School Remodel: The proposal is to enclose the interior courtyard and remodel the areas immediately adjacent to it into the Center of Innovative Learning (CIL), which is an informal area where students can collaborate. Two classrooms will be relocated as part of the remodel. 60 Regular meeting meeting of November 6, 2019 (Item No. 3b) Title: Benilde-St. Margaret’s – Special Permit Major Amendment A portion of the roof to be constructed over the infilled courtyard will extend approximately 10 feet above the existing roof. The purpose of the raised roof is to provide natural light into the space. This design is consistent with other windows that extend above the roof for the purpose of providing natural light throughout the building. The height of the proposed roof will be 23 feet above grade. This is lower than the auditorium which is 31 feet above grade and the top of the sloped chapel roof, which is 43 feet above grade. The proposed roof is shown below in blue. Maintenance Building: The application includes a proposal to replace the existing maintenance shed. The existing maintenance building is 22 x 30 feet, and the proposed maintenance building is 50 x 60 feet. The garage will have a gable roof, and the height will not exceed 20 feet to the peak. BSM proposes to construct the new maintenance building within the next five years. Therefore, the conditions of approval include an extended deadline to begin construction of the maintenance building until December 31, 2025. Typically, improvements need to occur within two years of the original approval. Zoning analysis: Lighting: Lights within the CIL space will be down cast, so the light emanating from the new windows should be similar in appearance to other windows throughout the building. Parking: A parking study was completed as part of the 2008/9 special permit amendment to improve the athletic fields. At the time BSM had a total of 544 spaces, 386 spaces on -site and 158 spaces under contract with Beth-El Synagogue, which is located across Barry Street. As a result of the special permit improvements, BSM added 46 spaces on-site, which increased the total available parking spaces to 590 (432 on-site and 158 at Beth-El). The study also showed that the total parking required by the city zoning ordinance was 363 spaces. The proposed remodel is for the middle school and does not result in an increased in required parking spaces. Screening-Maintenance Building: The existing maintenance building is well screened from the residential properties to the north. The replacement building will maintain the existing screening. Pictures of the area around the shed, including the screening , are attached. View from Highway 100 61 Regular meeting meeting of November 6, 2019 (Item No. 3b) Title: Benilde-St. Margaret’s – Special Permit Major Amendment Recommendations: Staff recommends approval of the major amendment of the Benilde-St. Margaret’s special permit to convert the interior courtyard into student space, and to allow the replacement of the maintenance building, subject to the following site-specific conditions: 1. The courtyard remodel shall begin within two years of the approval of the amendment to the special permit and shall be constructed as illustrated in Exhibit L-CIL Remodel. 2. Construction of the maintenance building shall begin by December 31, 2025. It shall be located in accordance with Exhibit M-Maintenance Building Site Plan. 3. The maintenance building is to have a gable roof, and it shall not exceed 20 feet in height measured from the top of the concrete slab to the roof peak. 4. Additional screening may be required with the building permit for the maintenance building as determined by the zoning administrator. 5. In addition to any other remedies, the developer or owner shall pay an administrative fee of $750 per violation of any condition of this approval. 6. This permit shall be revoked and cancelled if the building or structure for which the conditional use permit is granted is removed. Supporting documents: Aerial photo Exhibit L-CIL remodel Exhibit M – maintenance building site plan Supporting documents for CIL remodel Supporting documents for maintenance building Prepared by: Gary Morrison, Assistant Zoning Administrator Reviewed by: Sean Walther, Planning & Zoning Supervisor 62 Regular meeting meeting of November 6, 2019 (Item No. 3b) Title: Benilde-St. Margaret’s – Special Permit Major Amendment AERIAL PHOTO 63 64 G102 4D C Project Number: Date: Drawn By: Checked By: 2017 Miller Dunwiddie Architecture, Inc. DRAWING TITLE DRAWING NUMBER PROJECT REVISED I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED ARCHITECT UNDER THE LAWS OF THE STATE OF MINNESOTA. Signature Name Date License # xxx xxx &83$SSOLFDWLRQ6HW 1RW)RU&RQVWUXFWLRQ G100 CODE PLAN OVERALL BSM1901 Author Checker BENILDE-ST. MARGARET'S SCHOOL 2501 MN 100 ST. LOUIS PARK, MN 55416 CENTER FOR INNOVATIVE LEARNING BSM1901 9.16.2019 NTSG100 1 OVERALL CODE PLAN Mark Date Description 65 2D A300 A630 209 SFHuddle #1 1 808 SFRoom 2 798 SFRoom 3 870 SFRoom 122 812 SFRoom 121 149 SFHuddle #2 7 149 SFHuddle #3 8 789 SFHelp Desk 123 1190 SFScience 135 2563 SFInnovation Center 11 4D A300 4C A300 4B A300 A630 2B A630 4D 4B FIXEDFIXED A B C D E F F.1 G H I 10 1 2 3 4 5 5.2 6 6.3 7 8 9 11B 1854 SFHall 14 FIXED FIXEDFIXEDFIXED FIXED FIXED15'-1 5/8"4"9'-2 1/2"12'-10 1/2"3'-5 1/2"11'-1 1/2"2'-3 1/2"10'-8"9'-4"5'-7"12'-0"13'-0 7/8"18'-10 1/2"19'-3 5/8"4'-3"24'-9 1/4"26'-9 1/2"17'-11"24'-2"11'-1 3/4" 2C A300 D.2 PK-30 SYSTEM PK-30 SYSTEM 2-HOUR 2B 2F 90 MINUTE 90 MINUTE 90 MINUTE 90 MINUTE DOORS AND FRAMES IN EXST OPENINGS A200 4B A201 4B A6304C LINE OF SOFFIT ABOVE 14A 14B 6'-6 7/8" C Project Number: Date: Drawn By: Checked By: 2017 Miller Dunwiddie Architecture, Inc. DRAWING TITLE DRAWING NUMBER PROJECT REVISED I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED ARCHITECT UNDER THE LAWS OF THE STATE OF MINNESOTA. Signature Name Date License # xxx xxx &83$SSOLFDWLRQ6HW 1RW)RU&RQVWUXFWLRQ A100 FIRST FLOOR PLAN BSM1901 JJS BENILDE-ST. MARGARET'S SCHOOL 2501 MN 100 ST. LOUIS PARK, MN 55416 CENTER FOR INNOVATIVE LEARNING BSM1901 9.16.2019 1/8" = 1'-0"A100 4D FIRST FLOOR PLAN Mark Date Description N TRUE NORTH 66 FIRST FLOOR 100'-0" T.O. JUNIOR HIGH ROOF 111'-8" T.O. WEST CLASSROOM WING ROOF 116'-0" ABCDEFF.1GHI D.2 2 HOUR GLAZING AND FRAME T.O. CIL CLERESTORY ROOF 123'-5 3/4" T.O. NEW CLASSROOM ROOF 113'-1" FIRST FLOOR 100'-0" T.O. JUNIOR HIGH ROOF 111'-8" T.O. WEST CLASSROOM WING ROOF 116'-0" 10 123455.266.3789 T.O. CIL CLERESTORY ROOF 123'-5 3/4" T.O. SLOPED CHAPEL ROOF 143'-0" T.O. GREAT HALL & THEATER ROOF 131'-8" T.O. NEW CLASSROOM ROOF 113'-1" C Project Number: Date: Drawn By: Checked By: 2017 Miller Dunwiddie Architecture, Inc. DRAWING TITLE DRAWING NUMBER PROJECT REVISED I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED ARCHITECT UNDER THE LAWS OF THE STATE OF MINNESOTA. Signature Name Date License # xxx xxx &83$SSOLFDWLRQ6HW 1RW)RU&RQVWUXFWLRQ A200 EXTERIOR ELEVATIONS BSM1901 Author Checker BENILDE-ST. MARGARET'S SCHOOL 2501 MN 100 ST. LOUIS PARK, MN 55416 CENTER FOR INNOVATIVE LEARNING BSM1901 9.16.2019 1/8" = 1'-0"A200 4D EAST EXTERIOR ELEVATION 1/8" = 1'-0"A200 4B NORTH EXTERIOR ELEVATION Mark Date Description MATERIAL KEYNOTES MATERIAL SLP ZONING CLASS PERCENTAGE OF FACADE (AT NEW WORK ONLY) GLASS AND ALUMINUM STOREFRONT AT CLERESTORY: STOREFRONT SYSTEM: TUBELITE; CHAMPAGNE COLOR; GLAZING: PPG SOLARBAN 60 ON SOLARBRONZE LOW-E #2 CLASS I PREFINISHED METAL FLASHING TO MATCH STOREFRONT (AT ROOF EDGE ABOVE STOREFRONT, CORNERS OF CLERESTORY; FLASHING BELOW CLERESTORY) CLASS 2 GLASS SKYLIGHTS: OLDCASTLE (WALLS BELOW SKYLIGHTS CLAD WITH PREFINISHED METAL)CLASS 1 PERCENTAGE NOT CALCULATED BECAUSE: - EAST ELEVATION IS NOT VISIBLE FROM OFF SITE; - NORTH ELEVATION IS LIKELY NOT VISIBLE FROM OFF SITE; - NEW CONSTRUCTION REPRESENTS A VERY SMALL PERCENTAGE OF OVERALL ELEVATION 67 FIRST FLOOR 100'-0" T.O. JUNIOR HIGH ROOF 111'-8" T.O. WEST CLASSROOM WING ROOF 116'-0" A B C D E F F.1 G H ID.2 T.O. CIL CLERESTORY ROOF 123'-5 3/4" T.O. SLOPED CHAPEL ROOF 143'-0" T.O. GREAT HALL & THEATER ROOF 131'-8" T.O. NEW CLASSROOM ROOF 113'-1" FIRST FLOOR 100'-0" T.O. JUNIOR HIGH ROOF 111'-8" T.O. WEST CLASSROOM WING ROOF 116'-0" 1 2 3 4 5 5.2 6 6.3 7 8 9 T.O. CIL CLERESTORY ROOF 123'-5 3/4" T.O. NEW CLASSROOM ROOF 113'-1" C Project Number: Date: Drawn By: Checked By: 2017 Miller Dunwiddie Architecture, Inc. DRAWING TITLE DRAWING NUMBER PROJECT REVISED I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED ARCHITECT UNDER THE LAWS OF THE STATE OF MINNESOTA. Signature Name Date License # xxx xxx &83$SSOLFDWLRQ6HW 1RW)RU&RQVWUXFWLRQ A201 EXTERIOR ELEVATIONS BSM1901 Author Checker BENILDE-ST. MARGARET'S SCHOOL 2501 MN 100 ST. LOUIS PARK, MN 55416 CENTER FOR INNOVATIVE LEARNING BSM1901 9.16.2019 1/8" = 1'-0"A201 4D WEST EXTERIOR ELEVATION 1/8" = 1'-0"A201 4B SOUTH EXTERIOR ELEVATION Mark Date Description MATERIAL KEYNOTES MATERIAL SLP ZONING CLASS PERCENTAGE OF FACADE GLASS AND ALUMINUM STOREFRONT AT CLERESTORY: STOREFRONT SYSTEM: TUBELITE; CHAMPAGNE COLOR; GLAZING: PPG SOLARBAN 60 ON SOLARBRONZE LOW-E #2 CLASS I PREFINISHED METAL FLASHING TO MATCH STOREFRONT (AT ROOF EDGE ABOVE STOREFRONT, CORNERS OF CLERESTORY; FLASHING BELOW CLERESTORY) CLASS 2 GLASS SKYLIGHTS: OLDCASTLE (WALLS BELOW SKYLIGHTS CLAD WITH PREFINISHED METAL)CLASS 1 PERCENTAGE NOT CALCULATED BECAUSE: - SOUTH ELEVATION IS NOT VISIBLE FROM OFF SITE; - EAST ELEVATION IS VISIBLE FROM OFF SITE (FROM HIGHWAY 100), HOWEVER, NEW CONSTRUCTION REPRESENTS A VERY SMALL PERCENTAGE OF OVERALL ELEVATION 68 PHOTO 1 - LOOKING WEST TOWARDS EXISTING GARAGE 69 PHOTO 2 - LOOKING NORTHEAST TOWARDS PROPERTY LINE 70 PHOTO 3 - LOOKING NORTH TOWARDS EXISTING GARAGE, PROPERTY LINE BEYOND 71 PHOTO 4 - LOOKING NORTH TOWARDS PROPERTY LINE 72 PHOTO 5 - LOOKING NORTHEAST TOWARDS PROPERTY LINE 73 PROPERTY LINE (BLUE)SEE ENLARGED SITEPLANS FOR THIS AREAOVERALL SITE PLANNTSNORTH74 PROPERTY LINE (BLUE)EXISTING WELLREMOVE EXISTINGSTORAGE BUILDING12345EXISTING ENLARGED SITE PLAN 1/32" = 1'-0"#= PHOTO KEY NUMBERNORTH75 PROPERTY LINE (BLUE)2' SETBACK FROM PROPERTY LINE (YELLOW)(zoning code for accessory buildings; Article IV Div 4. Sec.36-162 Subsection d.1.b.1)60'-0"50'-0" 50'-0"18'-0"NEW 60' X 50'ATHLETICS &MAINTENANCESTORAGE BUILDING (3000 SF)MAINTAIN TRUCK ACCESS TOEXISTING WELL & GATE VALVE50' SETBACK FROM PROPERTY LINE (zoning code for educational buildings in R-1;Article IV Div 4. Sec.36.163 Subsection d.6.a)EXISTING ENLARGED SITE PLAN 1/32" = 1'-0"NORTH76 St. Louis Park Community Development Department • 5005 Minnetonka Blvd., St. Louis Park, MN 55416 www.stlouispark.org • Phone: 952.924.2575 • Fax: 952.928.2662 • TTY: 952.924.2518 Current zoning district ☐ R-1 ☐ R-2 ☐ R-3 ☐ R-4 ☐ M-X ☐ POS ☐ C-1 ☐ C-2 ☐ O ☐ BP ☐ I-P ☐ I-G Current use: ___________________________ Proposed use: _________________________ Provide a concise statement summarizing this project: Provide a more detailed description of your request for a planned unit development, being sure to address the following items: • The effect of the proposed use on the health, safety and welfare of occupants of surrounding lands. • The effect on existing and anticipated traffic conditions, including parking facilities on adjacent streets. • The effect on property values in the surrounding area. • The consistency of the proposed use with the principals, goals and objectives of the comprehensive plan. K-12 Educational K-12 Educational (unchanged) An existing interior courtyard space of the school is being enclosed to provide a Center for Innovative Learning space for students. A new Athletics and Maintenance Garage is being constructed in the NE portion of the site to replace an an existing, smaller one. Center of Innovative Learning (CIL): The existing courtyard being converted into the CIL is currently gravel with a catch basin. The CIL will provide informal space for students to collaborate. The project will also relocate two existing classrooms displaced by the CIL into the infilled courtyard. The existing computer Help Desk room will be converted into a Junior High classroom. In total, six classrooms will be impacted by the project. The proposed use will not impact the health, safety, or welfare of neighboring properties. No increased traffic will occur, as the space is for existing students already at the school. No increase to the number of parking spaces provided onsite is required or planned. The improvements will not affect neighboring property values. The courtyard is internal to the school and the exposed clerestory will face west towards Highway 100. The project is not visible to any adjacent residential neighborhoods to the north, east, or south. The improvements are consistent with the City's Comprehensive Plan, as it improves the quality of the SLP school system. Athletics and Maintenance Storage Building: The proposed storage building will be built in the same location as a smaller, existing storage garage. The proposed storage building will not impact the health, safety or welfare of the occupants of surrounding lands, nor will it affect their property values, or impact on traffic or parking. It will not be visible from off-site, as there is vegetation between the site and neighboring properties. The improvements are consistent with the City's Comprehensive Plan, as it improves the quality of the SLP school system by allowing more educational program space within the school. 77 PROPERTY LINE (BLUE)2' SETBACK FROM PROPERTY LINE (YELLOW)(zoning code for accessory buildings; Article IV Div 4. Sec.36-162 Subsection d.1.b.1)60'-0"50'-0" 50'-0"18'-0"NEW 60' X 50'ATHLETICS &MAINTENANCESTORAGE BUILDING (3000 SF)MAINTAIN TRUCK ACCESS TOEXISTING WELL & GATE VALVE50' SETBACK FROM PROPERTY LINE (zoning code for educational buildings in R-1;Article IV Div 4. Sec.36.163 Subsection d.6.a)EXISTING ENLARGED SITE PLAN 1/32" = 1'-0"NORTH78