HomeMy WebLinkAbout20-022 - ADMIN Resolution - City Council - 2020/02/03Resolution No. 20-022
Resolution accepting the project report,
establishing improvement project no. 4020-1000,
approving plans and specifications and authorizing
advertisement for bids for improvement
Project No. 4020-1000
Whereas, the City Council of the City of St. Louis Park has received a report from the
Project Manager related to the 2020 Pavement Management Program.
Now therefore be it resolved by the City Council of the City of St. Louis Park, Minnesota,
that:
1. The Project Report regarding Project No. 4020-1000 is hereby accepted.
2. Such improvements as proposed are necessary, cost effective, and feasible as detailed in
the Project Report.
3. The proposed project, designated as Project No. 4020-1000, is hereby established and
ordered.
4. The following new sidewalk segments are hereby established and ordered for
construction
Number Description
Sidewalk
Classification
Recommended
at this time
1
28th St – Lynn Ave Trail to Kenesseth Israel
Congregation (north side)
Community
Yes
2
Cedar Lake Avenue – Inglewood Ave to Huntington
Ave (north side)
Neighborhood
Yes
6 Huntington Avenue – 26th St to 25th St (east side) Neighborhood Yes
8 Kipling Avenue – 26th St to 25th Street (east side) Neighborhood Yes
5. The following sidewalk segments are not recommended for construction with this project:
Number Description
Sidewalk
Classification
Recommended
at this time
3
Joppa Avenue – Cedar St to Cedar Lake Ave (west
side)
Neighborhood
No
4 Kipling Avenue – dead end to 27th St (east side) Neighborhood No
5 Kipling Avenue – dead end to 27th St (west side) Neighborhood No
7
Basswood Road – 25th St to France Ave (south
side)
Neighborhood
No
6. The following street widths are hereby established and ordered for construction
The following are the recommended street width changes:
DocuSign Envelope ID: AD167B05-EF8A-4F29-9068-0F42E446E0FD
Resolution No. 20-022 2
Street segment Existing
(ft)
Proposed
(ft)
Monterey Avenue (26th Street to 25th Street) 30 28
Lynn Avenue (dead end to 25th Street) 30 28
Inglewood Avenue (26th Street to 25th Street) 30 28
Huntington Avenue (26th Street to 25th Street) 30 28
Basswood Road (25th Street to France Avenue) 30 28
Glenhurst Avenue (Cedar Lake Avenue to dead end) 30 20
The following streets are recommended to stay at their current width:
Street segment Existing
(ft)
Proposed
(ft)
Joppa Avenue (Minnetonka Boulevard to 28th Street) 27 - 33.5 27 – 33.5
Sunset Boulevard (Joppa Avenue to France Avenue) 36 36
Huntington Avenue (Minnetonka Boulevard to Sunset Boulevard) 30 30
28th Street (Monterey Parkway to Inglewood Avenue) 35 35
28th Street (Glenhurst Avenue to France Avenue) 30 30
Glenhurst Avenue (Sunset Boulevard to Cedar Lake Avenue) 30 30
Cedar Street (Joppa Avenue to Inglewood Avenue) 20 20
Cedar Lake Avenue (Joppa Avenue to France Avenue) 30 30
Joppa Avenue (Cedar Street to Cedar Lake Avenue) 26 26
Joppa Avenue (Cedar Lake Avenue to 26th Street) 30 30
Kipling Avenue (dead end to 26th Street) 30 30
Monterey Avenue (dead end to 27th Street) 26 26
Monterey Avenue (27th Street to 26th Street) 24 24
27th Street (Monterey Avenue to Joppa Avenue) 30 30
25th Street (dead end to France Avenue) 30 30
7. Staff will enhance the pedestrian crossing on the west side of the Basswood Road and
France Avenue intersection. The enhancements that will be evaluated are larger
pedestrian landings, tighter curb radius and shorting the pedestrian crossing distance.
8. The plans and specifications for the making of these improvements, as prepared under
the direction of the Engineering Director, or designee, are approved. The Engineering
Director is allowed to make adjustments to these plans and specifications, such as
narrowing the width of boulevards or sidewalks, in cases where special circumstances
exist in the field, such as the location of trees, provided that these adjustments will
make a material difference in addressing any special circumstances that may exist.
9. The City Clerk shall prepare and cause to be inserted at least two weeks in the official
City newspaper and in relevant industry publications an advertisement for bids for the
making of said improvements under said-approved plans and specifications. The
advertisement shall appear not less than 10 days prior to the date and time bids will be
received electronically by the Project Manager and accompanied by a bid bond payable
to the City for five (5) percent of the amount of the bid. The electronic bids will only be
DocuSign Envelope ID: AD167B05-EF8A-4F29-9068-0F42E446E0FD
Resolution No. 20-022 3
available to view after the bids are closed and the City receives the passcode from the
bidding host site.
10. The Project Manager, or designee, shall report the receipt of bids to the City Cou ncil
shortly after the opening date. The report shall include a tabulation of the bid results
and a recommendation to the City Council.
Reviewed for Administration: Adopted by the City Council Feb. 3, 2020
Thomas K. Harmening, city manager
Jake Spano, mayor
Attest:
Melissa Kennedy, city clerk