ECONOMIC DEVELOPMENT AUTHORITY
ST. LOUIS PARK, MINNE SOTA
Monday, February 7, 1994
7:00 p.m.
1. Call to order
2. Roll call
3. Approval of minutes of January 18, 1994 meeting
4. Approval of agenda for February 7. 1994
5. Reports
a. Bid Tabulation - Site Improvements at Tower Place
Bids will be received on February 7th for the removal
of demolition debris and soils from approximately the
sourtherly half of the Tower Place site. Since bids
will not be opened until February 7th, results will be
provided at the meeting.
Action: Motion to adopt resolution
{Resolu tion will accompany the report to be
distributed on Monday night)
) 6.
7.
Unfinished business
New business
a. Change Order No. 2 - Tower Place Parking Ramp
A total of 20 items with 11 deductions, eight (8)
additions and one (1) no cost item has reduced this
project cost.
Motion to adopt resolution
8.
9 .
Action :
Other business
Communications and bills
a. December 1993 financial statement
Action: Motion to receive for filing
b. January 1994 financial statement
Action: Motion to receive for filing
c. Vendor claims
Action: Motion to approve and authorize paym ent
10. Adjournment
REQUEST- FOR EDA ACTION
DATE February 7, 1994 ____ ...;;..____;_ _
AGENDA SECTION: Reports
NO. 5
ORIGINATING DEPARTMENT:
ITEM:
NO. 5a
Bid Award - Site Improvements at
Tower Place
APPROVED: ,, N. G b Ap\\ ames . rule\_"
Director of Public Works
On January 18, 1994 the Economic Development Authority (EDA) authorized staff
to take bids for the removal of demolition debris and soils from approximately
the southerly half of the Tower Place site. In order to comply with the City
Charter and State Statutes regarding timing between the publishing of an
advertisement for bids and a bid opening, bids cannot be received before
February 7, 1994. The results of the bid opening will be provided to the EDA
at it's February 7, 1994 meeting.
cmr
PUBLIC WORKS
APO·OVAL ' le
'/
COUNCIL ACTION: MOTION BY 2ND BY TO ---------- ---------- -----
APPROVAL
OBTAINED
APPROVAL
OBTAINED
APPROVAL
OBTAINED
Executive Director
APPROVAL 7,07..
osTus //]
REQUEST- FOR EDA ACTION
./ DATE ---------- February 7, 1994
AGENDA SECTION: New Business
NO. 7
ORIGINATING DEPARTMENT:
Admi nistration
ITEM: Change Order No. 2 -
Tower Place Parking Ramp
NO. 7a
APPROVED: fk./
Robert J. Larson ["Ve?
Assistant to the City Manager
)
4
Background: The Tower Place parking ramp has been under
construction since October 1993. With this report, the
Construction Manager, Kraus-Anderson, is requesting formal
approval by the Economic Development Authority (EDA) of Change
Order No. 2 for the project which includes 20 items with a total
net reduction of $136,437 representing 11 deductions, eight (8)
additions and one (1) no cost item.
Discussion: Beginning on October 14, 1993 members of the project
team have been meeting to discuss means and methods whereby the
total project cost may be reduced. This process is commonly
referred to as value engineering and it involves changing the
construction method and/or the construction materials from the
original specifications. These changes do not compromise the
structural integrity of the parking ramp or its exterior
finishes.
Attached is Change Order No. 2 with the 20 items. Further
details on these items are described in the attached narrative
from Kraus-Anderson's Construction Manager.
Recommendation: It is recommended the Economic Development
Authority adopt the attached resolution approving Change Order
No. 2 in the amount of $136,437 to Contract EDA 8-93 with
Adolfson & Peterson for construction of the Tower Place parking
ramp.
RL/sjk
Attachments
Staff Note: A representative from the construction manager, Kraus-Anderson,
is scheduled to attend tonight's meeting to address any
questions about this project.
PUBLIC WORKS
APPROVAL
[AINED
FINANCE
APPROVAL
OBTAINED
COMMUNITY UVtELUH.
APPROVAL
OBTAINED
APPROVAL
OBTAINED
MANAGER'S~
APPROVAL
OBTAINED
COUNCIL ACTION: MOTION BY 2ND BY TO ----------- ----------- ------
RESOLUT ION
RESOLUT ION PERTAINING TO CHAN GE ORD ER NO. 2
FOR EDA PROJECT NO. 8-93
WH EREAS, the Economic Development Authority entered into
Contract 8-93 with Adolfson & Peterson, Inc. for the construction
of the Tower Place parking ramp; and
WH EREAS, the Economic Development Authority has determined
that certain modifications be made to the contract to facilitate
the construction of the project, said modifications being as
follows:
11 deductions, eight additions and one no cost item to
the project as described in attached Change Order No. 2
narrative
)
WH EREAS, the contractor, Adolfson & Peterson, Inc. has
agreed to the prices for the modifications noted above,
NOW, THEREFORE, BE IT RESOLVED by the Economic Development
Authority of the City of St. Louis Park, MN that the above
modifications to Contract 8-93 are approved; and
BE IT FUR THER RESOLVE D by the Economic Development Authority
of the City of St. Louis Park, MN that the reduction of $136,437
is accepted for the project.
Adopted by the Economic Development Authority February 7, 1994
President
Executive Director
C H A N G E O R D E R
(SEE NARRATIVE ATT ACHED)
Distribution to:
ER X CO NTRA CT OR X
HGA X KA FIELD X
KRA US -AND ERSON X JOH N DEC OSTE R X
PROJ EC T: Park Nicollet Tower Place Park ing Ramp
\ (nam e, address) 5000 W est 39th Street
St. Louis Park , MN 55416
TO (C ontractor): Adolfson & Peterson, Inc.
6701 W est 23rd Street
M inneapolis, M N 55426
CHANGE ORDER NUMBER: TW O (2)
INITIATIO N DATE: 1/31/94
ARCHITECTS PROJ ECT NO: 868.03 0.06
CON STR UCTIO N MAN AGER 'S PROJ ECT NO : 4185
You are direct ed to m ake the fo llowing changes in this Contract :
1. Foundation and elev. chan ges per RFP #1.
2. Petco panel substitution.
3. Change radiation pa nels.
4. Change asphalt in lower level from 4" to 3".
5. Delete shunt trip.
6. RFP's #2 and #6, ASI #2 - Sanitary and Storm Sewer.
7. Rem ove and reinstall cover.
8. M ethane venting system ; precast bearing at stair elevator per RFP #3R.
9. Miscellaneous revisions to pile cap and stairs due to revised grading per RFP #4.
10 . Revise grade beam per details 25/3-2, 26/302 due to pipe invert elev. conflict.
11. Revise floor slope, Skyw ay B elevator and door swing per RFP #5. No Co st
12 . Delete traction elevator. DEDUCT: (82,855.00)
13 . Substitute fan co il for base board radiation. DEDUCT: (8,179.00)
14 . Elevator equipm ent room - substitute fan coil for room mounted exhaust fan. DEDUCT: (2,109.00)
15 . Substitute stand alone system fo r Barber Colem an 8000. DEDUCT: (10,526.00)
16 . Add sm oke exhaust system to skyways. ADD: 6,243.00
17 . Provide Zurn Z2-610-DG FD for Neenah. ADD: 1,848.00
18 . Connect four AD-2 drains to the storm sewer system in lieu of flam m able system . DEDUCT: (8,900.00)
19 . Revise HV AC and plumbing plans to show chan ges. ADD: 2,346.00
20. Addition erro r on Chan e Order #1. DEDUCT: 40.00
gllNNNdof]
TOTAL DEDUCT CHANGE ORDER NUMBER TWO (2): DEDUCT: ($136,437.00)
CO NTRA CT FO R: G eneral Constru ction
CO NTRACT DATE: Oc tobe r 5, 1993
DEDUCT : ($29,703.00)
DEDUCT: (13,819.00)
DEDUCT: (9,158.00)
DEDUCT: (7,130.00)
DEDUCT: (338.00)
ADD: 5,182.00
ADD: 4,275.00
ADD: 14,084.00
ADD: 1,510.00
ADD: 832.00
Not valid until signed by the Ow ner, the Architect (HGA) and the Construction Manager (Kraus-Anderson Construction Company).
Sig nature of the Contract or indicates agre em ent here w ith, incl uding any adjust m ent in the. Co ntra ct. Sum or the. Co ntra ct. Tim e
Th e original Contract Sum was
Net change by previously authorized Chan ge Orders
The Contract Sum prior to this Change Order was
The Co ntract Sum will be {increased) (decreased) (unc hang ed) by this Change Order
The new Contract Sum including this Change O rder will be
The Contract Ti m e will be {inere as ed) {decreas ed) (unchanged) by
The Date of Substantial Com pletion as of the date of this Change Order therefore is June 3, 1994.
Recom m ended By Construction M anager: Approved By Re-Developer:
KRA US-ANDERSO N CO NSTR UCTIO N COMPANY PAR K NICOLLET MEDICAL CENTE R HOLD INGS
525 South Eighth Street, M inneapolis, M N 55404 5000 W est 39th Street, St. Louis Park, MN 55416
$
$
$
$
4,263,000.00
(129,044.00)
4,133,996.00
(136,437.00)
3,997,559.00
(a ) Days
BY Donald D. Hackert, Vice President DATE BY Joseph Mitlyng, Vice President DATE
Agreed To By Contract or:
ADO LF SO N & PET ERSO N, INC.
6701 W est 23rd Street, M inneapolis, M N 55426
BY John Palm quist, Vice President
Approved By Architect:
\
H AM M EL, G REEN & ABRAHAM SON, INC.
1201 Harm on Place, Minneapolis, MN 55403
Authorized By Owner:
ECON OM IC DEVELOPMENT AUTH ORITY
CITY OF ST. LOU IS PARK
5005 Minnetonka Boulevard. St. Louis Park, MN 55416
DATE
sy Lyle W. Hanks, President DATE
BY Charles W . M eyer, Executive Director DATE
BY Gary Nyberg, Vice President DATE
NARRA TIVE CHAN GE ORD ER #2
PARK NI COLLE T MED ICAL CE NT ER
TOWER PLA CE PARKIN G RAMP
January 31, 1994
)
l. Foundation & Elevation Changes <$29,703.00>
Hammel, Green & Abrahamson issued revised drawings based upon updated pile
capacities resulting in the reduced quantity of concrete pile caps and the change in sizes
of various concrete pile caps. This resulted in a deduct of six forms for footings and pile
caps and a reduction of 182 cy of concrete.
2. Pefco Panel Substitution <$13,819.00>
This change represents the deletion of an aluminum laminated panel as specified for a
galvanized panel which has been approved by the Architect. Along with the addition of
the galvanized panel, we have added drywall sheeting to complete this system.
3. Change Radiation Panels <$9,158.00>
This change represents the deduction of a sheetrnetal fabricated custom radiation panel
for a standard type radiation panel. The mechanical contractor will now install 294 If of
Rittling or equal fintube radiation enclosure. The concrete contractor will install the
backers required for the anchoring of these panels.
4. Change Asphalt in Lower Level Parking From 4" Thick to 3" Thick <$7,130.00>
This change reflects revising the asphalt sections in the lower level parking area from a
4" class 5 and a 4" paving to a 6" class 5 and a 3" paving that can be installed in one lift.
5. Delete Shunt Trip <$338.00>
This change represents the deletion of a 60 amp 3-pole 480V shunt trip circuit breaker
for the elevators, along with the EMT conduit, copper tubing and fire alarm supplies by
the electrical contractor, Meyer Electric.
6. Excavator's Modifications For RFP #2, RFP #6 and ASI #1 $5,182.00
All items issued by the Architect refer to the storm drainage and sanitary sewer system
modifications. These modifications are shown on the revised drawings C1.1, C3.1, C3.5
and C4.1A. Drawing Cl.l adds sanitary sewer line, it removes one sanitary manhole, it
removes storm sewer pipe and an existing manhole. All these items in the 39th Street
right-of-way. Drawing C3.l adds a sanitary manhole Al near SE comer of parking
ramp, adds approximately 330 lf of 12" Dutile iron pipe for the sanitary sewer on the
south side of the parking ramp between the existing sanitary manhole west of ramp to
new sanitary manhole Al. It revises the location of the storm sewer manhole #l, it
revises the 10" Dutile iron pipe between catch basin #2 and manhole #l, it revises the 12"
reinforced concrete storm sewer pipe between manhole #l and catch basin #3, and it
adds a wet tap for the 12" Dutile iron pipe stub-out at the west end. Architect's
Supplementary Instructions #2 adds approximately one foot of height to catch basin #3.
PAGE 1 OF4
P ark N ico ll et M ed ical C en ter - T ow er Ra m p
N arra ti ve C h an g e O rd er #2
Jan u ary 31, 19 9 4
7 . Remove & Reinstall Cover $4,275.00
This item submitted by the excavator is for removing and reinstalling cover to build site
to plan grade. This allows for a more level supportive type surface for the piling
operation. The excavator will strip and stockpile cover material from the site, he will
build north end with contaminated material from the south end cut as per grades on
sheets C4.1 and then cover the contaminated material that has been exposed from the
excavation operation with the material previously stripped and stockpiled.
8. Methane Venting System and Precast Bearing at Stair and
Elevator - REP #SR $14,084.00
This change, RFP #3R issued by Hammel, Green & Abrahamon, adds a new spec
section to the excavator's scope of work. This spec section, 02770 - membrane liner -
requires the furnishing and installing of a geomembrane liner 60 mil thick between
the asphalt on grade and the venting aggregate layer. Further, it includes the revised
foundation walls where the precast bears on the stair and elevator tower from elevation
195' to elevation 196'-8".
9. Miscellaneous Revisions to Pile Cap &: Stairs Due to Revised
Grading Plan-RFP #4 $1,510.00
This change includes the following: Stair PC has been revised per detail D/ A201P-R.
The handrail and guardrail for Stair PB has been revised per detail 8/3-6A. The
handrails for concrete Stair PB and PC have been revised per detail 3R/3-6A. The
foundation wall for the precast has been revised in elevation. The rail on top of the low
wall at elevation 201 has been deleted. Pile caps at grids B2, C2 and D2 have been
revised from type 2B to type 2A. Additional details have been added showing the 7
battered toe piles along grid 8.6 and 3 heel piles also at grid 8.6. The top of pile cap
elevation for columns C4, C5, C6 and C7 have been revised and there have been various
elevation or dimensional clarifications.
10. Revised Grade Beam Per Details 25/C-2, 26/302 Due to Pipe
Invert Elevation Conflict - RFI #1 $832.00
Due to a pipe concrete footing conflict, the Architect issued directions to modify the
footing which increased the forming, the concrete and the rebar requirements.
11. Revise Floor Slope Skyway B Elevation &: Door Swing -RFP #5 No Cost Change
RFP #5 issued shows miscellaneous changes and issued two drawings A202P and
A203P which effect the floor slope, the elevation for skyway B and a door swing, which
is reversed.
12. Delete Traction Elevator In Its Entirety <$82,855.00>
This change reflects the Owner's desire to delete the traction elevator in its entirety, less
a previous value engineering change order. The Owner, in lieu of the traction elevator,
will install a hydraulic elevator under a separate contract. The net savings· to the Project
will be approximately $30,000.00.
PAGE 2 OF 4
Park N icollet M edi cal C enter - T ow er R am p
N arr ative C hange O rder #2
Jan uary 31, 1994
)
13. Substitute Fan Coil For Baseboard Radiation <$8,179.00>
This change reflects a deletion in the hot water baseboard radiation in the ramp
walkway room 205P. Additional heat would be added to this area by installing two row
hot water coils in lieu of one row of fan coil units 3, 4 and 5. In addition, supply
registers would be installed in the exterior soffit over the windows in lieu of the existing
ceiling diffusers.
14. Elevator Equipment Room Substitute Fan Coil For Room
Mounted Exhaust Fan <$2,109.00>
This change reflects the deletion of fan coil unit #9 in elevator equipment room 104P.
This change is possible because of the heat gain from the elevator equipment, which is
considerably less than that which was anticipated during the design phase. The fan
coil unit would be replaced with the roof mounted exhaust fan and a wall mounted
outside air intake louver with motorized damper and intake filter. A 5KW electric unit
heater would be installed for wintertime heat. Offsetting costs by the electrical
contractor of $859.00 is included in the overall deduct, which covers the electrical hook-
ups.
15. Substitute Stand-Alone System For Automatic Barber-Coleman 8000 <$10,526.00>
This change includes the deletion of the Barber-Coleman System 8000 Automatic
Control System from the fan coil units and baseboard radiation. This control system
would be replaced by a Barber-Coleman, Honeywell or equal system of stand-alone
controls which would operate each unit independently.
16. Add Smoke Exhaust System to Skyways $6,243.00
This change includes the furnishing and installation of a smoke exhaust system to
skyways A and B. Each system would ventilate the skyway at a rate of four air changes
per hour and be comprised of an exhaust fan, gravity air intake, ceiling mounted smoke
detector, fan coil unit interlock and supply exhaust grilles with the necessary ductwork.
Electrically it would include the hook-up of a 1/2 HP exhaust fan in skyway A and
skyway B.
17. Provide Zurn Z-610-DG Floor Drain For Neenah Specified $1,848.00
This change includes the furnishing of the Zurn Model Z-610-DG floor drain with a 36"
rubberoid membrane in lieu of the Neenah drain specified. As they age, many of the
existing parking ramps have a tendency to allow moisture to sweep through the floors.
This usually occurs at the drains. This has resulted in some lime leakage through the
concrete which would damage paint on vehicles parked below. The drain with the 36"
rubberoid membrane will hopefully prevent this problem.
18. Connect Four AD-2 Drains to the Storm Sewer System in Lieu of
Flammable System <$8,900.00>
This change reflects the furnishing and connection of four AD-2 drains to the storm
sewer system in lieu of the flammable system as shown. This also includes the
omission of the flammable catch basin and related piping.
PAGE3 OF4
P ark N ico ll et M ed ical C en ter - T ow er Ra m p
N arr ative C h an g e O rd er #2
Jan u ary 31, 19 9 4
19 . Revise HVAC and Plumbing Plans to Show Changes $2,346.00
This change include the mechanical contractor's engineering and drafting time to
revise the HVAC and plumbing plans, along with the specifications to reflect the
changes noted above. This work will be done by Fonder-Kendle Associates. Also
included are the prime contractors' costs and markups.
20. Corrects an Addition Error in Change Order #1 <$40.00>
>
PAGE 4 OF 4
February 7, 1994
EDA
TO: Economic Development Authority
THROUGH: Charlie Meyer, Executive Director (A7r
FROM: Mac McBride, Finance Director X [l?
Don Rambow, Asst. Finance Director
SUBJECT: December 1993 EDA Monthly Statement
)
The Combining Statement of Revenue and Expenditures, the Individual Statement
of Revenue and Expenditures and the Schedule of Investments provides in
summary form the financial position of the EDA.
Revenue co 11 ections reflect the December tax increment sett 1 ement received
from Hennepin County, receipt of excess funds from the closed Oak Park Village
Debt Service Fund and interest received on investments which matured during
December.
Significant expenditures reflect construction associated with the Park
Nicollet parking ramp project, legal fees for October through December and
land write down costs associated with the Suburban Plumbing project.
St. Louis Park Economic Development Authority
Combining Statement of Revenue and Expenditures
Budget and Actual
1) For Period Ending December 31, 1993
J YTD Balance Percent
Collected/ Uncollec./ Collected/
Budget Expended Unexpend. Expended
Revenue -------- --------- --------- --------- -------
Tax increment $3,100,739 $3,100,739 100%
Rent 4,680 4,680 100
Interest 937,117 1,060,246 (123,129) 113
Transfers 876,757 1,380, 757 (504,000) 157
Refunds & Reimburse 248,333 248,873 (540) 100
--------- --------- ---------
Total Revenue 5,167,626 5,795,295 (627,669) 112
--------- --------- ---------
Expenditures
------------
Administrative
Salaries 82,060 86,295 (4,235) 105
Employee benefits 16,773 17,599 (826) 105
Supplies & other chgs. 4,500 4,729 (229) 105
Legal 3,487 9,025 (5,538) 259
Contractual 1,200 5,463 (4,263) 455
Planning 44,985 46,642 (1,657) 104
--------- --------- ---------
) Total Administrative 153,005 169,753 (16,748) 111
--------- --------- --------- Project Cost
Appraisal/survey 2,500 2,500
Legal 158,282 248,921 (90,639) 157
Environ. analysis 122,726 167,535 (44,809) 137
Public improvement 2,269,878 2,512,705 (242,827) 111
Relocation/demolition 101,533 103,586 (2,053) 102
Property acquisition 804,948 867,178 (62,230) 108
Environ. remediation
Referendum payment 311,262 (311 ,262)
Property Maintenance 28,257 22,453 5,804 79
Other services 4,065 16,492 (12,427) 406
Transfers
---------- --------- ----------
Total Project Costs 3,492,189 4,250,132 (757,943) 122
---------- --------- ----------
Debt Service
Bond interest 504,000 504,000 100
Transfer 504,000 (504,000)
Inter-govt., City 620,000 620,000 100
Bond agent fees
--------- --------- ---------
Total Debt Service 1,124,000 1,628,000 (504,000) 145
---------- --------- ----------
Total Expenditures 4,769,194 6,047,885 (1,278,691) 127
/Revenue over (under)
---------- --------- ----------
Expenditures 398,432 (252,590) 651,022 (63)
--------- --------- --------- ---
St. Louis Park Economic Development Authority
Individual Statement Of Revenue And Expenditures
For Period Ending December 31, 1993
<
Excelsior Oak Park Trunk Capital Debt
Revenue Blvd Vil 1 age Hwy 7 Projects Service Total
------- --------- -------- ------- -------- ------- -------
Tax increment $2,020,335 $397,104 $683,300 $ $ $3,100,739
Rent 4,680 4,680
Interest 671,087 74,156 60,248 220,541 34,214 1,060,246
Transfers 876,757 504,000 1,380,757
Refund/reimburse 248,873 248,873
--------- ------- ------- ------- ------- ---------
Total Revenue 2,940,295 1,352,697 743,548 220,541 538,214 5,795,295
--------- ------- ------- ------- ------- ---------
Expenditures
------------
Administrative
Salaries 32,658 18,293 35,344 86,295
Employee benefits 6,117 3,588 7,894 17,599
Supplies & other chgs. 2,265 1,108 1,356 4,729
Legal 5,914 1,556 1,555 9,025
Contractual 3,060 650 1,753 5,463
Planning 46,642 46,642
--------- ------- ------- ------- ------- ---------
Total Administrative 96,656 25,195 47,902 169,753
--------- ------- ------- ------- ------- ---------
Project Cost
Appraisal/survey
Legal 235,693 13,228 248,921
Environ. analysis 158,141 9,394 167,535
Public improvement 613,828 1,898,877 2,512,705
Relocation/demolition 98,641 4,945 103,586
Property tax
Acquisition 80,148 787,030 867,178
Referendum payment 260,731 50,531 311,262
Property maintenance 6,209 12,494 3,750 22,453
Other services 10,824 5,668 16,492
--------- ------- --------- ------- ------- ---------
Total Project Costs 1,464,215 63,025 2,722,892 4,250,132
--------- ------- --------- ------- ------- ---------
Debt Service
Bond interest 504,000 504,000
Transfer 504,000 504,000
Inter-govt., City 620,000 620,000
Bond agent fees
--------- ------- --------- ------- ------- ---------
Total Debt Service 1,124,000 504,000 1,628,000
--------- ------- --------- ------- ------- ---------
Total Expenditures 2,684,871 88,220 2,770,794 504,000 6,047,885
--------- ------- --------- ------- ------- ---------
J evenue over (under)
Expenditures 255,424 1,264,477 (2,027,246) 220,541 34,214 (252,590)
--------- ======= --------- ======= ======= --------- ---------
.I
<
I
ST. LOUIS PARK ECONOMIC DEVELOPMENT AUTHORITY
SCHEDULE OF INVESTMENTS
December 31, 1993
Date
Investments --------------------
Institution/Type Yield Purchase Maturity Balance
---------------- -------- -------- -------
Park Investment - C.P. 3.47 06-10-93 01-10-94 $1,176,010
Park Investment - FNMA 4.08 07-10-92 01-10-94 955,000
Paine Webber - FHL 3.53 09-10-92 01-25-94 800,000
Dain Bosworth-Treas. 3.42 09-10-92 01-31-94 390,000
Park National - C.D. 3.75 02-02-93 01-31-94 500,000
1st Banks - FHL 3.92 08-10-92 02-25-94 460,000
1st Banks - FHL 4.30 12-01-92 02-25-94 1,040,000
1st Banks - FHL 5.35 02-28-91 02-28-94 500,000
1st Banks - FC 5.80 04-01-92 04-04-94 1,000,000
Dain Bosworth - Treas. 3.75 10-13-92 04-15-94 1,000,000
1st Banks - Treas. 4.18 11-02-92 04-30-94 1,050,000
Dain Bosworth - Treas. 4.09 12-28-92 04-30-94 650,000
) Dain Bosworth - FNMA 4.25 12-28-92 05-22-94 518,551
Park National - C.D. 3.50 03-01-93 05-22-94 1,000,000 )
Dain Bosworth - Treas. 3.61 03-31-93 07-31-94 1,000,000
Park National - C.D. 3.55 04-30-93 09-07-94 1,250,000
1st Banks - C.P. 3.44 12-30-93 09-26-94 341,206
1st Banks - Treas. 3.57 07-07-93 09-30-94 1,000,000
Park Investment - Treas. 3.49 10-01-93 11 -15-94 1,020,007
Dain Bosworth - Treas. 3.61 11-15-93 11-30-94 1,512,625
Dain Bosworth - Treas. 3.65 11-15-93 12-31-94 1,004,844
Dain Bosworth - FHL 3.59 10-25-93 01-25-95 1,554,187
1st Banks - FNMA 3.90 12-01-93 03-10-95 2,431,913
1st Banks - FC 3.90 12-02-93 04-03-95 729,626
1st Banks - FHL 3.84 09-20-93 09-20-95 1,000,000
4M Fund Various Open 614,676
----------
Total Investments 24,498,645
----------
\ ,J
Legend: C.D. = Certificate of Deposit
C.P. = Commercial Paper
F.C. = Farm Credit
F.N.M.A. = Federal National Mortgage Assn.
F.H.L.B. = Federal Home Loan Bank
Treas.= U.S. Treasury Bonds
Gov't Agencies = Term U.S. Government Securities
F e b ru a ry 7 , 19 9 4
EDA
TO:
THROUGH:
FROM:
SUBJECT:
Economic Development Authority
Charlie Meyer, Executive Director uft'Jfl
Mac McBride, Finance Directo~o
Don Rambow, Asst. Finance Director
January 1994 EDA Monthly Statement
The Combining Statement of Revenue and Expenditures, the Individual Statement of
Revenue and Expenditures and the Schedule of Investments provides in summary form
the financial position of the EDA at the end of the first month of the 1994 fiscal year.
There were no expenditures during the month of January. Revenue received included
interest on investments and a $50,000 payment from SPS Plumbing in reimbursement
for legal fees paid by the City on their behalf.
)
?
Revenue
St. Louis Park Economic Development Authority
Combining Statement of Revenue and Expenditures
Budget and Actual
For Period Ending January 31, 1994
YTD Balance Percent
Collected/ Uncollec./ Collected/
Budget Expended Unexpend. Expended
Tax increment
Rent
Interest
Transfers
Refunds & Reimburse
Total Revenue
Expenditures
Administrative
Salaries
Employee benefits
Supplies & other chgs.
Legal
Contractual
Planning
Total Administrative
Project Cost
Professional service
Legal
Environ. analysis
Public improvement
Relocation/demolition
Property acquisition
Environ. remediation
Referendum payment
Property Maintenance
Other services
Transfers
Total Project Costs
Debt Service
Bond interest
Transfer
Inter-govt., City
Bond agent fees
Total Debt Service
Total Expenditures
Revenue over (under)
Expenditures
$3,100,740 $
4,680
639,005
3,744,425
$3,100,740
390 4,290
139,652 499,353
50,000
8
22
(50,000)
190,042 3,554,383 5
84,520 84,520
17,278 17,278
4,647 4,647
3,560 3,560
--------- --------- ---------
110,005 110,005
--------- --------- ---------
108,200 108, 200
75,000 75,000
2,000 2,000
7,392,000 7,392,000
692,500 692,500
824,800 824,800
\
22,860 22,860
8,000 8,000
---------- --------- ----------
9,125,360 9,125,360
---------- --------- ----------
504,000 504,000
840,000 840,000
--------- --------- ---------
1,344,000 1,344,000
---------- --------- ----------
10,579,365 10,579,365
---------- --------- ----------
(6,834,940) 190,042 (7,024,982) (3)
--------- --------- --------- === ---------
St. Louis Park Economic Development Authority
Indiv id ual Statement Of Revenue And Expenditures
For Period Ending January 31, 1994
Revenue
Tax in crement
Rent
Interest
Transfers
Refu nd/reim burse
Total Revenue
Expend it ures
Adm in istrativ e
Sala rie s
Employ ee benefit s
Supplie s & other chgs.
Legal
Contractual
Pla nning
Total Adm in istrative
) Project Cost
J Apprais al/survey
Legal
Envir on . analy sis
Public im provement
Relo catio n/demolit io n
Property tax
Acquis it io n
Referendum payment
Property main tenance
Other servic es
Total Project Costs
Debt Servic e
Bond in terest
Transfer
Inter-govt ., City
Bond agent fees
Total Debt Servic e
Total Expend it ures
R evenue over (under)
J' Expend it ures
Excels io r Oak Park
Blv d Village
$ $ $ $
390
91,737 10 ,7 25 2,5 98 30 ,151
50 ,0 00
91,737 11 ,11 5
91,737
=========
Trunk
Hwy 7
52,5 98
11,115 52,5 98
======= =========
Capit al
Project s
30 ,151
30 ,151
=======
Debt
Servic e Total
$ $
390
4,4 41 139,6 52
50,0 00
4,4 41 190,042
4,4 41 190,042
======= =========
ST. LOUIS PARK ECONOMIC DEVELOPMENT AUTHORITY
SCHEDULE OF INVESTMENTS
January 31, 1994
Date
Investments --------------------
Institution/Type Yield Purchase Maturity Balance
---------------- -------- -------- -------
1st Banks - FHL 3.92 08-10-92 02-25-94 $460,000
1st Banks - FHL 4.30 12-01-92 02-25-94 1,040,000
1st Banks - FHL 5.35 02-28-91 02-28-94 500,000
1st Banks - FC 5.80 04-01-92 04-04-94 1,000,000
Dain Bosworth - Treas. 3.75 10-13-92 04-15-94 1,000,000
1st Banks - Treas. 4.18 11-02-92 04-30-94 1,050,000
Dain Bosworth - Treas. 4.09 12-28-92 04-30-94 650,000
Dain Bosworth - FNMA 4.25 12-28-92 05-22-94 518,551
Park National - C.D. 3.50 03-01-93 05-22-94 1,000,000
Dain Bosworth - Treas. 3.61 03-31-93 07-31-94 1,000,000
Park National - C.D. 3.55 04-30-93 09-07-94 1,250,000
1st Banks - c.P. 3.44 12-30-93 09-26-94 341,206
1st Banks - Treas. 3.57 07-07-93 09-30-94 1,000,000
Park Investment - Treas. 3.49 10-01-93 11-15-94 1,020,007
Dain Bosworth - Treas. 3.61 11-15-93 11-30-94 1,512,625
Dain Bosworth - Treas. 3.65 11-15-93 12-31-94 1,004,844
Dain Bosworth- FHL 3.59 10-25-93 01-25-95 1,513,312
1st Banks - FNMA 3.90 12-01-93 03-10-95 2,431,913
1st Banks - FC 3.90 12-02-93 04-03-95 729,626
Park Investment - Treas. 3.25 01-10-94 04-30-95 1,513,744
1st Banks - Treas. 3.65 01-31-94 04-30-95 1,518,756
1st Banks - FHL 3.84 09-20-93 09-20-95 1,000,000
4M Fund Various Open 1,068,676
----------
Total Investments $24,123,260
----------
Legend: C.D. = Certificate of Deposit
C.P. = Commercial Paper
F.C. = Farm Credit
F.N.M.A. = Federal National Mortgage Assn.
F.H.L.B. = Federal Home Loan Bank
Treas.= U.S. Treasury Bonds
Gov't Agencies = Term U.S. Government Securities
V E N D O R C L A I M S
E c o n o m i c D e v e l o p m e n t A u t h o r i t y -S t . L o u i s P a r k
F e b r u a r y 7 , 1 9 9 4
V e n d o r
A d o l f s o n & Peterson, Inc.
Braun Intertec Corporation
EDAM
First Trust National Assoc.
Frontier Foundations, Inc.
Kraus-Anderson Construction Co.
Laden's Business Machines, Inc.
Moody's Investors Service
Popham, Haik, Schnobrich
STS Consultants, Ltd.
Description
Park Nicollet Ramp
Services
Registration fee
Bonds & interest
Park Nicollet Ramp
Park Nicollet Ramp
Services
Professional services
Legal services-November
Professional services
Amount
$ 450,567.85
269.60
45.00
852,000.00
345,248.00
54,420.58
146.44
5,000.00
3,434.35
1,527.35
TOTAL
) Accounting Dept. ). //g2MA_
Executive Direct~ ,b fr
$1,712,659.17
oesa>/ls/]
o»he
.c 323g %
P O PHA M, HA IK, SCHNOBRICH AND KAUFMAN
November 1993
r')
I
CLIENT/MATTER TIME FEES EXPENSES
11959 ST. LOUIS PARK ECONOMIC
DEVELOPMENT AUTHORITY
4 Meetings 0.9 $108.67
5 On the Avenue Project 6 $688.50 $10.34
13 Suburban Plumbing Project 3 $317.50
14 Park Nicollet Project 13.3 $2,207.50 $89.00
18 Park Nicollet Redevelopment-Reimb Fees $12.84
TOTALS 23.2 $3,322.17 $112.18
2