Loading...
HomeMy WebLinkAbout97-51 - ADMIN Resolution - City Council - 1997/04/07RESOLUTION NO. 97 -51 RESOLUTION PERTAINING TO THE CONSTRUCTION OF A STORMWATER RETENTION/DETENTION POND IN WOLFE PARK WHEREAS, a stormwater retention/detention pond was originally included in the construction drawings and contract documents for the Rec Center Renaissance Project; and WHEREAS, the City Council has determined that the construction of said pond is to be incorporated into the overall reconstruction of Wolfe Park and is to be considered an integral component of that project and WHEREAS, the City Council has determined that construction of said pond is necessary to manage stormwater run-off from the Rec Center Renaissance Project and desirable as a physical amenity to Wolfe Park; and WHEREAS, the City Council has determined that it is in the best interest of the public to remove construction of said pond from the existing contract with DKH Excavating, Inc. and to solicit new bids for construction of said pond based on the redesign prepared by Close Landscape Architecture: NOW THEREFORE BE 11' RESOLVED by the City Council of the City of St. Louis Park that the City staff project architect and construction manager for the Rec Center Renaissance Project are hereby authorized to prepare all documents necessary to amend the existing contract with DKH Excavating, Inc. to delete construction of the project's stormwater retention/detention pond located south of the facility's main parking lot; AND BE IT FURTHER RESOLVED that the City Manager is authorized to execute a contract with Close Landscape Architecture for preparation of construction documents for the Wolfe Park retention/detention pond at a cost not to exceed $9,240, and that the City Manager is further authorized to solicit bids for the construction of said pond. Adop ed by the City Council on April 7, 1997 ATTEST: Mayor ity Clerk Reviewed for Administration City Manager