Loading...
HomeMy WebLinkAbout2015/02/04 - ADMIN - Agenda Packets - Planning Commission - RegularAGENDA PLANNING COMMISSION COUNCIL CHAMBERS 6:00 P.M. FEBRUARY 4, 2015 1. Call to order – Roll Call 2. Approval of Minutes of January 21, 2015 3. Hearings A. Major amendment to Planned Unit Development – Methodist Hospital Location: 6500 Excelsior Boulevard Applicant: Park Nicollet Methodist Hospital Case No.: 14-31-PUD B. Rezoning to POS Parks and Open Space Location: Meadowbrook Golf Course Applicant: City of St. Louis Park Case No.: 15-01-Z C. Comprehensive Plan Text Amendments - Planned Unit Developments Applicant: City of St. Louis Park Case No.: 14-32-CP 4. Other Business 5. Communications 6. Adjournment If you cannot attend the meeting, please call the Community Development Office, 952/924-2575. Auxiliary aides for individuals with disabilities are available upon request. To make arrangements, please call 952/924-2575 at least 96 hours in advance of meeting. UNOFFICIAL MINUTES PLANNING COMMISSION ST. LOUIS PARK, MINNESOTA JANUARY 21, 2015 – 6:00 p.m. COUNCIL CHAMBERS MEMBERS PRESENT: Lynne Carper, Claudia Johnston-Madison, Lisa Peilen, Carl Robertson, Joe Tatalovich MEMBERS ABSENT: Robert Kramer, Richard Person STAFF PRESENT: Gary Morrison, Sean Walther, Nancy Sells 1. Call to Order – Roll Call Vice-Chair Johnston-Madison opened the meeting. 2. Approval of Minutes of January 7, 2015 Commissioner Carper made a motion to approve the minutes of January 7, 2015. Commissioner Tatalovich seconded the motion, and the motion passed on a vote of 4-0-1 (Robertson abstained). 3. Old Business A. Zoning Ordinance Amendments – Outside storage in the IP District Applicant: James T. Smith Case No.: 14-29-ZA (tabled on January 7, 2015) Gary Morrison, Assistant Zoning Administrator, presented the staff report. He reviewed the three proposed amendments which were presented to the Commission on January 7, 2015. The Commission tabled consideration for further discussion, and requested staff meet with the applicant to review the proposed ordinance and recommend changes. Mr. Morrison stated that staff met with James Smith, an attorney representing Martin Bell. Staff confirmed its position on the first two proposed amendments which is that the City Council and City Attorney already stated the ordinance is clear and does not need to be amended. Mr. Morrison said at the meeting with Mr. Smith staff suggested revisions to the third option, allowing outdoor storage as a conditional use in the Industrial Park zoning district. Mr. Morrison stated the importance of reviewing the applicant’s request in the context of how it would impact all properties zoned IP along with the impacts it would have on neighboring properties. He reviewed the conditions, with recent revisions. Unofficial Minutes Planning Commission January 21, 2015 Page 2 Mr. Morrison mentioned the goals and strategies of the Comprehensive Plan that guide the city when considering zoning amendments. He spoke about the goals and strategies for industrial uses. Mr. Morrison discussed how the city uses performance standards, zoning districts and the zoning map to successfully mitigate the impacts of industrial uses on adjacent properties. He reviewed the purpose and intent of each of the three industrial zoning districts. Mr. Morrison presented and discussed a table which compared permitted uses in the Industrial Park and General Industrial Districts. He stated the definitions of principal and accessory uses. Mr. Morrison addressed comments regarding other existing uses occurring in the area. He noted proposals should be compared to legal uses, the Comprehensive Plan, and to the purpose/intent of the zoning district. A proposed use should not be compared to a legally non-conforming use. Mr. Morrison spoke about locations of IG and IP properties in the city and their proximity to residential. Mr. Morrison closed by saying staff recommends denial of the proposed amendments to the Zoning Ordinance pertaining to Outdoor Storage and the Accessory Use definition. Commissioner Peilen asked if the City Attorney has reviewed the proposed amendments. Mr. Morrison responded that the City Attorney has reviewed the proposed amendments and has recommended denial. Commissioner Tatalovich asked how often and what kind of requests the city receives for outdoor storage. Mr. Morrison responded one or two requests may be received a year. He said the request typically comes from landscapers. James Smith, applicant, attorney representing Martin Bell, provided a summary of the request. He spoke about Mr. Bell’s properties being linked historically due to parking purposes. Mr. Smith thanked staff for meeting with him recently to discuss concerns. He said the proposed conditions are designed to limit the nuisance factor and distinguishes it from the General Industrial district. He stated the proposal is a rational approach to the overall problem. A property is being used which fosters Unofficial Minutes Planning Commission January 21, 2015 Page 3 employment. When the lease was entered into with Tim’s Tree Service there was reliance on past use. He said the proposal is an attempt to remedy what the City Council described as an unintended consequence of the code. He added that the Council encouraged the process and the possibility of conditional use permit. Commissioner Carper commented on the importance of the zoning studies conducted in 1989 and 1991, and the extended period of time the Edgewood/Florida Ave. has been zoned as Industrial Park. He spoke about the unintended consequences the proposed amendments could create for other areas of the city. He said he recommends denial of the proposed amendments. Commissioner Robertson said he believes the current zoning is effective and said he does not see a good reason for the proposed amendments. He said he recommends denial. Commissioner Tatalovich said he is concerned about consequences of changing the code across the city. He thanked staff for the additional information. Commissioner Carper made a motion to recommend denial of the proposed Zoning Ordinance Amendments to Section 36-4 pertaining to the Accessory use or structure definition, to Section 36-243(c)(6) pertaining to Parking lots as an exclusive principal land use in the Industrial Park Zoning District, and to Section 36-243(d) to include outdoor storage as a Conditional Use. Commissioner Robertson seconded them motion, and the motion passed on a vote of 5-0. Sean Walther, Senior Planner, said the item is scheduled for City Council consideration on February 2, 2015. Mr. Smith, applicant, requested that the item be scheduled for City Council consideration on February 17, 2015. 4. Other Business 5. Communications Mr. Walther briefly discussed a Methodist Hospital expansion request which is scheduled for a public hearing at the next Planning Commission meeting on February 4, 2015. 6. Adjournment The meeting was adjourned at 6:40 p.m. Submitted by, Nancy Sells Adm. Secretary Planning Commission Meeting Date: February 4, 2015 Agenda Item #3A 3A. Methodist Hospital Campus – Planned Unit Development (PUD) Major Amendment Location: 6500 Excelsior Boulevard Case No.: 14-31-PUD Recommended Action: Chair to close public hearing. Motion to recommend approval of a Major Amendment to the PUD for the Methodist Hospital Campus. REQUEST: Park Nicollet Health Services requests approval of a Major amendment to the existing PUD for the Methodist Hospital Campus to allow construction of vertical building expansions will improve its patient rooms and surgical center. DEVELOPMENT PROPOSAL: Park Nicollet proposes additions to the east and west towers of the main hospital building at 6500 Excelsior Boulevard. Patient Room Modernization: This part of the project is comprised of two floors (5th and 6th Floor) vertical expansion above the existing hospital building totaling 38,334 square feet for new in-patient private rooms with associated family and nursing space. The project also includes renovation of existing patient room space on Floors 4-7 of the existing west tower of the hospital converting them from semi-private (two patients) to private (single patient) rooms. When the Patient Room Modernization is complete nearly all of the rooms at Methodist will be private. Surgery Expansion/ Renovation: The hospital also proposes a one story vertical expansion for Surgical Services on the west side of the hospital campus. This addition comprises a total of 20,535 square feet, of which 2,800 square feet is at the Ground Floor, 3,235 square feet is at the First Floor and 14,500 square feet is at the Second Floor. The project is a major renovation of the Surgery Center. It adds pre-op and post-op rooms, and sixteen operating rooms will be renovated and upgraded to accommodate state of the art equipment and have a standard layout which will increase safety and efficiency. Shell space for two additional operating rooms will be available for future expansion. Six small existing operating rooms will be decommissioned. “Link” Addition: A small addition is also proposed on the third floor connecting to shell space above the Cancer Center. This is a minor change to the building that can be approved administratively, but is mentioned in order to be comprehensive. NEIGHBORHOOD INPUT: Park Nicollet, City and Brooklawns neighborhood representatives met twice to discuss the proposed plans. The discussions centered on a list of neighborhood concerns and goals to which Park Nicollet Methodist Hospital has responded. Park Nicollet documented the neighborhood’s concerns and the proposed resolutions in an “Issues and Resolution List” that is attached for your review. Agenda Item No. 3A Methodist Hospital PUD Major Amendment Page 2 Meeting Date: February 4, 2015 BACKGROUND: In 2003, Park Nicollet prepared a General Development Plan for the Methodist Hospital campus that described short-term and long-term plans for expansion. Park Nicollet worked closely with Brooklawns neighborhood representatives to arrive at this plan. The City approved the General Development Plan Phase II (longer-term) improvements in concept only. This project advances another portion of Phase II improvements and requires a PUD Major Amendment. The City completed an Environmental Assessment Worksheet (EAW) in 2003, which analyzed a future total hospital building area of 1,235,927 square feet based on the proposed General Development Plan. The current building area is 1,039,000 square feet. The proposed addition would add 58,869 square feet for a total of 1,097,869 square feet. The total campus building area is still below the area analyzed in the EAW. The locations of the currently proposed vertical building expansions were shown in the General Development Plan. EXISTING CONDITIONS: Existing Conditions Data Zoning R-C High Density Multi-Family Residential, Floodway and Flood Fringe Comprehensive Plan Office PUD Size 38.1 Acres Current Use Hospital/Clinic Gross Building Area 1,039,000 square feet Building Height 8 stories (existing hospital building only) Floor Area Ratio (F.A.R.) 0.63 Ground Floor Area Ratio (G.F.A.R.) 0.11 Parking (Automobile) 3,139 stalls (2,531 on-site, 608 off-site) Agenda Item No. 3A Methodist Hospital PUD Major Amendment Page 3 Meeting Date: February 4, 2015 FLOODPLAIN: Federal Emergency Management Agency (FEMA) issued a Letter of Map Revision (LOMR) that became effective on September 28, 2007 that established the predicted 100-year flood elevation in the Methodist Hospital Campus area at an elevation of 890. A small portion of the west addition will encroach upon the 100-year floodplain. The use of the floor area within the floodplain will be a stairway and storage. The building will be constructed of flood resistant materials. Based on these factors, the encroachment is allowed, provided compensatory storage is provided for any loss in flood storage capacity. There will be 77 cubic yards of fill in the floodplain and 122 cubic yards of excavation near the truck loading docks. Staff finds the required compensatory storage will be provided. ZONING ANALYSIS: The proposed addition to the west side of the building meets all the requirements of the Zoning Code. A PUD modification for the building height is needed for a portion of the east tower addition; otherwise, it meets the Zoning Code requirements. The modification will be discussed in the building height section below. In 2003, the City granted a PUD modification for the existing eight-story hospital building. Compliance Table Factor RC District Requirement Allowed by PUD Proposed Met? Use Hospital/Clinic Hospital/Clinic Hospital/Clinic Yes Lot Area 15,000 sq. ft. n/a 38.1 acres Yes Height 6 stories or 75 ft. tall; except within 100 feet of R-1, R-2 or R- 3 districts hospital buildings are limited to 45 ft. tall No maximum The west surgery addition is 45 ft. tall. The east patient room addition is 71.96 ft. to roof deck & 80.01 ft. (el. 985.11) to tallest parapet walls. A PUD modification is required. Yes, with PUD mod. Building Materials 60% Class I materials on each building elevation 60% Class I materials, including brick & glass Yes Off-Street Parking 2,662 stalls with 10% transit reduction 15% reduction allowed 3,139 stalls (On-site 2,531; Off-site 608) Yes Setbacks – Front/Rear Front/South: 30 ft. No yard required Front/South: 35 ft. Yes Rear/North: 25 ft. No yard required Rear/North: 40 ft. Setbacks – Side/Side Side/West: 20 ft. No yard required Side/West: 458 ft. Side/East: 60 ft. No yard required Side/East: 93 ft. Floor Area Ratio 1.20 Limited by height, GFAR 0.66 Yes Ground Floor Area Ratio 0.25 0.30 0.11 Yes Agenda Item No. 3A Methodist Hospital PUD Major Amendment Page 4 Meeting Date: February 4, 2015 Architectural Design: The height, massing, roof treatment, proportions and architectural character of the Cancer Center are contextual and complementary with the existing hospital. There are brick and glass elements that match the existing building. The plans introduce more prefinished metal materials on the building walls than has been previously included on the existing building. Although, the hospital has previously included prefinished metal as an accent material near the building main entrances as either siding or in the canopies. The exterior materials on the building addition include brick, glass and pre-finished metal. The building meets the minimum Class I materials requirement. Building Height The proposed west surgery addition is approximately 45 feet tall and meets the code requirements. The height regulations for the east side of the building are a bit more complex. A portion of the building will require a PUD modification related to building height in order to proceed. The east building addition proposes to add two levels to the existing building (Floors 5 and 6). The roof of the building will be 71.96 feet (el. 977.1) tall. There are parapet walls that will rise between 2.7 feet and 7.75 feet higher than the roof deck. In the RC zoning district, the maximum height is generally 75 feet with some allowances for parapet walls and elevator penthouses and the like to be taller than 75 feet. However, hospital buildings are limited to 45 feet tall within 100 feet of R-1, R-2 or R-3 districts. The existing hospital is 93 feet from the R-2 district to the east. The code promotes “stepping back” the upper portions of the building that are taller than 45 feet. In this case, approximately 7 feet farther back from the existing building wall. Park Nicollet noted during the neighborhood meetings and subsequent application materials the following points: • The original 1978 building was designed to allow expansions up to 8 stories (matching the height of the existing central hospital tower. • The 2003 General Development Plan contemplated vertical expansion in this location, and received conceptual support from the neighborhood and City of St. Louis Park. • There are structural engineering limitations to stepping the building addition back seven feet or more on the east side. • Stepping the building addition back seven feet would also cause practical difficulties in the layout of the planned patient rooms and cause ongoing operations (nursing/staffing) inefficiencies of those areas. • The taller parapet walls would better screen some of the mechanical equipment that will be located on top of the roof from off-site. • The architect evaluated the shadowing impacts of the proposed addition on the neighboring residential properties. With computer modeling they were able to attribute some additional shadowing on the back yards of the some of the residential lots, but the exhibits also indicated the shadowing would be almost imperceptible in comparison to the shadows from the existing 8-story tower. The shadows produced by the hospital building, existing and proposed; does not violate the zoning code shadowing regulations. Agenda Item No. 3A Methodist Hospital PUD Major Amendment Page 5 Meeting Date: February 4, 2015 Staff would add the following three points when considering the merits of this modification request: • The PUD ordinance allows for modification of the height restrictions in the ordinance. • Based on the floor area proposed in the 2003 EAW for the vertical expansions, the proposed floor area for the two additional floors on the east tower seem consistent with the General Development Plan. • The PUD ordinance includes broad protections for neighboring residential properties that are less restrictive than the RC zoning district limitation for hospitals. The PUD ordinance requires buildings to be set back from the property line a distance equal to its height. The building would still be farther from the residential district than the proposed height. Also of note, there will be an elevator penthouse and mechanical equipment that rise to total heights of 92.8 feet (el. 994.3) and 84 feet (el. 989.1) respectively. These are within the maximum 100 feet height allowed by the zoning code and not within 100 feet of the residential properties. Landscaping Revised landscaping plans for the east side of the site were recently approved by the City Council as a minor amendment to the PUD. No additional plantings are required as part of this project. Over the next four years the landscaping along the east side of the building will be disturbed by either this construction, or due to Xcel Energy landscaping restrictions under its overhead high voltage power lines. The landscaping will be replaced with suitable plantings within four years in compliance with the recently approved landscaping plan. Landscaping plans are not included in the exhibits. Drainage, Grading and Utilities The sanitary sewer, storm sewer, and water mains are adequate to serve the facility and the proposed additions. Wetlands and water quality are governed by the Minnehaha Creek Watershed District (MCWD). The applicant shall meet MCWD permitting requirements. Lighting The proposed photometric plan meets City Code requirements. In addition, to the City’s regulations for exterior lighting, the architect has tried to address the neighbors’ questions and concerns about lighting impacts from inside the building and shared a light study exhibit with the neighborhood representatives. The City Code does not address this issue directly. RECOMMENDATION: Staff recommends approval of the Planned Unit Development Major Amendment, including the modification for the height of the east tower addition from 45 feet to 80 feet tall, for the Methodist Hospital Campus at 6500 Excelsior Boulevard, subject to the following conditions: 1. All previously approved PUD conditions for the Methodist Hospital Campus shall continue. 2. Prior to any site work, the applicant shall meet the following requirements: a. Applicant and owner must sign Assent Form and Official Exhibits. Agenda Item No. 3A Methodist Hospital PUD Major Amendment Page 6 Meeting Date: February 4, 2015 b. The applicant shall provide a copy of the Minnehaha Creek Watershed District permit to the City of St. Louis Park. c. Any other necessary permits from other agencies shall be obtained (i.e. Hennepin County, Minnesota Pollution Control Agency, Minnesota Department of Natural Resources, etc.). d. Obtain the required Erosion Control, Right-of-way, Utility and other permits required by the City, which may impose additional conditions. e. A preconstruction conference shall be held with the appropriate development, construction, city and other agency representatives. f. The applicant shall submit a financial guarantee in the form of cash escrow or letter of credit in the amount of 125% of the costs of public infrastructure, exterior lighting, site restoration, and landscaping improvements. 3. Prior to the issuance of any building permits, the applicant shall meet the following conditions: a. Submit building materials and samples to the City of St. Louis Park for review and approval. 4. The developer shall comply with the following conditions during construction: a. All City noise ordinances shall be complied with, including that there be no construction activity between the hours of 10 p.m. and 7 a.m. weekdays, and 10 p.m. and 9 a.m. on weekends and holidays. b. Loud equipment shall be kept as far as possible from residences at all times. c. The site shall be kept free of dust and debris that could blow onto neighboring properties. d. Public streets shall be maintained free of dirt and shall be cleaned as necessary. e. Construction workers vehicle parking shall be on remoate parking lot away from single family residential areas, and on-street parking by construction workers in surrounding neighborhoods shall be discouraged and managed closely by the on- site job supervisor and property owner. f. The Zoning Administrator may impose additional conditions if it becomes necessary in order to mitigate the impact of construction on surrounding properties. 5. Approval of a Building Permit, which may impose additional requirements. 6. The site shall be developed, used and maintained in accordance with the Official Exhibits. 7. The developer or owner shall pay an administrative fee of $750 per violation of any condition of this approval. Attachments:  General Development Plan (GD.1)  General Staging Plan (GD.2)  West Surgery Addition Exhibits o Civil Site Plan (220.CS) o Compensatory Storage Exhibit o Ground Level Zone 1 Core & Shell Plan (400.1EX) o First Level Zone 1 Core & Shell Plan (401.1EX) o Second Level Zone 1 Core & Shell Plan (402.1EX) o Methodist Surgery Model - Northwest View (WT 1.0) o Methodist Surgery Model – Southwest View (WT 2.0) Agenda Item No. 3A Methodist Hospital PUD Major Amendment Page 7 Meeting Date: February 4, 2015 o Methodist Surgery Model – View from West (WT 3.0) o Methodist Surgery Model – Northwest Aerial View (WT 4.0)  East Patient Rm. Addition Exhibits o Location Plan (ET 7.0) o Fifth Floor East Tower Floor Plan (105) o Sixth Floor East Tower (106) o Roof Plan (107) o West Aerial View of Overall Campus (ET 1.0) o West Aerial View (ET 1.1) o Northwest Aerial View (ET 2.0) o Two-Level Vertical Expansion (ET 3.0) o South Elevation of Vertical Expansion (ET 4.0) o East Elevation of Vertical Expansion (ET 5.0) o East Tower Elevation – Night View (ET 5.1) o North Elevation of Vertical Expansion (ET 6.0) o Construction Staging (SL.1, SL.2, SL.3, SL.4)  Link Addition Exhibit o Methodist Surgery Model – North Entry View (NE 1.0)  Issues and Resolutions List dated 01/28/2015  Sustainability Highlights Prepared by: Sean Walther, Senior Planner www.aecom.comPROJECTCLIENTARCHITECT6500 EXCELSIOR BOULEVARDSAINT LOUIS PARK, MN 55426952.993.5000 telwww.parknicollet.comISSUE/REVISIONKEY PLANSHEET NUMBERSHEET TITLEPROJECT NUMBER Last Plotted:Filename:Printed on ___% Post-ConsumerRecycled Content PaperARCH E1 30" x 42"Project Management Initials:Designer:Checked:Approved:123456ABCDE654321800 LaSalle Avenue612.376.2000 tel 612.376.2271 faxMinneapolis, Minnesota 55402SHADEDPORTIONDENOTES AREAOF PLANMATCHLINENWESTEAST BACDEFGMM/dd/yyyy hh:mm:ss AMC:\Users\guntherk\Documents\PNHS Patient Room Modernization 2014.rvt St. Louis Park, MN 554266500 Excelsior Blvd.PARK NICOLLET METHODIST HOSPITAL60329244CheckerDesigner Approver AECOM TECHNICAL SERVICES, INC.I/R DATEDESCRIPTIONNOTES:1. EXCELSIOR BOULEVARD ENTRY -MODIFIED IN PHASE ONE OF THE PUD.NO CHANGE - COMPLETED PREVIOUSLY2. LOUISIANA AVENUE ENTRY SIGNAGE ANDLANDSCAPE TO BE MODIFIED FOR ENHANCEDVISIBILITY AS A PRIMARYENTRY TO THE METHODIST HOSPITAL CAMPUS.NO CHANGE - COMPLETED PREVIOUSLY3. MINNEHAHA CREEKRE-MEANDERIG A JOINT VENTURE BETWEENMINNEHAHA CREEK WATERSHED DISTRICT ANDPARK NICOLLET.NO CHANGE - COMPLETED PREVIOUSLY4. WETLAND BOARDWALKA JOINT VENTURE BETWEEN MINNEHAHACREEK WATERSHED DISTRICT ANDPARK NICOLLET.NO CHANGE - COMPLETED PREVIOUSLY5. CANCER CENTER VERTICAL EXPANSIONWITH 2 ADDITIONAL FLOORS AT 20,000 SF/FLOORENTIRE BUILDING WILL BE 117,000 SF +/-.NO CHANGE - COMPLETED PREVIOUSLY6. BUS STOP LOCATION FOR NORTH ANDSOUTH ROUTES.NO CHANGE - COMPLETED PREVIOUSLY7. BUFFERYARD A BETWEEN NEIGHBORHOODAND PARKING RAMP.NO CHANGE - COMPLETED PREVIOUSLY8. EXISTING BUFFERYARD ALONG PROPERTY LINE.NO CHANGE - COMPLETED PREVIOUSLY9. ACCESS CONTROL FENCE TO MATCHNEIGHBORHOOD SCREEN FENCE.NO CHANGE - COMPLETED PREVIOUSLY10. EXISTING HELIPAD LOCATION.NO CHANGE - COMPLETED PREVIOUSLY11. EXISTING 8 STORY HOSPITAL TOWER - NO CHANGE.12. PROPOSED 1-STORY VERTICAL EXPANSIONABOVE EXISTING ROOF AT SECOND FLOOR LEVEL.NEW OCCUPIABLE SPACE AT LEVEL 2.13. PROPOSED 2-STORY VERTICAL EXPANSION ABOVEEXISTING ROOF AT FIFTH FLOOR LEVEL.NEW OCCUPIABLE SPACE AT LEVELS 5 AND 6.PUD AMENDMENTGENERAL DEVELOPMENT PLANGD.1PUD AMENDMENT SUBMITTALPATIENT ROOM MODERNIZATION AND SURGERY EXPANSION / RENOVATIONPARK NICOLLET METHODIST HOSPITALST LOUIS PARK, MNDECEMBER 18, 2014JANUARY 28, 2015 REV.1LIST OF DRAWINGS:GD.1: COVER SHEET AND GENERAL DEVELOPMENT PLANGD.2: GENERAL STAGING PLANSP.1: EXISTING CAMPUS SITE PLANSP.2: (NOT RE-ISSUED- REPLACED BY SHEETS 200.EX, 210.SD, 220.CS, 230.CG AND 250.CD)SP.3: PARTIAL SITE LIGHTING PLAN - WEST SIDE200.EX: EXISTING CONDITIONS210.SD: SITE DEMOLITION PLANS220.CS: CIVIL SITE PLAN230.CG: GRADING, DRAINAGE & EROSION CONTROL PLAN250.CD: CIVIL DETAILSEXHIBIT: COMPENSATORY STORAGEL0.1: EASEMENT AREA LANDSCAPING TITLE SHEET (EXISTING NO CHANGE)L1.2: EASEMENT AREA LANDSCAPING REMOVALS (EXISTING NO CHANGE)L2.1: EASEMENT AREA LANDSCAPING PLAN (EXISTING NO CHANGE)L3.1: EASEMENT AREA LANDSCAPING DETAILS (EXISTING NO CHANGE)105: FIFTH FLOOR PLAN-EAST TOWER (PATIENT ROOM MODERNIZATION)106: SIXTH FLOOR PLAN-EAST TOWER (PATIENT ROOM MODERNIZATION)107: ROOF PLAN-EAST TOWER (PATIENT ROOM MODERNIZATION)400.1 GROUND FLOOR PLAN (SURGERY EXPANSION/RENOVATION)401.1: FIRST FLOOR PLAN (SURGERY EXPANSION/RENOVATION)402.1: SECOND FLOOR PLAN (SURGERY EXPANSION/RENOVATION)ET1.0: WEST AERIAL VIEW OVERALL CAMPUS (PATIENT ROOM MODERNIZATION)ET1.1: WEST AERIAL VIEW OPTION 1 (PATIENT ROOM MODERNIZATION)ET2.0: NORTHWEST AERIAL VIEW (PATIENT ROOM MODERNIZATION)ET3.0: TWO LEVEL VERTICAL EXPANSION(PATIENT ROOM MODERNIZATION)ET4.0: SOUTH ELEVATION VERTICAL EXPANSION (PATIENT ROOM MODERNIZATION)ET5.0: EAST ELEVATION VERTICAL EXPANSION (PATIENT ROOM MODERNIZATION)ET5.1: EAST ELEVATION NIGHT VIEW (PATIENT ROOM MODERNIZATION)ET6.0: NORTH ELEVATION VERTICAL EXPANSION (PATIENT ROOM MODERNIZATION)ET7.0: EAST TOWER LOCATION PLAN(PATIENT ROOM MODERNIZATION)ET7.1: EAST TOWER SOUTH ELEVATION (PATIENT ROOM MODERNIZATION)ET7.1A: SOUTH ELEVATION MATERIALS (PATIENT ROOM MODERNIZATION)ET7.2: EAST TOWER EAST ELEVATION (PATIENT ROOM MODERNIZATION)ET7.2A: EAST ELEVATION MATERIALS (PATIENT ROOM MODERNIZATION)ET7.3: EAST TOWER NORTH ELEVATION (PATIENT ROOM MODERNIZATION)ET.3A: NORTH ELEVATION MATERIALS (PATIENT ROOM MODERNIZATION)WT1.0: NORTHWEST VIEW (SURGERY EXPANSION/RENOVATION)WT2.0: SOUTHWEST VIEW (SURGERY EXPANSION/RENOVATION)WT3.0: VIEW FROM WEST (SURGERY EXPANSION/RENOVATION)WT4.0: NORTHWEST AERIAL VIEW (SURGERY EXPANSION/RENOVATION)WT5.0: EXTERIOR MATERIALS (SURGERY EXPANSION/RENOVATION)NE.1.0: NORTH ENTRY VIEW (LINK ADDITION AT SECOND FLOOR)SL.1: VIEW OF CONSTRUCTION SITE LOGISTICSSL.2: VIEW OF CONSTRUCTION SITE LOGISTICSSL.3: VIEW OF CONSTRUCTION SITE LOGISTICSSL.4: VIEW OF CONSTRUCTION SITE LOGISTICS12/18/2014PATIENT ROOMMODERNIZATION ANDSURGERY EXPANSION /RENOVATIONPUD AMENDMENT REV 101/28/2015111213 www.aecom.comPROJECTCLIENTARCHITECT6500 EXCELSIOR BOULEVARDSAINT LOUIS PARK, MN 55426952.993.5000 telwww.parknicollet.comISSUE/REVISIONKEY PLANSHEET NUMBERSHEET TITLEPROJECT NUMBER Last Plotted:Filename:Printed on ___% Post-ConsumerRecycled Content PaperARCH E1 30" x 42"Project Management Initials:Designer:Checked:Approved:123456ABCDE654321800 LaSalle Avenue612.376.2000 tel 612.376.2271 faxMinneapolis, Minnesota 55402SHADEDPORTIONDENOTES AREAOF PLANMATCHLINENWESTEAST BACDEFGMM/dd/yyyy hh:mm:ss AMC:\Users\guntherk\Documents\PNHS Patient Room Modernization 2014.rvt PATIENT ROOMSt. Louis Park, MN 55426MODERNIZATION ANDSURGERY EXPANSION /RENOVATION6500 Excelsior Blvd.PARK NICOLLET METHODIST HOSPITAL60329244CheckerDesigner Approver AECOM TECHNICAL SERVICES, INC.I/R DATEDESCRIPTIONPUD AMENDMENTGENERAL STAGING PLANGD.212/18/2014 20.0' 20.0' 27.5' 18.0' 9.0' 5.0' CONCRETE BOLLARD (TYP.) RETAINING WALL W/ RAILING (SEE STRUCTURAL) B612 CONCRETE CURB & GUTTER (SEE DETAIL) CONCRETE SIDEWALK (TYP., SEE DETAIL) REPLACE PARKING LOT STRIPING W/ PROPOSED LAYOUT CONCRETE PAVEMENT (TYP.) BITUMINOUS PAVEMENT (TYP.) 3' CURB TAPER FLAT CURB (SEE DETAIL) B612 CONCRETE CURB & GUTTER (SEE DETAIL) 10' CURB TAPER COORDINATE W/ PARK NICOLLET SECURITY FOR SIGN LOCATION & TYPE (TYP.) PROPOSED HANDICAP STALL (SEE DETAIL) CONCRETE PAVEMENT (TYP., SEE DETAIL) 8.0' PROPOSED SCREENING FENCE (SEE ARCHITECTURAL) REPLACE EXISTING BITUMINOUS PAVEMENT, CONCRETE RETAINING WALL & CONCRETE PAVEMENT AS NEEDED FOR BUILDING FOUNDATION CONSTRUCTION R20.0' R3.0' CONCRETE STAIRS 5 RISERS @ 0.5' W/ 12" TREAD LENGTH (SEE ARCHITECTURAL) 40.0' 33.6' 40.0' 9.0' 18.0' CONCRETE WHEEL STOP (TYP.) A B C D E F G H 1 2 3 4 5 6 7 H G F E D 7654321 Copyright BWBRDateItem Sheet No. Sheet Title Comm. No.Drawn This Sheet may be a Reduced Copy. The bar above is 1" long on a Full Size Sheet. Drawing Scales apply to Full Size Sheets.NOT FORCONSTRUCTIONThis document may be an electronic file or may be printed from an electronic file provided to the user. It is the sole responsibility of the user to ensure that the content and quality is consistent with the content and quality of the paper documents on file at BWBR. C B A Issued For 651.222.3701 Saint Paul, MN 55102 380 St. Peter Street, Ste. 600 bwbr.com METHODIST HOSPITAL SURGERY SHELL EXPANSION 12/15/2014 3:59:05 PMTDG3.2014145.00 KEYPLAN ZONE 2 ZONE 1 ZONE 3 ZONE 4 ZONE 5 ZONE 6 PUD SUBMITTAL 12/18/2014 Name Date Reg. No. of the State of Minnesota. I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly Licensed Professional Engineer under the laws 01/28/2015 Jonathan J. Donovan - PE 44613 Minneapolis, Minnesota 55369 7200 Hemlock Lane - Suite 300 Landscape Architecture Environmental Planning Civil Engineering Land Surveying www.LoucksAssociates.com Fax: (763)424-5822 Telephone: (763)424-5505 DD PACKAGE 01/19/2015 PUD RESUBMITTAL 01/28/2015 CIVIL SITE PLAN 220.CS N WARNING: THE CONTRACTOR SHALL BE RESPONSIBLE FOR CALLING FOR LOCATIONS OF ALL EXISTING UTILITIES. THEY SHALL COOPERATE WITH ALL UTILITY COMPANIES IN MAINTAINING THEIR SERVICE AND / OR RELOCATION OF LINES. THE CONTRACTOR SHALL CONTACT GOPHER STATE ONE CALL AT 651-454-0002 AT LEAST 48 HOURS IN ADVANCE FOR THE LOCATIONS OF ALL UNDERGROUND WIRES, CABLES, CONDUITS, PIPES, MANHOLES, VALVES OR OTHER BURIED STRUCTURES BEFORE DIGGING. THE CONTRACTOR SHALL REPAIR OR REPLACE THE ABOVE WHEN DAMAGED DURING CONSTRUCTION AT NO COST TO THE OWNER. BITUMINOUS PAVEMENT PAVEMENT TYPES CONCRETE SIDEWALK CONCRETE PAVEMENT DISTURBED AREA:0.26 AC EXISTING IMPERVIOUS AREA: 0.26 AC (100%) PROPOSED IMPERVIOUS AREA: 0.26 AC (100%) SITE DATA SITE NOTES 1. ALL PAVING, CONCRETE CURB, GUTTER AND SIDEWALK SHALL BE FURNISHED AND INSTALLED IN ACCORDANCE WITH THE DETAILS SHOWN PER THE DETAIL SHEET(S) AND STATE/LOCAL JURISDICTION REQUIREMENTS. 2. ACCESSIBLE PARKING AND ACCESSIBLE ROUTES SHALL BE PROVIDED PER CURRENT ADA STANDARDS AND LOCAL/STATE REQUIREMENTS. 3. ALL CURB DIMENSIONS SHOWN ARE TO THE FACE OF CURB UNLESS OTHERWISE NOTED. 4. ALL BUILDING DIMENSIONS ARE TO THE OUTSIDE FACE OF WALL UNLESS OTHERWISE NOTED. 5. TYPICAL FULL SIZED PARKING STALL IS 9' X 18' UNLESS OTHERWISE NOTED. 6. ALL CURB RADII SHALL BE 5.0' UNLESS OTHERWISE NOTED. 7. BITUMINOUS IMPREGNATED FIBER BOARD TO BE PLACED AT FULL DEPTH OF CONCRETE ADJACENT TO EXISTING STRUCTURES AND BEHIND CURB ADJACENT TO DRIVEWAYS AND SIDEWALKS. 8. SEE SITE ELECTRICAL PLAN FOR SITE LIGHTING. (('# (('# (($# ((## 87.10 FFE=891.10 2.0% 87.10 87.10 87.10 91.10 90.10 88.83 87.04 88.83 5.0% 5.0% 90.66 3.0% 89.01 89.00 5.0% 1.6% 2.3% 87.43 89.61 4.3%((%#(($((') TW-90.66 BW-87.58 TW-91.01 BW-87.04 TW-89.43 BW-88.83 89.03 ()"  ()") ()%&()'&())%) ! ) #%2.0%2.0%2.0% 87.04 92.60 88.92 ()#) 4.4% 90.4989.24 ('%4.8%87.4688.33 1.4%4.0%TW-91.10 BW-87.10 91.10 CUT - 122 C.Y. FILL - 77 C.Y. NET - 45 C.Y. (CUT) Landscape Architecture Environmental Planning Civil Engineering Land Surveying Sheet No.: Project No.: Sheet Title: Quality Control: Checked By: Project Lead:Drawn By: Review Date: Professional Signature: Submittal: by the Consultant. With the Consultant's approval, others Consultant from any & all responsibilities, claims, and liabilities. deletions and that party shall hold harmless and indemnify the at the full risk of that party making such revisions, additions or revisions, additions, or deletions to these CADD files shall be made files for information and reference only. All intentional or unintentional may be permitted to obtain copies of the CADD drawing or for completion of this project by others without written approval shall not be used on other projects, for additions to this project, for use solely with respect to this project. These CADD files are instruments of the Consultant professional services CADD files prepared by the Consultant for this project CADD Qualification: Professional Services: Project Name: Owner/Developer: Sheet Index: 7200 Hemlock Lane - Suite 300 Maple Grove, Minnesota 55369 Telephone: (763) 424-5505 www.LoucksAssociates.com NORTH EXHIBIT TDG TRG JJD 1-28-15 UPUPDFGHEJKM98765-784N1.N1-782-78S-78T-78U-78V-78W-78510P-785103C5103E2C1H5413H5411H5423-78R.1T.1W.93H542L.3ICONSTRUCTION LIMITSCONSTRUCTION LIMITS5F55026'-7"26'-9"18'-0"18'-0"23'-11"0.117'-3"73'-4"V.5W.813'-4"4'-0"30'-7 1/2"23'-5 1/2"2'-0"0.51.42.720'-2"21'-6"13'-0 1/2"12'-6"21'-3"21'-0"SALT TANKS -QUANTITY, SIZE, ANDLOCATION TO BEDETERMINEDG000DOCKG002STAIRG000AG000BG000CG001SHELL(FUTURE HOSPITAL SUPPORT)G-101MECHANICALG-221ELECG-219LOADINGDOCKG-600PLANTOPERATIONSWALL, SEE CIVILWALL, SEE CIVIL96'-0"STOOP, SEESTRUCTURALELEV = 99'- 11 1/2"NOTE: CIVIL DRAWINGS INDICATE GROUND FLOOR FFE = 891.10', WHICH EQUALS 100'-0" ON ARCHITECTURAL DRAWINGS400.4FL2D2E2.65.13.52.91'-11"12'-6"7'-4 1/2"2'-7"3'-11"7'-4 1/2"3'-4 1/2"4 1/2"13'-6 1/2"2'-3"6'-6"6'-0"6'-6"2'-3"2'-6"100'-0"100'-0"101'-6"ABCDEFGH1234567HGFED7654321Copyright BWBRI hereby certify that this plan, specification or report was preparedby me or under my direct supervision and that I am a dulyLicensed Architect under the laws of the State of Minnesota.NameDateReg. No.DateItemSheet No.Sheet TitleComm. No.DrawnThis Sheet may be aReduced Copy.The bar above is 1" long on a Full Size Sheet.Drawing Scales apply to Full Size Sheets.NOT FORCONSTRUCTIONThis document may be an electronic file or maybe printed from an electronic file provided tothe user. It is the sole responsibility of the userto ensure that the content and quality isconsistent with the content and quality of thepaper documents on file at BWBR.CBAIssued For651.222.3701Saint Paul, MN 55102380 St. Peter Street, Ste. 600bwbr.comMETHODISTHOSPITALSECOND FLOORSURGERYEXPANSION ANDREMODELING1/28/2015 11:14:40 AMDBWGROUND LEVEL ZONE 1 -CORE AND SHELL PLAN400.1EX3.2014145.0002/02/2015 1/8" = 1'-0"400.1EXvvGROUND LEVEL - CORE AND SHELL PLAN - ZONE 1KEYPLANZONE 2ZONE 1ZONE 3ZONE 4ZONE 5ZONE 6SD ISSUE11/18/2014DD ISSUE01/19/2015 24 x 5424 x 5424 x 7248/2448/2448/2448/2448/2448/24BF BFBFBC/42BC/42BC/42SB/60 BBFFF 60/25 CAEP/P 42/3027/3030/45/45/30BC/42BFBFBF 24x3624x3624x3624x3624x3624x3636x3636x3636x3636x3636x3636x3636x3636x3636x3636x3636x3636x3636x3636x3624x3024x3030x48 30x4830x4836x3636x3630x4830x4830x4824x3036x48 36x4836x48 36x4836x48 36x4824x3024x3030x3036x3636x3636x3636x3636x3636x3636x3636x3624x3624x3624x3624x3624x3624x3624x3636x3636x6036x6036x4836x3636x3636x3624x3024x30DNUPDFGHEJKM998765-784N1.N1-782-78S-78T-78U-78V-78W-785107.3P-785103C5103E2CP-793-78R.1T.1W.9L.3OPEN TO BELOWI6"INFILL FLOORWITH NEW SLAB2550526152640.50.1V.5W.8move tonearestmullionABCDEFGH1234567HGFED7654321Copyright BWBRI hereby certify that this plan, specification or report was preparedby me or under my direct supervision and that I am a dulyLicensed Architect under the laws of the State of Minnesota.NameDateReg. No.DateItemSheet No.Sheet TitleComm. No.DrawnThis Sheet may be aReduced Copy.The bar above is 1" long on a Full Size Sheet.Drawing Scales apply to Full Size Sheets.NOT FORCONSTRUCTIONThis document may be an electronic file or maybe printed from an electronic file provided tothe user. It is the sole responsibility of the userto ensure that the content and quality isconsistent with the content and quality of thepaper documents on file at BWBR.CBAIssued For651.222.3701Saint Paul, MN 55102380 St. Peter Street, Ste. 600bwbr.comMETHODISTHOSPITALSECOND FLOORSURGERYEXPANSION ANDREMODELING12/15/2014 4:20:56 PMDBWFIRST LEVEL ZONE 1 -CORE AND SHELL PLAN401.1EX3.2014145.00 1/8" = 1'-0"401.1EX1HFIRST LEVEL - CORE AND SHELL PLAN - ZONE 1KEYPLANZONE 2ZONE 1ZONE 3ZONE 4ZONE 5ZONE 6BP1 SD ISSUE11/18/2014 HYBRIDOREQUIPMENTCONTROLSTRETCHERSTRETCHERSTRETCHERSTRETCHERSTRETCHERSTRETCHERSTERILECORE(SHELL)(SHELL)PPEOR 1OR 2OR 3OR 4OR 8OR 7OR 6OR 5C-ARMANESTHCARTSSTOREQUIPSTAFFT910 11 1217 1615 149627 SF SUITEMATCH LINE B (2)FREESTANDINGCOAT RACKS40373626272829SSSSDNDFGHEJKM98765-784N1.N1-782-78S-78T-78U-78V-78W-78510P-78ZONE 6ZONE 1ZONE 6ZONE 2ZONE 2ZONE 4ZONE 1ZONE 3ZONE 2ZONE 1ZONE 4ZONE 3ZONE 2ZONE 1ZONE 6ZONE 15103C5103E5103H2CP-793-78R.1T.1W.9L.3I52618'-8"526419'-11 1/2"12'-6"9'-11"18'-0"52666 3/4"12'-5"0.50.1V.5W.812'-2 3/4"8'-6"12'-0 3/4"14'-10 1/2"18'-1 1/4"12'-0"14'-2 3/4"11'-5 3/8"12'-0 3/4"2'-6 1/2"2'-5 1/2"2'-0"18'-0"4'-8"ABCDEFGH1234567HGFED7654321Copyright BWBRI hereby certify that this plan, specification or report was preparedby me or under my direct supervision and that I am a dulyLicensed Architect under the laws of the State of Minnesota.NameDateReg. No.DateItemSheet No.Sheet TitleComm. No.DrawnThis Sheet may be aReduced Copy.The bar above is 1" long on a Full Size Sheet.Drawing Scales apply to Full Size Sheets.NOT FORCONSTRUCTIONThis document may be an electronic file or maybe printed from an electronic file provided tothe user. It is the sole responsibility of the userto ensure that the content and quality isconsistent with the content and quality of thepaper documents on file at BWBR.CBAIssued For651.222.3701Saint Paul, MN 55102380 St. Peter Street, Ste. 600bwbr.comMETHODISTHOSPITALSECOND FLOORSURGERYEXPANSION ANDREMODELING12/15/2014 4:24:04 PMDBWSECOND LEVEL ZONE 1 -CORE AND SHELL PLAN402.1EX3.2014145.00 1/8" = 1'-0"402.1EX1GSECOND LEVEL - CORE AND SHELL PLAN - ZONE 1KEYPLANZONE 2ZONE 1ZONE 3ZONE 4ZONE 5ZONE 6BP1 SD ISSUE11/18/2014 PARK NICOLLET HEALTH SERVICES | METHODIST SURGERY REMODEL DECEMBER 2014 | COMM. #3.2014145.00 NORTHWEST VIEW WT 1.0 PARK NICOLLET HEALTH SERVICES | METHODIST SURGERY REMODEL DECEMBER 2014 | COMM. #3.2014145.00 SOUTHWEST VIEW WT 2.0 PARK NICOLLET HEALTH SERVICES | METHODIST SURGERY REMODEL DECEMBER 2014 | COMM. #3.2014145.00 VIEW FROM WEST WT 3.0 PARK NICOLLET HEALTH SERVICES | METHODIST SURGERY REMODEL DECEMBER 2014 | COMM. #3.2014145.00 NORTHWEST AERIAL VIEW WT 4.0 H.61718.316.71819202125283023262916.415141353'-3"EHDFGJKMPR14151617181920212326293020.5EH2827252422CBwww.aecom.comPROJECTCLIENTARCHITECT6500 EXCELSIOR BOULEVARDSAINT LOUIS PARK, MN 55426952.993.5000 telwww.parknicollet.comISSUE/REVISIONKEY PLANSHEET NUMBERSHEET TITLEPROJECT NUMBER Last Plotted:Filename:Printed on ___% Post-ConsumerRecycled Content PaperARCH E1 30" x 42"Project Management Initials:Designer:Checked:Approved:123456ABCDE654321800 LaSalle Avenue612.376.2000 tel 612.376.2271 faxMinneapolis, Minnesota 55402MATCHLINENMM/dd/yyyy hh:mm:ss AMC:\Users\guntherk\Documents\PNHS Patient Room Modernization 2014.rvt St. Louis Park, MN 554266500 Excelsior Blvd.PARK NICOLLET METHODIST HOSPITAL60329244CheckerDesigner Approver AECOM TECHNICAL SERVICES, INC.I/R DATEDESCRIPTIONPUD AMENDMENTFIFTH FLOOR EAST TOWER10512/18/2014PATIENT ROOMMODERNIZATION 14151617181920212326293020.52827252422www.aecom.comPROJECTCLIENTARCHITECT6500 EXCELSIOR BOULEVARDSAINT LOUIS PARK, MN 55426952.993.5000 telwww.parknicollet.comISSUE/REVISIONKEY PLANSHEET NUMBERSHEET TITLEPROJECT NUMBER Last Plotted:Filename:Printed on ___% Post-ConsumerRecycled Content PaperARCH E1 30" x 42"Project Management Initials:Designer:Checked:Approved:123456ABCDE654321800 LaSalle Avenue612.376.2000 tel 612.376.2271 faxMinneapolis, Minnesota 55402MATCHLINENMM/dd/yyyy hh:mm:ss AMC:\Users\guntherk\Documents\PNHS Patient Room Modernization 2014.rvt St. Louis Park, MN 554266500 Excelsior Blvd.PARK NICOLLET METHODIST HOSPITAL60329244CheckerDesigner Approver AECOM TECHNICAL SERVICES, INC.I/R DATEDESCRIPTIONPUD AMENDMENTSIXTH FLOOR EAST TOWER10612/18/2014PATIENT ROOMMODERNIZATION 151617181920212326293020.5H.6D.9FGH.3www.aecom.comPROJECTCLIENTARCHITECT6500 EXCELSIOR BOULEVARDSAINT LOUIS PARK, MN 55426952.993.5000 telwww.parknicollet.comISSUE/REVISIONKEY PLANSHEET NUMBERSHEET TITLEPROJECT NUMBER Last Plotted:Filename:Printed on ___% Post-ConsumerRecycled Content PaperARCH E1 30" x 42"Project Management Initials:Designer:Checked:Approved:123456ABCDE654321800 LaSalle Avenue612.376.2000 tel 612.376.2271 faxMinneapolis, Minnesota 55402SHADEDPORTIONDENOTES AREAOF PLANMATCHLINENWESTEAST BACDEFGMM/dd/yyyy hh:mm:ss AMC:\Users\guntherk\Documents\PNHS Patient Room Modernization 2014.rvt St. Louis Park, MN 554266500 Excelsior Blvd.PARK NICOLLET METHODIST HOSPITAL60329244CheckerDesigner Approver AECOM TECHNICAL SERVICES, INC.I/R DATEDESCRIPTIONPUD AMENDMENTROOF PLAN10712/18/2014PATIENT ROOMMODERNIZATION Methodist Existing CampusWest Aerial View of Overall CampusIndicates the portion of the existing building to be expanded verticallyET 1.0 Vertical Expansion –Level 5 & 6 East TowerWest Aerial View –Option 1ET 1.1 East Tower ‐Existing CampusNorthwest Aerial ViewIndicates the portion of the existing building to be expanded verticallyExisting Exterior Wall to be demolished and replaced with CurtainwallExisting Exterior Wall to be demolished and replaced with CurtainwallElevator Penthouse wi;; be removed and rebuilt as part of this Vertical Expansion ProjectET 2.0 East Tower Vertical ExpansionTwo Level Vertical ExpansionNew Curtainwall over existing structureElevator PenthouseMechanical AHU –Painted to match metal panelCurtainwallCurtainwallNew Curtainwall over existing structureBrick Wall to match existing Brick Wall to match existing Insulated Metal PanelRibbon WindowET 3.0 South Elevation of Vertical ExpansionEast Tower Vertical ExpansionNew Curtainwall over existing structureElevator Penthouse –Metal Panel exterior finishExisting Building BelowExisting Building BelowCurtainwallBrick Wall to match existing Insulated Metal PanelRibbon WindowExisting Brick WallET 4.0 East Elevation of Vertical ExpansionEast Tower Vertical ExpansionNew Curtainwall over existing structureExisting Building BelowExisting Building BelowCurtainwallBrick Wall to match existing Insulated Metal PanelRibbon WindowExisting Emergency Drop‐OffExisting Brick WallET 5.0 East Tower Elevation –Night ViewEast Tower Vertical Expansion –Light StudyET 5.1 North Elevation of Vertical ExpansionEast Tower Vertical ExpansionNew Curtainwall over existing structureCurtainwallBrick Wall to match existing Insulated Metal PanelRibbon WindowExisting Emergency Drop‐OffExisting Brick WallElevator Penthouse –Metal Panel exterior finishET 6.0 SL.1 PUD Amendment 01/28/2015 SL. 2 PUD Amendment 01/28/2015 SL. 3 PUD Amendment 01/28/2015 SL. 4 PUD Amendment 01/28/2015 PARK NICOLLET HEALTH SERVICES | METHODIST SURGERY REMODEL DECEMBER 2014 | COMM. #3.2014145.00 NORTH ENTRY VIEW NE 1.0 LINK ADDITION Planning Commission Meeting Date: February 4, 2015 Agenda Item 3B 3B. Rezoning of Meadowbrook Golf Course Case No.: 15-01-Z Applicant: City of St. Louis Park Recommended Action: Chair to close public hearing. Motion to recommend approval of the rezoning of Meadowbrook Golf Course from R-1 Single-Family Residential District to Park and Open Space District (POS). Comprehensive Plan: Park and Open Space District Zoning: R1 – Single-Family Residential Site Area: 140.76 acres (6,131,505 square feet) Description of Request: The request is to rezone Meadowbrook Golf Course from R-1 Single Family Residential to Park and Open Space (POS), located at 201 Meadowbrook Road. This zoning change would make the property consistent with the City’s Comprehensive Plan and the current use of the property. Background: Meadowbrook Golf Course was established in 1926 and spans St. Louis Park, Edina, and Hopkins. St. Louis Park has two parcels that are located within the city limits that total 140.76 acres. Currently, both parcels are zoned R-1 Single-Family Residential. The majority of the land is located in the FEMA Floodplain and would be undevelopable. In 2006, the City adopted a Park and Open Space Zoning District (POS) to preserve City-owned parks, undevelopable land and areas with valuable environmental qualities as open space to ensure the continued health, safety and welfare of the community and to provide a location for recreational activities. City parks were rezoned POS at that time. Recently, the City began the process of rezoning publically-owned properties as well. Therefore, the City has proposed the rezoning of Meadowbrook Golf Course, owned by the Minneapolis Park and Recreation Board, from R-1 to POS to be more consistent with current uses of the property. Rezoning: As directed by the City Council, staff is beginning the process of rezoning the two parcels of Meadowbrook Golf Course that are located in the City of St. Louis Park to maintain consistency with Comprehensive Plan, which currently designates the land as a Parks and Open Space District. As specified in Section 36-151, golf courses are permitted uses within the Parks and Open Space District. Staff has been in contact with the Minneapolis Park and Recreation Board (MPRB) regarding the rezoning of Meadowbrook Golf Course. The MPRB supports the rezoning so long as the current use is not in violation of the POS District, and if the property ceases to be used as a golf course, other open space and recreational uses will be allowed on the property. Furthermore, the MPRB Agenda Item No 3B. Rezoning of Meadowbrook Golf Couse Page 2 Meeting Date: February 4, 2015 has stated that the proposed action is consistent with their future plans to improve and maintain the Meadowbrook Golf Course. Recommendation: Staff recommends approval of the proposed rezoning from R-1 Single-Family Residential District to Park and Open Space District to be consistent with the Comprehensive Plan. Attachments: Aerial Photo with Site Location Existing and Proposed Rezoning Map 2030 Comprehensive Plan Land Use Map Letter from Minneapolis Park and Recreation Board Prepared by: Alex Boyce, Community Development Intern Reviewed by: Meg McMonigal, Planning and Zoning Supervisor Site Locations Edina Hopkins Excelsior BlvdLouisianaAve ¯0 0.30.15 Miles Aerial Photo and Site Location Current Zoning Proposed Rezoning Zoning Districts C-1 Neighborhood Commercial C-2 General Commerical I-G General Industrial I-P Industrial park M-X Mixed Use O Office POS Park and Open Space R-1 Single-Family Residence R-2 Single-Family Residence R-3 Two-Family Residence R-4 High-Density Multiple-Family Residence R-C High-Density Mulitple-Family Residence 0 10.5 Miles ± Proposed Rezoning ofMeadowbrook Golf Coursefrom R-1 to POSMeadowbrook Golf Course Meadowbrook Golf Course Meadowbrook Lake Meadowbrook Lake City of Edina City of Edina HIGHWAY 7HIGHWAY 169INTERSTATE 394 MINNETONKA 36TH LAKE34TH 27THTEXASFLAG WALKER FRANCE41STFLORIDAGEORGIAYOSEMITEJERSEYOXFORD16TH 37TH KENTUCKYRHODE ISLAND35TH W O O D D A L E1ST 38TH LIB R A R Y ALABAMA39TH2ND CEDAR LAKEFORD AQUILAKIPLINGHIGHWAY 10028TH WAYZATA 31ST G O R H A M SHELARD CLUB BELT LINEINGLEWOOD23RDVERNONVIRGINIA BRUNSWICKUTICA26TH ZINRANZARTHAN25 1/2 PARK GLEN TOLEDOLYNNMELROSE32ND MARYLANDPARK PLACEIDAHOHUNTINGTON42ND EXCELSIOR 24TH SALEMNEVADA3 9 4 H O V BROOKSIDENORTH36 1/2 GLENHURSTWEBSTER22ND JOPPAFOREST DIVISION XENWOODDAKOTA40TH SB HWY100 S TO W B I 3 9 4 FRANKLIN EB I394 TO SB HWY100 S 29TH GOODRICH DUKEBROOKHAMILTON 25TH EDGEBROOKBOONE 18THMORNINGSIDE SUNSET SERVICE DR HIGHWAY 7ELIOT VIEW43 1/2 14TH NB HWY169 TO EB I394 MACKEYVALLACHER BASSWOODUTAH XYLONQ U E B E C M O N T E R E Y 44THRALEIGH30 1/2 YUKONLOUISIANA34 1/2CAVELL SUMTERJORDANBURDT A F T POWELLKILMER GAMBLE WESTMORELAND QUENTINCOOLIDGEVICTORIA DARTSTANLEN BR O W N L O W WB I394 TO NB HWY10 0 S COLORADOWOLFE SERVICEPENNSYLVANIA13TH OTTAWABROWNDALERIDGEHOSPITAL SERVICESB HWY169 S TO WB I394 32 1/2 33RDCEDARWOODNB HWY100 S TO EB I394RANDALLEDGEWOODNATCHEZWESTSIDE MEADOWBROOKOREGONHAMPSHIREPHILLIPSREP U B L I C MO N I T O R HILLPARKLANDSBLAKE13 1/2 VERMONTINDEPENDENCE WEST ENDPARKER SB HWY100 S TO EB I394 PARKWOODSPRINCETONPRIVATE DOUGLAS BLACKSTONEDECATURPARK CENTERGENERAL MILLSOA K L E A FHILLSBORO GL ENGETTYSBURGPARK COMMONS WOOD EB I394 TO SB HWY169 LANCA STER SB HWY169 S TO HWY7CAMBRIDGEWYOMING G R A N D 42 1/2 MINNEHAHA GENERAL M I L L S B L V D T O E B I 3 9 4 CEDAR PARKDALE HIGHWO O D CAMERATA DREWWB I394 TO SB HWY100 S WO O D L A N D SB HWY100 S TO PARKD DREB HWY7 TO SB HWY169ENSIGNEB I394 TO PARK PLACE BLVD S B R O O K V I EW EB I394 TO NB HWY100 S FAIRWAYWB I394 TO LOUISIANA AVE S FRONTAGEHWY7 TO NB HWY169 SOLD CEDAR LAKE PARK PLACE BLVD S TO WB I394LOUISIANA AVE S TO EB I394 RUNNYMEADE TEXA TONKA WB I394 TO SB HWY169 S NB HWY100 S TO CORD25NB HWY100 S TO 36TH ST WWESTWOOD HILLSTARGET SERVICEOAK PARK VIL L A G E SB HWY169 S TO 36TH ST WMINIKAHDAPARK NICOLLETSB HWY169 TO MINNETONKA BLVDDEVANEY ME R I D I A NWINNETKAFREDERICK CEDAR SHOREWESTRIDGE UTICA AVE S TO SB HWY100 SSUNSET RIDGEHOBARTRHODE ISLAND23RD JOPPACAVELLCEDAR LAKEUTICA13TH MONTEREY34THSUMTER EDGEWOODGETTYSBURG23RD WESTWOOD HILLSHAMPSHIRE26TH RHODE ISLANDLYNNWYOMINGOTTAWAZARTHAN28TH OREGONWEBSTER27THHILLSBORO QUENTININDEPENDENCE25TH S A L EM 22ND AQUILAALABAMADAKOTAVIRGINIAPRINCETONAQUILA37TH HIGHWAY 100SERVICE DR HIGHW A Y 7 CAMBRIDGE 33RDQUEBEC 23RD BOONEDAKOTAHAMPSHIREFLORIDAMEADOWBROOKDAKOTA39TH 29TH MONTEREYJORDANFLAG18TH 24TH PENNSYLVANIAN A T C H E Z 32ND WAYZATA IDAHO26TH HIGHWAY 100IDAHOUTAHSALEMPRIVATE31ST 33RD 23RD LYNNDECATURFRANKLIN QUENTIN23RD COLORADOSALEM24THWEBSTERQUENTINZARTHAN14TH PRIVATE29TH 28TH BLACKSTONER A L E IGHOREGON25 1/2PARK PLACE16TH 16TH LYNN32ND 26THDAKOTABRUNSWICK28TH 39TH SERVICE DR HI G H W A Y 7 27TH 27THBLACKSTONE VIRGINIABRUNSWICKNEVADABOONEVERNONBOONEWEBSTERSUMTER16TH PARK CENTER 22ND 31ST32NDQUEBEC29THRALEIGHALABAMA28THPENNSYLVANIA FRANCE16TH 18TH PENNSYLVANIACAVELL26TH WALKERGLENHURSTLOUISIANA SERVICE DR HIGHWAY 7BRUNSWICKQUEBECEDGEWOODSUMTER37TH PRINCETONBRUNSWICKQUEBEC18THCOLORADO36THBOONEGETTYSBURGVIRGINIAUTAH BROOKZINRANXENWOODFLORIDAJERSEY35THINDEPENDENCEZARTHAN 36TH YOSEMITEYUKONFRANKLIN AQ U I L A 22ND WEBSTERNATCHEZMONTEREYVIRGINIACOLORADO41ST 28TH JOPPAVIRGINIANEVADA31ST CAVELLWEBSTERFRANKLIN XYLONINGLEWOOD33RD 31S T 31ST 41ST PRINCETONHIGHWAY 169IDA H O XENWOOD37TH 35TH XENWOOD42NDKILMERYOSEMITE 43 1/2VIRGINIA GLENHURSTSALEMWYOMINGBLACKSTONEDECATUR14TH BOONEPRIVATE34TH EDGEWOODLAKEVERMONT42NDXYLONQUEBECOXFORD W O O D D A L EYUKONTEXASDAKOTA ALABAMA25TH ZARTHANR A L E I G HBRUNSWICKQUEBECXYLON29THCOLORADO LAKE CE D A R L A K E 24TH GLENHUR S T GE O R G I A INGLEWOODHIGHWAY 7 33RD PENNSYLVANIADAKOTAOREGONGEORGIAHUNTINGTONOTTAWA33RD 25TH PRINCETONXENWOODYOSEMITE35TH MARYLANDOREGONZARTHANFLAGUTICAUTICAQUEBEC32NDVIRGINIA EDGEWOODTOLEDO22ND 16TH OTTAWAGLENHURSTUTAHJOPPAGETTYSBURGP R IN C E TO NXYLON24THUTAH ME A D OW B R O O K 31ST 18TH PENNSYLVANIA31STFORD HIGHWAY 7 ALABAMANATCHEZNATCHEZHIGHWAY 10034TH 14TH 16TH 16TH TOLEDO36TH INTERSTATE 394 26TH OTTAWAFLAG YOSEMITEWAYZATA JOPPAWEBSTERKIPLING31ST RALEIGHKENTUCKYLand Use Categories RL - Low Density Residential RM - Medium Density ResidentialRH - High Density Residential MX - Mixed UseCOM - Commercial IND - Industrial OFC - Office BP - Business Park CIV - Civic PRK - Park and Open SpaceROW - Right of Way RRR - Railroad City of St. Louis ParkOfficial 2030 Comprehensive PlanLand Use Map Effective: December 2009Printed: December 29, 2011 Prepared by the City of St. Louis ParkCommunity Development Department1 in = 1,425 feet 2,500 Feet Planning Commission Meeting Date: February 4, 2015 Agenda Item 3C 3C. Comprehensive Plan Amendments – Planned Unit Developments Case No.: 14-32-CP Recommended Action: Chair to close public hearing. Motion to recommend approval of the Comprehensive Plan Amendments pertaining to Planned Unit Developments. REQUEST: The City recently revised the planned unit development (PUD) section of the Zoning Code, including the approval process, as well as other procedural, text and policy revisions. The changes allow the City Council more discretion and flexibility to approve PUDs. Similar amendments are needed in the Comprehensive Plan to accomplish the flexibility intended in the recent zoning ordinance amendments. Therefore, staff is requesting text amendments to the Comprehensive Plan to be consistent with the recently approved new PUD ordinance. The changes remove specific density limitations associated with the PUD process in the “Land Use Plan” and “Plan Implementation” chapters of the Comprehensive Plan to provide consistency with the removal of specific modifications in the new PUD zoning district. These changes apply to the RH – High Density Residential, C – Commercial, O – Office and MX – Mixed Use land use categories of the Comprehensive Plan. Detail of the revisions is attached to this report. The Council is tentatively scheduled to act on these proposed changes February 17, 2015. Recommendation: Staff recommends approval of the attached amendments to the Comprehensive Plan pertaining to Planned Unit Developments. Attachments: Draft Comprehensive Plan Text Amendments (Affected pages only) The complete Comprehensive Plan can be found at: http://www.stlouispark.org/comprehensive-plan.html Prepared by: Ryan Kelley, Associate Planner Reviewed by: Sean Walther, Senior Planner Meg McMonigal, Planning and Zoning Supervisor St. Louis Park, Minnesota Excerpt of Land Use Plan Chapter Where We Are Headed This section of the Land Use chapter establishes the City’s official land use categories and the 2030 Comprehensive Plan Land Use Map, which is intended to guide current and future land use planning and development through the year 2030. The land use plan categories are fully defined below. The 2030 map is the official land use designation map for the City. The land use designations are intended to shape the character, type and density of future development according to sound planning principles. Any new development, redevelopment, change in land use, or change in zoning is required to be consistent with the land use guiding for each parcel. Comprehensive Plan Land Use Categories There are 12 land use categories that guide the City’s 2030 Comprehensive Plan Land Use Map, which are described below. In general, the categories reflect a movement towards greater mixing of uses. I. RL - Low Density Residential The Low Density Residential category is intended primarily for single-family detached housing. This category allows net residential densities from three (3) to seven (7) units per acre. II. RM - Medium Density Residential The Medium Density Residential category allows net residential densities from six (6) to 30 units per acre. This category allows for a variety of housing types including single family detached, duplexes, townhomes, and small two- and three-story apartment buildings. III. RH - High Density Residential The High Density Residential land use category is intended for higher density, compact urban residential development, including high-rise apartment buildings. This category allows for a net residential density range of 20 to 75 50 units per acre;. however zoning will allow only up to 50 units per acre except hHigher densities may be achieved by utilizing the PUD process and addressing Livable Communities Principles and other goals of the Comprehensive Plan such as including structured parking, affordable housing, or incorporating sustainable site and building design elements. Under a PUD, 75 units per acre may be developed if within 1,000 feet of a park. The appropriate building height will vary by development and depend upon the characteristics of the development and its surroundings. Pedestrian-scale, three- to four-story buildings will be appropriate in some areas, while six- to eight-story buildings and even taller high-rises will be acceptable in others. In addition to residential development, a small proportion of supportive retail and service is also appropriate. Retail, service and office beyond those supporting the residential development would only be permitted as part of a mixed-use PUD. IV. C - Commercial The Commercial land use category is intended to accommodate a wide range and scale of commercial uses, such as retail, service, entertainment, and office. Commercial uses can range from small neighborhood convenience nodes, to community retail areas along major roadways, to large shopping centers, to auto-related commercial uses along freeways. Residential uses are also appropriate as part of a mixed-use commercial development, with a net residential density St. Louis Park, Minnesota range of 20 to 50 units per acre allowed. Higher densities may be achieved by utilizing the PUD process and addressing Livable Communities Principles and other goals of the Comprehensive Plan such as including structured parking, affordable housing, or incorporating sustainable site and building design elements. V. MX – Mixed-Use In the Mixed Use land use category, a mixing of uses including commercial is required for every development parcel. The goal of this category is to create pedestrian-scale mixed-use buildings, typically with a portion of retail, service or other commercial uses on the ground floor and residential or office uses on upper floors. Mixed use buildings typically have approximately 75 to 85 percent of the building for residential use and 20 to 25 percent for commercial or office uses. Taller buildings may be appropriate in some areas and net residential densities between 20 and 75 50 units per acre are allowed. Higher densities may be achieved by utilizing the PUD process and addressing Livable Communities Principles and other goals of the Comprehensive Plan such as including structured parking, affordable housing, or incorporating sustainable site and building design elements. The MX designation is intended to facilitate an integrated town center atmosphere in Park Commons and a diversity of uses in certain other areas of the community. VI. I - Industrial The Industrial land use category covers all industrial uses from manufacturing, assembly, processing, warehousing, storage, laboratory, distribution, and related offices. Industrial areas consist of both lighter industrial uses, which tend to have higher appearance standards and fewer impacts on surrounding properties, and general industrial uses which are typically set off from other uses. Current industrial uses tend to be concentrated around the City’s railroads, where industrial uses first developed in the community. Future industrial uses should primarily be located in close proximity to either a railroad line or regional roadway system with limited traffic circulation through residential and pedestrian oriented areas. VII. O - Office The Office land use category is primarily intended for employment centers of fairly intensive office and mixed use development with high floor area ratios (FARs) and building heights. Business, professional, administrative, scientific, technical, research, and development services are typical uses appropriate for the Office land use category. The Office category also allows other limited uses such as hotels, parking ramps, residential, day care, retail and restaurants when part of a larger development. VII. CIV-Civic The Civic land use category is intended for public buildings and uses as well as similar private uses, such as schools, government buildings, places of assembly, community centers, libraries, and non-profit institutions. I X. Plan Implement at ion Plan Implementation IX-A2 ComprehensivePlan Plan Implementat ion C omprehensive pla nning is a living process, as the community is continually changing and adapting. The Plan is continually used and updated to provide clear direction to city leaders. Implementation of the Plan is achieved in many ways and of ten in an incremental way. The Plan is intended as a guide for decisions to enable community growth and development over time. Comprehensive Plans are developed so that opportunities are recognized when they are consistent with physical conditions, economic opportunities, and the financia l capability of the city and the private sector. Implementation of specific items will be undertaken as an outcome of the current planning process. The Zoning and Subdivision Ordinances, the Capital Improvement Plan, and the Storm Water Management Plan are some of the method s to implement policies, plans, and programs contained in the Comprehensive Pla n. Changes to these documents are to be consistent with the provisions of the C omprehensive Pla n. Following is a list and explanation of identified changes the city will pursue as a result of this Pla n. Official Controls Zoning Code The Zoning Ordinance, Chapter 36 of City Code, establishe s regulations including land use, yard area, height, parking, tree preservation and architectural design. Associated with the Zoning Ordinance is the official zoning map. This map shows the different districts and their boundaries. St. Louis Park has eleven different zoning districts. The zoning district associated with a property can be found on the map; the standards for each district are located in the Zoning Ordinance. The table below identifies the City’s current zoning districts and allowable densities and lot sizes. It is expected the Zoning Ordinance and Zoning Map will be amended to carry out the intent of the new Business Park categories In the Land Use section to reflect the new categories and policies adopted as part of this Comprehensive Pla n. Zoning District Densit y (m a x) FA R Lot siz e minimum (sf ) Residential Res-PUD Non-residential R1 Single-family Residential 4.84 u/ac 9,000 R 2 Single-family Residential 6.05 u/ac 7,200 R 3 Two-family Residential 11 u/ac 7,200 R4 Multiple-family residential 30 u/ac 33 u/ac 8,000 RC High-density Residential 50 u/ac 55 u/ac 15,000 M X Mixed Use 75 u/ac 1.5 NA C1 Neighborhood Business 30 u/ac 33 u/ac 1.2 NA C1 General Commercial 50 u/ac 55 u/ac 2.0 NA O Office 75 u/ac 1.5 15,000 IP Industrial Park 0.5 15,000 IG General Industrial 1.0 5,000