Loading...
HomeMy WebLinkAbout1993/12/06 - ADMIN - Agenda Packets - Economic Development Authority - RegularREQUEST- FOR EDA ACTION DATE Dec. 6, 1993 AGENDA SECTION: New Business NO. 7 ORIGINATING DEPARTMENT: Administration ITEM: Change Order No. 1: Parking ramp at NO. 7a Tower Pl ace APPROVED: Robert J. Larson~ Background The Tower Place parking ramp has been under construction since October 1993. With this report, the Construction Manager, Kraus- Anderson, is requesting formal approval by the EDA of Change Order No. 1 for the project which includes 12 items with a total net deduction of $129,044 representing 10 deductions and 2 additions. Discussion \ ) Beginning on October.14, 1993 members of the project team have been meeting to discuss means and methods whereby the total project costs may be reduced. This process is commonly referred to as value engineering and it involves changing the construction method and/or the construction materials from the original specifications. These changes do not compromise the structural integrity of the parking ramp or its exterior finishes. Attached is Change Order No. 1 with the 12 items. Further details on these items are described in the attached narrative from Kraus-Anderson's Construction Manager. Recommendation: It is recommended the EDA adopt the attached resolution approving Change Order No. 1 in the amount of$129,044 to Contract EDA-8-93 with Adolfson & Peterson for construction of the Tower Place parking ramp. attch. PUBLIC WORKS APPROVAL FAINED FINANCE APPROVAL OBTAINED COMMUN1 I Y DUE VELUH. APPROVAL OBTAINED APPROVAL OBTAINED MANAGER'S APPRovAt /? 2 osrAie <37 COUNCIL ACTION: MOTION BY 2ND BY TO CH AN G E O R D ER (SEE NARRATIVE ATTACHED) Distribution to: OWNER X HGA X KRAUS-ANDERSON X CONTRACTOR KA FIELD JOHN DECOSTER X X X ' 3OUECT: Park Nicollet Tower Place Parking Ramp (name, address) 5000 West 39th Street St. Louis Park, MN 55416 TO (Contractor): Adolfson & Peterson, Inc. 6701 West 23rd Street Minneapolis, MN 55426 You are directed to make the following changes in this Contract: CHANGE ORDER NUMBER: ONE (1) INITIATION DATE: 11/9/93 ARCHITECT'S PROJECT NO: 868.030.06 CONSTRUCTION MANAGER'S PROJECT NO: 4185 CONTRACT FOR: General Construction CONTRACT DATE: October 5, 1993 1. Delete Microsilica. 2. Add 40% sealer. 3. Delete footings, grade beams on top of cap with insulation at bottom of grade beam per HGA memo dated October 7, 1993. 4. Change SOG from fiber mesh concrete to 4" class 5 and 4" blacktop, per HGA Drawing A201P. 5. Plumbing modifications per HGA Drawing A201P (omit 5 FD2 drains). 6. Changes in floor grade - Bolander quote. (Refer to HGA Drawing A201P Revision 10/10/93.) 7. Delete tree transplanting - Bolander quote. 8. Delete temporary fencing. 9. Elevator changes. 10. Change underside deck painting to one coat per Thorocoat. 11, Delete resilient and carpet. 12. Delete wood piling. DEDUCT: ($43,900.00) A D D : 16,060.00 DEDUCT: (22,093.00) DEDUCT: (21,689.00) DEDUCT: (1,288.00) [rorA_pzpucr_ CHAN@z op=_NuMgE_ONE (1): DEDUCT: (11,250.00) DEDUCT: (800.00) DEDUCT: (7,185.00) DEDUCT: (3,699.00} DEDUCT: (7,200.00) DEDUCT: (20,000.00) DEDUCT: (6,000.00) DEDucr:($129,044.00) Jot valid until signed by the Owner, the Architect (HGA) and the Construction Manager (Kraus-Anderson Construction Company). ,,;ignature of the Contractor indicates agreement herewith, including any adjustment in the Contract Sum or the Contract Time. The original Contract Sum was Net change by previously authorized Change Orders The Contract Sum prior to this Change Order was The Contract Sum will be {(inereased) (decreased) (unchanged) by this Change Order The new Contract Sum including this Change Order will be The Contract Time will be {(increased) (decreased) (unchanged) by The Date of Substantial Completion as of the date of this Change Order therefore is June 3, 1994. Recommended By Construction Manager: Approved By Re-Developer: KRAUS-ANDERSON CONSTRUCTION COMPANY PARK NICOLLET MEDICAL CENTER HOLDINGS $ $ $ $ 4,263,000.00 0.00 4,263,000.00 (129,044.00) 4,133,996.00 (0 )Days 525 South Eighth Street, Minneapolis, MN 55404 5000 West 39th Street, St. Louis Park, MN 55416 BY Donald D. Hackert, Vice President DATE Agreed To By Contractor: ADOLFSON & PETERSON, INC. 6701 West 23rd Street, Minneapolis, MN 55426 Approved By Architect: 'AAMMEL, GREEN & ABRAHAMSON, INC. 1201 Harmon Place, Minneapolis, MN 55403 BY Joseph Mitlyng, Vice President DATE Authorized By Owner: ECONOMIC DEVELOPMENT AUTHORITY CITY OF ST. LOUIS PARK 5005 Minnetonka Boulevard, St. Louis Park, MN 55416 BY John Palmquist, Vice President DATE BY Keith J. Meland, President DATE BY Charles W. Meyer, Executive Director DATE BY Gary Nyberg, Vice President DATE NARRATIVE CHANGE ORDER #I PARK NICOLLET MEDICAL CENTER ) TOWER PLACE PARKING RAMP 1. Delete Microsilica <$43,900.00> Specification section 03300, Paragraph H7 specifies silica fume admixture in the amount of 5% by weight of cement. Silica fume is a state of the art additive to help prevent chlorides from reaching the resteel, thus causing corrosion. In lieu of the silica fume, the owner has opted to utilize a sealer over the concrete surface. This sealer also prevents the chlorides from reaching the reinforcement but does require maintenance and reapplication. The sealer is normally reapplied every three to five years, especially in the heavy traffic areas. 2. Add 40% Sealer $16,060.00 This penetrating sealer is being utilized in lieu of the silica fume for corrosion protection. 3. \ ) Delete footings, grade beams on top of cap with insulation <$22,093.00> at bottom of grade beam per HGA memo dated 10/7/93 HGA has discussed with the General Contractor (Adolfson & Peterson) various methods of concrete placement with relatyion to design at the footings and grade beams. It was decided by HGA that the structural integrity of the grade beams would be maintained by a modified design resulting in a credit to the owner. 4. Change slab on grade from fiber mesh concrete to <$21,689.00> 4" class 5 and 4" blacktop, per HGA drawing A201P This item changes the lower levels from a Portland cement concrete to an asphaltic blacktop concrete. This will allow the upper level concrete to proceed through the winter season with the lower level being completed in the spring, after the ground thaws. 5. Plumbing modifications per HGA Drawing A201P <$1,288.00> Due to the change from concrete to asphalt in the lower level, modifications to the plumbing and drainage system were required (omitted five (5) FD2 area drains). 6. Changes in floor grade per HGA Drawing A201P <$11,250.00> Revision dated 10/10/93 This item reflects the excavation backfill changes requested by Park Nicollet Medical Center. The changes include the raising of the elevation, at one end of the ramp, one foot. The reason for the changes was to limit and reduce the areas of possible dump exposure during the excavation phase. 7. Delete Tree Transplanting <$800.00> Tree transplanting has already been accomplished by Park Nicollet Medical Center, thus this item is not required by the Contractor. \ ) 8. Delete Temporary Fencing <$'7,185.00> Temporary fencing is being installed by the Construction Manager, thus this item is not required by the Contractor. 9. Elevator Changes <$3,699.00> This item includes the deletion of one push-button panel. There were two push-button panels; one on each side of the door. There will only be one now. This item also includes the substitution of standard "in case of fire" signage in lieu of engraving on the whole push-button station. This item also includes the substitution of baked enamel finish for the hoistway doors in lieu of stainless steel #4. This item also includes the changing of the door opening from center to single slide and the deletion of engraving in the car control station. This elevator still complies with the ADA requirements, which is the American Disabilities Act. 10. Change underside deck painting to one coat of Thorocoat <$'7,200.00> This item requires changing the paint on the underside of the parking ramp deck from a primer and a two coat finish to a one coat white Thorocoat smooth system. The one coat of Thorocoat still provides the cover and the illumination required by the Architect. 1l. Delete Resilient and Carpet <$20,000.00> This item represents just a transfer of responsibility by deducting the resilient and carpet from the General Contractor's contract and putting it in Park Nicollet's area of responsibility. Park Nicollet has decided to furnish and install the carpet themselves. This allows them a better selection process, which they desire. 12. Delete Wood Piling <$6,000.00> This represents a unit price option that was in the original specifications. During the excavation phase where the wood piling was to be installed, Braun Intertec observed soil requirements that were adequate, thus wood piling was not required. PAGE 2 OF 2 December 6, 1993 EDA TO: Economic Development Authority THROUGH: Charlie Meyer, Executive Director • (¢9- r /.+ ·- FR OM : Mac McBride, Finance Director \/ Don Rambow, Asst. Finance Director SUBJECT: November 1993 EDA Monthly Statement ) The Combining Statement of Revenue and Expenditures, the Individual Statement of Revenue and Expenditures and the Schedule of Investments provides in summary form the financial position of the EDA. Revenue coll ect ions refl ect interest received on investments which matured during October. Sig nif icant expenditures reflect traffic impact study and environmental clean up costs associated with the Park Nicollet project and landscaping near South Oak Pond. St. Louis Park Economic Development Authority Combining Statement of Revenue and Expenditures Budget and Actual For Period Ending November 30, 1993 YTD Balance Percent Collected/ Uncollec./ Collected/ Budget Expended Unexpend. Expended Revenue Tax increment Rent Interest Transfers Refunds & Reimburse Total Revenue Expenditures Administrative Salaries Employee benefits Supplies & other chgs. Legal Contractua 1 Planning T otal Administrative Project Cost Appraisal/survey Legal Environ. analysis Public improvement Relocation/demolition Property taxes Acquisition Environ. remediation Referendum paym ent Property Maintenance Other services Transfers Total Project Costs Debt Service Bond interest Transfer Inter-govt., City Bond agent fees Total Debt Service Total Expenditures Revenue over (under) Expenditures $2,331,371 $1,593,027 4,680 4,290 555,000 1,020,890 4,057,652 504,000 175,000 248,873 7,123,703 3,371,080 3,752,623 84,000 17,170 5,420 7,200 1,700 10,000 125,490 75,000 43,300 6,743,500 95,000 74,362 1,824,800 62,500 340,000 16,500 30,500 3,553,652 504,000 504,000 620,000 61,681 12,444 3,748 3,126 1,200 44,985 127,184 138,282 103,032 1,925,648 101,533 204,778 8,527 4,065 $738,344 390 (465,890) 3,553,652 (73,873) 22,319 4,726 1,672 4,074 500 (34,985) (1,694) (63,282) (59,732) 4,817,852 (6,533) 74,362 1,620,022 62,500 340,000 7,973 26,435 3,553,652 12,859,114 2,485,865 10,373,249 504,000 504,000 620,000 1,628,000 1,628,000 14,612,604 4,241,049 10,371,555 (7,488,901) (869,969)(6,618,932) 68% 92 184 12 47 73 72 69 43 71 450 101 184 238 29 107 11 52 13 19 100 100 100 100 29 12 ========= ========= === St. Louis Park Economic Development Authority Individual Statement Of Revenue And Expenditures For Period Ending November 30, 1993 Excelsior Oak Park Trunk Capit al Debt Revenue Blvd Vil 1 age Hwy 7 Projects Service Total ------- --------- -------- ------- -------- ------- ------- Tax increment $1,031,179 $199,755 $362,093 $ $ $1,593,027 Rent 4,290 4,290 Interest 645,235 71 ,133 59,516 212,044 32,962 1,020,890 Transfers 504,000 504,000 Refund/reimburse 248,873 248,873 --------- ------- ------- ------- ------- --------- Total Revenue 1,925,287 275,178 421,609 212,044 536,962 3,371 ,080 --------- ------- ------- ------- ------- --------- Expenditures ------------ Administrative Salaries 24,047 12,991 24,643 61,681 Employee benefits 4,310 2,500 5,634 12,444 Supplies & other chgs. 1,846 890 1,012 3,748 Legal 1,049 1,039 1,038 3,126 Contractual 610 235 355 1,200 Planning 44,985 44,985 --------- ------- ------- --------- Total Administrative 76,847 17,655 32,682 127,184 --------- ------- ------- --------- Project Cost A ppraisal/survey 9,235 138,282 Legal 129,04 7 Environ. analysis 98,601 4,431 103,032 Public improvement 50,814 1,874,834 1,925,648 Relocation/demolition 98,641 2,892 101,533 Property tax Acquisition 80,148 124,630 204,77 8 Referendum payment Property maintenance 2,257 2,520 3,750 8,527 Other services 847 3,218 4,065 --------- ------- --------- --------- Total Project Costs 460,355 2,520 2,022,990 2,485,865 --------- ------- --------- --------- Debt Service Bond interest 504,000 504,000 Transfer 504,000 504,000 Inter-govt., City 620,000 620,000 Bond agent fees --------- ------- --------- Total Debt Service 1,124,000 504,000 1,628,000 --------- ------- --------- ------- --------- Total Expendit ures 1,661,202 20,175 2,055,672 504,000 4,241,049 --------- ------- --------- ------- --------- Revenue over (under) <O Expenditures 264,085 255,003 (1,634,063) 212,044 32,962 (869,969) --------- ------- ========= ------- ======= --------- --------- ------- ------- 2 ST. LOUIS PARK ECONOMIC DEVELOPMENT AUTHORITY SCHEDULE OF INVESTMENTS November 30, 1993 Date Investments -------------------- Institution/Type Yield Purchase Maturity Balance ---------------- -------- -------- ------- 1st Banks - FC 3.77 12-10-92 12-01-93 $750,000 Dain Bosworth - FC 4.03 07-08-92 12-02-93 1,000,000 Park Investment - C.P. 3.47 06-10-93 01-10-94 1,176,010 Park Investment - FNMA 4 .08 07-10-92 01-10-94 955,000 Paine Webber - FHL 3.53 09-10-92 01-25-94 800,000 Dain Bosworth-Treas. 3.42 09-10-92 01-31-94 390,000 Park National - C.D. 3.75 02-02-93 01-31-94 500,000 1st Banks - FHL 3.92 08-10-92 02-25-94 460,000 1st Banks - FHL 4.30 12-01-92 02-25-94 1,040,000 1st Banks - FHL 5.35 02-28-91 02-28-94 500,000 1st Banks - FC 5.80 04-01-92 04-04-94 1,000,000 Dain Bosworth - Treas. 3.75 10-13-92 04-15-94 1,000,000 ) 1st Banks - Treas. 4.18 11-02-92 04-30-94 1,050,000 Dain Bosworth - Treas. 4.09 12-28-92 04-30-94 650,000 Dain Bosworth - FNMA 4.25 12-28-92 05-22-94 518,551 Park National - C.D. 3.50 03-01-93 05-22-94 1,000,000 Dain Bosworth - Treas. 3.61 03-31-93 07-31-94 1,000,000 Park National - C.D. 3.55 04-30-93 09-07-94 1,250,000 1st Banks - Treas. 3.57 07-07-93 09-30-94 1,000,000 Park Investment - Treas. 3.49 10-01-93 11-15-94 1,020,007 Dain Bosworth - Treas. 3.61 11-15-93 11-30-94 1,547,313 Dain Bosworth - Treas. 3.65 11-15-93 12-31-94 1,027,969 Dain Bosworth - FHL 3.59 10-25-93 01-25-95 1,554,187 1st Banks - FHL 3.84 09-20-93 09-20-95 1,000,000 4M Fund Various Open 1,005,103 ---------- Total Investments 23,194,140 ========== Legend: C.D. = Certificate of Deposit C.P. = Commercial Paper F.C. = Farm Credit F.N.M.A. = Federal National Mortgage Assn. F.H.L.B. = Federal Home Loan Bank Treas.= U.S. Treasury Bonds Gov't Agencies = Term U.S. Government Securities 3 V E N D O R CL A IM S Eco n om ic D e v e l o pm en t A u th o r i ty -S t . L o u i s Pa rk D e c e m b e r 6 , 19 9 3 V en do r F e d e r a l Ex p r e s s Co r p . Po p h am , H a ik , Sc h n ob r i c h A e tn a L i f e In su r a n ce Co . Br a u n In te r t e c Co r p . Ce n tr a l L a n d s c a p i n g In c . Ci ty of St . L o u i s P a r k L e g e n d T e c h n i ca l Se r v i ce s C . S . M c C r o s s a n Co n st r u ct i on M in n . Po l l u t i on Co n tr o l A g en cy N ob l e N u r s e r y R e ta il In c . Or r -S c h e l e n -M ay e r on & Assoc. Popham, Haik, Schnobrich Strgar-Roscoe-Fausch Inc. STS Consultants Ltd. TOTAL ) Description Services(previously issued) Legal services-August(prev. issued) Cityscape Project Services Landscaping services Grounds mtnce. services Services Services Services Services Services Legal services-September Services Services Amount $ 63.75 16,757.50 62,4OO.OO 4,693.80 22,627.64 13,9O4 .55 1,074.00 2,053.40 3,436.88 1,415.50 2,450.00 18,063.65 4,349.48 1O,627.91 $163,918.06 Accounting Dept. Dated _Z2hzli »hoe ® p Executive Director f lated P O P H A M HAIK SCH N O BRICH & KAU FMAN , LTO. U.S. O F F IC E S : DENVER, COLORADO TEL 303-893-1200 M IA M I, F L O R ID A TEL 305-530-0050 SuiTE 3 3 0 0 2 2 2 SOUTH NINTH STREET M IN N EAPOLIS, M IN N ESOTA 5 5 4 0 2 TEL 6 1 2 -3 3 3 -4 8 0 0 F A X 6 1 2 -3 3 4 -8 8 8 8 INTER N ATION A L O FFIC ES: LEIPZIG , G ER M A N Y TEL O1149-341-4918429 STUTTGART, GERMANY TEL O1149-711-296303 WASHINGTON, D.C. TEL 202-962-8700 JAMES R. STEILEN, ESQ. DIRECT DIAL (612) 334-2547 October 1, 1993 ) CLIEN T /M A TT ER I TI M E I FEES I EXPEN SE 11959 St. Louis Park Economic I I I Development Authority I I 1 Level I General Matters I I $8.39 4 Meeting I 1.9 ! $229.43 [ 5 On the Avenue Project I 35.2\ $4,478.50 $37.16 13 Suburban Plumbing Project I 16.8 I $3,203.00 $125.86 14 Park Nicollet Project I 8.4] $1,442.50 I $13.71 15 Tower Site Environmental Matters i 3.2 $428.00 [ $29.06 16 Water Tower Property Title Registration I 56, $5,897.00 $864.89 TOTALS I 121.5/ $15,678.43 ] $1,079.07 I P o p h a m , H a ik , S c h n o b r ic h a n d K a u f m a n ; CLIENT/MATTER TIME FEES EXPENSE 11959 St. Louis Park Economic Development Authority 4 Meeting 0.9 $108.67 5 On the Avenue Project 26 $3,538.50 $293.88 13 Suburban Plumbing Project 24.3 $3,808.00 $184.76 14 Park Nicollet Project 59.5 $8,782.00 $62.74 15 Tower Site Environmental Matters 7.1 $1,030.00 $2.79 16 Water Tower Property Title Registration 0.8 $72.00 $38.71 18 Park Nicollet Redevelopment-Reimb Fees $141.60 TOTALS 118.6 $17,339.17 $724.48 ) . I ~ . ' . i :c; j\ · 393 gI4A October 29, 1993 1001091 O.XLS