HomeMy WebLinkAbout1993/08/16 - ADMIN - Agenda Packets - Economic Development Authority - RegularAGEND A
ECONOMIC DEV ELOPMENT AUTHORITY
ST. LOUIS PAR K, MINN ESOTA
August 16, 1993
7100 P.M.
1. Call to order
2. Roll call
3. Approval of minutes of Auqust 2, 1993 meeting
4. Approval of agenda for Auqust 16, 1993 meeting
5. Reports
a. Request of SPS Companies for access to Pie-A-Pop site
to conduct soil borings [}/J] 7 -O
Action: Motion to approve request
b. Tower Place parking ramp
) Action : Motion to approve plans and specifications for the
parking ramp and authorize staff to advertise for and
receive bids I4}/CH 7 o
6. Other Business
7 . Adjournment ./ E 7:/
R E Q U E S T F O R ED A A C T IO N
DATE
August 16, 1993
AGENDA SECTION: eports
NO. =
ORIGINATING DEPARTMENT:
Community Development
ITEM: Request for SPS Access to
Pic-a-Pop Site for Soil Borings
NO. 5a
~®id Hagen, Director
BA C KG R OU N D
As indicated in a memo to the Economic Development Authority that was
distributed at the study session on August 9, SPS has requested
permission from the Economic Development Authority to go on to the
Pie-a-Pop site for doing soil borings. The purpose for the borings
will be to determine whether the soil under the underground storage
tanks removed from the site in 1987 is contaminated. Attached is an
access agreement that was drafted by SPS' attorney that would give SPS
the right to go on to the property to do borings. This agreement has
been reviewed by the EDA's attorney and found to be acceptable.
RECOMM ENDATION
)
By motion approve the access agreement and authorize its execution by
the President and Executive Director
4 312:GEN43
P U BL IC WORK S
AP PRO V AL
] ACTIO N:
FINANCE
APP ROVAL
O BTAINED
COMMUNITY UEVELUH.
APPRO VAL
OBTAINED
APPROVAL
OBTAINED
Executive Director
APPROVAL //.
OBTAIN= -{Tn
MO TIO N BY 2NDBY TO
A C C E S S A G R E EM E NT
)
TH IS ACCESS AGRE EME NT is made this day of '
1993, by and between the Economic Development Authority of the City
of St. Louis Park (th e "EDA") and SPS Companies, Inc., a Minnesota
corporation ("SPS").
RECITALS:
A. The EDA owns the real property described on Exhibit A
attached hereto and incorp orated herein by this reference (the
"property") .
B. In connection with th e redevelopment of property owned
by SPS adjacent to the Property, the EDA is contemplating conveying
the Property to SPS, subject to certain conditions.
C. Underground storage tank s have been located previously
on the Property. Prior to taking title to the Property, SPS
desires to perform certain environm ental investigations.
NOW, THEREFORE, for valuable consideration, th e receipt and
sufficiency of which are hereby acknowledged, the parties hereby
agree as follows:
1. Grant of License. The EDA hereby grants a license for
SPS and its agents to enter upon the Property to conduct
environmental tests, including without limitation, to drill soil
borings. The EDA may revoke this license on thr ee (3) days written
notice.
2. Conduct gf_Investigation. SPS shall employ competent
environmental consultants to conduct the environmental tests. SPS
shall pay all th e costs of perform ing the tests. SPS indemnifies
the EDA for any liens filed against th e Property for unpaid costs
of the environme ntal tests. SPS shall notify the EDA when tests
are to be perform ed on the Property. SPS promptly will provide
copies of any environmental reports to the EDA. If SPS discovers
contamination on the Property, SPS shall promptly report the
contamination to the EDA. Noth ing in this Agr eement shall obligate
SPS to take responsibility for or to pay for any cleanup required
as a result of contam ination discovered on the Property.
3. Ownership Test Work Product. SPS agrees that all
environmental testing reports with respect to th e Property shall
be addressed both to SPS and the EDA. It is the intent of the
parties that the EDA be legally entitled to rely upon all such
reports. If SPS does not acqu ire the property pursuant to the
agr eement to be entered into between the ED A and SPS, then the EDA
shall be entitled to the possession and own ership of copies of all
reports, data, and field notes associated with such testing. At
the option of the EDA and at the expense of the EDA the
environmental consultants shall take split samples for all tests.
One sample from each such split sample shall belong to the EDA .
200'352
K £'348= 78L01
4. Restoration. SPS shall complete use of the license
and the license shall expire on November 1, 1993 unless earlier
revoked. Upon completion of such tests and prior to expiration of
the license, SPS shall restore the property to the condition it was
in prior to the commencement of such tests.
IN WITNESS WHEREOF, the parties have executed this
Agreement as of the day and year first above written.
ECONOMIC DEVELOPMENT AUTHORITY OF
THE CITY OF ST. LOUIS PARK
By
Its --------------
SPS COMPANIES, INC.
By
Its --------------
TRM\APEX\access. agr 2
EXHIBIT A
The East 22 feet of Lot 10, the West 29 feet of the South one-half of Lot 1l and the West 24 feet of
the North one-half of said Lot 11, all in Block 32, St. Louis Park Centre,
except that part lying Northerly of the following described line:
Commencing at the Southeast corner of Section 17, Township 117 North, Range 21 West of the
Fifth Principal Meridian; thence North 01 degrees 00 minutes 13 seconds East, assumed
bearing, along the East line of said Section 17 a distance of 1401.57 feet; thence South 88
degrees 59 minutes 47 seconds East a distance of 1089.98 feet to the point of beginning of the
line to be described; thence South 64 degrees 28 minutes 14 seconds West a distance of 366.58
feet; thence Southwesterly along a tangential curve, concave to the Northwest, radius 3951. 70
feet, central angle of 07 degrees 00 minutes 02 seconds, a distance of 482.82 feet; thence South
71 degrees 28 minutes 16 seconds West, tangent to said curve, a distance of 128.39 feet; thence
Westerly along a tangential curve, concave to the North, radius 973. 77 feet, central angle 19
degrees 4 7 minutes 50 seconds, a distance of 336.46 feet; thence North 88 degrees 43 minutes
54 seconds West, tangent to last said curve a distance of 426.23 feet and there terminating.
)
Tracts A. B. C and D. Registered Land Survey No. 297, Files of Registrar of Titles, County of
Hennepin.
REQUEST- FOR EDA ACTION
DATE Aug. 16, 1993
AGENDA SECTION: Reports
NO. 5
ORIGINATING DEPARTMENT:
Administration
ITEM: Parking ramp - Tower Pl ace
NO. 5b
APPROVED:
Robert Larson
e
Background
On August 2, 1993, the EDA approved the plans and specifications
for the pile foundation system for the Tower Place parking ramp
and authorized staff to advertise and receive bids for that
portion of the project. Since that time, City staff has continued
to review the plans and specifications for the parking ramp
portion of this project. The plans and specifications are being
developed by Park Nicollet/Frauenshuh and HGA, Inc. and in turn
will be purchased by the EDA upon conveyance of the Tower Place
land from the EDA to Park Nicollet/Frauenshuh.
Discussion
)
At this time, the plans and specifications for the parking ramp
are ready to be placed for bidding. City staff has reviewed and
approved the construction plans and specifications for this
portion of the project. Staff's review has included concerns and
comments from the EDA, Planning Commission, neighborhood
residents and neighborhood groups. These in turn have been
incorporated by HGA into the plans and specifications.
Some of the more immediate concerns are exterior building materials,
ramp lighting and ramp security.
The exterior material to be used in the ramp construction is
precast concrete that matches the precast panels and sill colors
of the existing Park Nicollet Clinic in St. Louis Park.
Ramp lighting and ramp security are related issues. The lighting
fixtures are of a type that will illuminate the ramp interior but
should not spill over to adjacent properties or project into the
PUBLIC WOR KS [FINANCE COMMU NITY UEVtLUH. [MANAGER'S
APPROVAL APPROVAL APPROVAL APPROVAL APPROVAL
INED [OBTAINED [OBTAINED [OBTAINED [OBTAINED ®boo)sos»ooonoon
COUNCIL ACTION: MOTION BY 2ND BY TO
surrounding neighborhoods or across Highway 100.
Ramp security has been designed to exceed the City's existing
ordinance and follows closely the Minneapolis ordinance which has
become a national model for use in designing parking ramp
security. A set of plans and specifications are available for
review in Bob Larson's office.
If the EDA were to authorize staff tonight to advertise for and
receive bids for the parking ramp, then a recommendation for
award of contract could be presented to the EDA on October 4,
1993 with a construction start to follow immediately thereafter.
Recommendation: It is recommended the EDA approve the plans and
specifications for the parking ramp at Tower Place and authorize
and direct City staff to advertise for and receive bids for the
project.
Staff note: The August 2 EDA report on the piling foundation
system for the parking ramp project indicated that an award of
contract was to be presented to the EDA on September 7. Since the
August 2 meeting, Park Nicollet and Frauenshuh have notified the
City that the bond sale closing date has been moved from August
27 to September 29. Because the start of any construction on the
site cannot occur until after the bond sale closing, the award of
contract for the piling foundation system has been moved from
September 7 to October 4, the same meeting date scheduled for
award of contract for the ramp.