HomeMy WebLinkAbout96-38 - ADMIN Resolution - City Council - 1996/03/18RESOLUTION NO. 96-38
A RESOLUTION APPROVING A PRELIMINARY PLANNED UNIT DEVELOPMENT
(PUD) UNDER SECTION 14:6-7 OF THE ST. LOUIS PARK ORDINANCE CODE
RELATING TO ZONING FOR PROPERTY ZONED C-2, GENERAL COMMERCIAL
DISTRICT, LOCATED AT 1625 ZARTHAN AVENUE
WHEREAS, an application for approval of a Preliminary Planned Unit Development
(PUD) was received on October 16, 1995 from the applicant, and
WHEREAS, the application was formally accepted by staff as complete on November 27,
1995, and
WHEREAS, notice of a public hearing on the Preliminary PUD was mailed to all owners
of property within 350 feet of the subject property plus other property owners in the vicinity who
had expressed interest in this PUD, and
WHEREAS, the Planning Commission reviewed the Preliminary PUD concept at the
meeting of November 15, 1995, and
WHEREAS, notice of public hearing on the Preliminary PUD was published in the St.
Louis Park Sailor on November 22, 1995, and
WHEREAS, the Planning Commission opened the public hearing and took testimony at
the meeting of December 6, 1995 and continued the public hearing to December 20, 1995, and
WHEREAS, the Planning Commission continued the public hearing on December 20,
1995, and
WHEREAS, the Planning Commission recommended approval of the Preliminary PUD
subject to 22 conditions of approval on a 4-0 vote with all members present voting in the
affirmative, and
WHEREAS, the City Council discussed the Preliminary PUD at its January 8, 1996 Study
Session and provided direction to the applicant on revising the plans to address outstanding
issues, and
WHEREAS, the City Council at its January 16, 1996 meeting, deferred action on the
Preliminary PUD until its February 5, 1996 meeting because certain materials relating to plan
revisions had not been received in sufficient time to allow staff an opportunity for meaningful
review and to allow additional time to resolve outstanding issues, and
WHEREAS, revised Preliminary Planned Unit Development plans with significant
revisions were received on January 22, 1996 and February 6, 1996 and
WHEREAS, notice of an additional public hearing on the revised Preliminary PUD was
mailed to all owners of property within 350 feet of the subject property plus other affected
property owners in the vicinity and
WHEREAS, notice of the public hearing on the significantly revised Preliminary PUD Plan
was published in the St. Louis Park Sailor on February 7, 1996 , and
WHEREAS, the City Council opened the public hearing at the meeting of February 20,
1996, considered the staff reports, Planning Commission minutes and testimony of those
appearing at the public hearing or otherwise including comments in the record of decision.
BE IT RESOLVED BY the City Council of the City of St. Louis Park:
Findings
1. Ryan Construction Company has made application to the City Council for approval of a
Preliminary Planned Unit Development approval under Section 14:6-7 of the St. Louis Park
Ordinance Code within the C-2, General Commercial District located at 1625 Zarthan Avenue for
the legal description as follows, to -wit:
See Exhibit A - Legal Description
2. The City Council has considered the advise and recommendation cf the Planning Commission
(Case No. 95 -51 -PUD) and the effect of the proposed Preliminary Preliminary PUD on the health,
safety and welfare of the occupants of the surrounding lands, existing and anticipated traffic
conditions, the effect on values of properties in the surrounding area, the effect of the use on the
Comprehensive Plan, with specific consideration given to the Plan By Neighborhood Section of
the Comprehensive Plan, and compliance with the provisions of the Zoning Ordinance.
3. The City Council has determined that approval of a Preliminary PUD will not be detrimental to
the health, safety, or general welfare of the community nor with certain contemplated traffic
improvements will it cause serious traffic congestion nor hazards, nor will it seriously depreciate
surrounding property values. The Council has also determined that the proposed Preliminary
PUD is in harmony with the general provisions, purpose and intent of the Zoning Ordinance and
the Comprehensive Plan and that the requested modifications comply with the requirements of
Section 14:6-7.2(E).
4. The contents of Planning Case File 95 -51 -PUD are hereby entered into and made part of the
public hearing record and the record of decision for this case. •
2
Conclusioq
A Preliminary Planned Unit Development at the location described in paragraph 1 of the above
findings is approved based on the findings set forth above and subject to the following conditions:
1. Issuance of demolition and erosion control permits shall be subject to the following
conditions as required in the Environmental Assessment Worksheet (EAW) Resolution and
modified as follows:
a. Demolition, hauling and construction activities shall be limited to the hours
between 7:00 a.m. and 4:00 p.m. on weekdays and 9:00 a.m. and 4:00 p.m. on
weekends and holidays.
b. Trucks and construction equipment shall be prohibited from using Zarthan Avenue
between Cedar Lake Road and 16th Street and shall enter and exit the site from
16th Street and Park Place Boulevard only.
c. Demolition of the existing building shall begin at the eastern end and proceed west,
leaving the western wall of the building intact as a sound barrier for as long as
practicable.
d. Use of explosives shall be prohibited.
e. All demolition and construction equipment shall utilize state of the art muffler
systems.
f. On-site crushing and recycling operations shall be located as far from existing
residential land uses as practicable.
2. Approval of the Preliminary and Final Planned Unit Development and Plat shall be subject
to the developer meeting the following conditions as required in the EAW Resolution and
modified as follows:
- -. a. Installation of all roadway improvements associated with anticipated traffic from
the proposed use and dedication of public right-of-way to accommodate public
infrastructure .
b. Adjustments to existing traffic lights, street lights and other utilities.
c. Installation of sidewalks along the length of Cedar Lake Road, Park Place
Boulevard and 16th Street adjacent to the project and connecting to public plaza
areas within the site.
. d. - . Dedication of drainage and utility easements to a depth of 10 feet back from
planned right-of-way or 1 foot beyond required perimeter sidewalks, whichever is
greater.
e. Installation of on-site directional signs to I-394 and Highway 100 to prevent
unnecessary traffic in residential neighborhoods.
3
f. Delivery and garbage service trucks shall be prohibited from using Zarthan Avenue
between Cedar Lake Road and 16th Street and shall be limited to servicing the
uses between the hours of 7:00 a.m. and 10:00 p.m. on weekdays and 9:00 a.m.
and 10:00 p.m. on weekends and holidays. Unoccupied delivery and garbage
trucks shall be prohibited from idling on site during nighttime hours as defined by
Section 11-507(3)(a).
g. Overnight parking of vehicles, semi -trailers, refrigeration units and the like shall be
prohibited unless parked wholly within any of the enclosed loading dock bays.
h. Openings of rooftop fans and air circulation equipment shall be required to face
away from residential neighborhoods and all exhaust openings except bathroom
fans shall be prohibited on exterior walls facing residential neighborhoods. In the
event bathroom fan exhausts exceed the maximum nighttime allowable noise limits,
operation of these fans shall be terminated until compliance with the City of St.
Louis Park Noise Ordinance is achieved.
i An exterior lighting plan shall be required and shall ensure compliance with
ordinance provisions and prevention of unnecessary overnight site lighting.
j. Compliance with all applicable City ordinance provisions shall be required unless
alternatives are specifically approved as part of a Preliminary and Final Planned
Unit Development approval.
3. The following modifications to ordinance requirements are granted as part of the
Preliminary PUD approval:
a. Bufferyards are not required between drive through facilities and adjacent
properties that are part of the Preliminary PUD.
b. The temporary hoop structures associated with the outdoor sales area are not
required to be architecturally integrated with the principal building (utilize same
building materials) provided masonry walls surrounding the outdoor sales area are
provided as shown on the approved Preliminary PUD plans.
c. A Bufferyard "D" may be substituted for the required Bufferyard "F" between the
• truck circulation and loading areas for the Retail 2 building on Lot 5 and Park
Place Boulevard.
d. Buildings are not required to utilize at least 60% brick or other natural stone on
-each building face but are approved with percentages of brick ranging from 36% to
68% as shown on the approved Preliminary PUD plans.
e. Buildings on Lots 2 and 3 may have more than 5% bright, pure accent colors on
each facade and are approved with the percentages of accent colors shown on
colored elevations stamped as received by the City on March 15, 1996.
f. The area of all wall signs may -exceed 7% of the building wall area but may not
exceed the wall sign area shown on the approved Preliminary PUD plans.
g. Individual wall signs may exceed 150 square feet but may not exceed the individual
_ wall sign areas shown on the approved Preliminary PUD plans.
h. Two free standing off -premise signs (signs which advertise uses on other
-- properties) advertising uses on properties within the- approved Preliminary PUD
are allowed as shown on the approved Preliminary PUD plans.
4
i. The maximum size of the freestanding off -premise sign faces may exceed 300
square feet and may be 320 square feet each as shown on the approved Preliminary
PUD plans.
j. The maximum total sign area of the freestanding off -premise signs may exceed 400
square feet and may be 1,280 square feet as shown on the approved Preliminary
PUD plans.
k. Exterior lighting spillover may exceed 1.0 footcandle at property lines that abut
other properties within the PUD but may not exceed 1.0 footcandle at property
lines that abut properties that are not within the PUD.
1. The Bufferyard "D"s separating the in -vehicle sales and service uses (drive-
throughs) on Lots 4,5,6,7 and 8 of the Preliminary Plat from 16th Street and Park
Place Boulevard are not required to include a minimum of 95 plant units per 100
linear feet and may include a total of 225 fewer plant units than required as shown
on the approved Preliminary PUD plans.
m. Certain canopy trees may be installed at sizes less than 2-1/2" caliper as shown on
the approved Preliminary PUD plans and such trees shall be given full plant unit
credits.
n. Certain evergreen trees may be installed at sizes less than 6 feet (height) as shown
on the approved Preliminary PUD plans and such trees shall be given full plant unit
credits.
4. The site shall be developed, used and maintained in accordance with Exhibits C through T
- the Preliminary PUD plans which are subject to the following revisions and additions as
required for Final PUD consideration:
a. Additional permanent planting islands are required to break up large expanses of
parking and reduce uninterrupted rows of parking below the 400+ feet shown on
the Preliminary PUD plans.
b. The freestanding signs shown on the Preliminary PUD plans shall be revised to
include brick for the base, trim, and soldier cap of the proposed signs.
c. _ The proposed sidewalk along 16th Street shall be extended to meet the curb of
Zarthan Avenue.
d. The Final Plat shall include dedicated:public easements that extend to one foot
beyond the perimeter sidewalks and shall be consistent with the number of lots
shown on the Site Plan.
e. A Signage Plan for controlling internal PUD traffic and ensuring ng No Parking in
designated Fire Lanes as approved by the Fire Marshal shall be included in the
Final PUD plans.
f An Exterior Lighting Plan that meets the 1.0 footcandle maximum at the exterior
property lines and includes an overnight lighting plan shall be included in the Final
PUD plans.
g. The Final PUD Site Plan shall include modifications recommended by the City's
traffic consultant to mitigate potential on and off-site traffic conflicts.
h. The Final PUD Site Plan shall specify that internal circulation drives and
bufferyards surrounding the 110,000 square feet future phase shall be installed as
5
part of the first phase of construction and the remainder of the Phase II area shall
be seeded, watered and mowed until Phase II construction commences.
i. A fence intended to screen a customer pick-up area on the south side of the Home
Improvement building shall be eliminated from the Final PUD plans and screening
shall be accomplished with the landscaping and berm shown on the approved
Preliminary PUD plans..
j: The menu board for Restaurant 1 on Lot 4 shall be moved 10 feet to the north on
the Final PUD plans.
k. A total of 55 spaces shall be shown as proof of parking open space for Phase II in
the Final PUD plans and shall be set aside for a minimum of two years after Phase
II opens.
1. The Final PUD Grading Plan shall include berms that are a minimum of five feet in
height along Cedar Lake Road.
m. The Final PUD plans shall include details of all proposed trash enclosures and the
color of rooftop equipment.
n. Discrepancies in the Utility Plans regarding location of utility service stubs shall be
corrected in accordance with the City Engineer's comments and other revisions to
the Utility Plans as recommended by the City Plumbing Inspector shall be included
in the Final PUD plans.
o. The fire hydrant by Retail 4 on Lot 3 shall be located at least as far west as the
west end of the Retail 4 building on the Final PUD plans.
p. Discrepancies between the building plans and elevations as identified by the Zoning
Administrator shall be rectified in the Final PUD plans.
q: A Site Furniture Plan (locating benches, bike racks, trash receptacles, etc.) shall be
reviewed as part of the Final PUD plans.
r. A sidewalk is required along Zarthan Avenue and shall be shown on the Final PUD
plans.
s. Pursuant to Section 14:6-7.5(F) of the Zoning Ordinance, the City requires
a development agreement as a condition of approval of the Final PUD. The
development agreement shall address at a minimum:
i. Conditions of PUD approval as applicable or appropriate.
ii. Specifics relative to construction of the required off-site improvements in
attached (specified Exhibit B) timing of construction, and payment of
the improvements.
ili. Ongoing maintenance of the ponding basins and common areas.
iv. Future conversion of "proof of parking" areas.
v. Project construction phasing and future amendments to the P.U.D.
vi. Surety in the form of an irrevocable letter of credit for construction of on-
site improvements and replacement of plant materials.
6
1
1
r 1,1g0,11liA
vii. Other items as appropriate or necessary.
t. Evidence of financing for the first phase of construction, which includes all
improvements on Lots 2, 3, 4, 5, 6, 7, 8 and 9, circulation drives and bufferyards
on Lot 1, and all improvements on Outlots A, B and C.
u. Cost estimates for construction of all on-site improvements included in the first
phase of construction.
v. Prior to approval of the Final PUD, the developer shall reimburse the City for all
costs incurred by the City in connection with processing the applicant's
Preliminary PUD, and preparation of the development agreement including but not
limited to engineering fees, consultant fees, attorney fees, and staff time, as
provided by Section 14:8-5.0
5. The following additional conditions of preliminary approval shall be carried forward with
the Final PUD consideration:
a. The 225 plant units that are deficient from the Bufferyard "D"s along 16th and
Park Place Boulevard shall be donated to the City in the form of twenty 2-1/2"
canopy trees for use on nearby public lands.
b. The details of Phase II construction shall be reviewed as a minor amendment to
the approved Final PUD, unless additional off-site impacts are anticipated, in
which case, the details of Phase II shall be reviewed as a major amendment.
c. The developer and/or future property owner shall dedicate, at no expense to the
City, any right-of-way which may be required in the future to facilitate
improvements at the intersection of 16th Street and Zarthan Avenue and/or access
from Cedar Lake Road if deemed necessary by the City Council as a future
major amendment to the approved Final PUD Plans. Developer and/or future
property owner shall be responsible for the costs associated with these potential
future improvements based upon the benefit to the project and/or the demands
the project has placed on the roadway system.
d. The developer shall obtain all necessary permits to complete required
environmental remediation of the site and undertake said remediation pursuant to
local, state and federal regulations, as applicable.
e. The developer shall receive all other necessary permits and approvals from the City
including, but not limited to sanitary sewer, water tapping permit, demolition
permit, building permit, and erosion control permit.
7
0
f The developer shall obtain approval by the Minnehaha Creek Watershed District as
well as any other approvals required by state and federal agencies, including the
required Indirect Source Permit.
Prior to execution of the development agreement, the developer shall submit an
irrevocable letter of credit in an amount equal to 125% of the cost of all required
off-site and Phase 1 on-site improvements (excluding buildings) and evidence of
title to the property; if the developer has not obtained title to the property, the
development agreement shall also be signed by the fee owner of the property.
h. The final plat shall be submitted to the County for recording prior to initiating any
site work, including but not limited to demolition of the existing building; evidence
of filing of the final plat or other assurances pertaining to required easements shall
be presented to the City prior to issuance of any City permits.
,i. The Preliminary and Final Plat are inherent components of the Preliminary and
Final PUD approvals and are subject to the conditions of Preliminary and Final
PUD approval and the associated development plans. Access to the platted
properties shall be limited to the means provided in the approved Final PUD
plans.
All required on-site Phase I sidewalks and all on-site Phase I circulation drives
shall be completed prior to issuance, of any Occupancy Permits.
Adopted by the Ct4y Council March 18, 1996
Mayor
g.
J.
ATTEST:
Reviewed by administration:
Manager
95-51PUD:RES9
8
Approved as to fo
City Attorney
and execution:
7
EXHIBIT A -- LEGAL DESCRIPTION
That part of Gov nrmmnnt Lot 1. Snrtion 9. Tnwnnhip 117. Pangn 21. and that part of Govornme.nt
Lot E Ston 4. Tor.nsh►p 117. Rang. 21. doncribnd as hoginninq at the itorthnant corner of said
Govormmnnt Lot 1: thenro Southerly along thn E., t line of %girl Gov nrmmnnt Lot 1 a distanro of
345.06 Font: thrnr:p Westerly deflecting to tho right at an anglo of 75 doge -non 04 minutes
03 socondi a dintanrr of 54.22 foot: thnnro Wo-..torly on a tangential curvn to the right having
a radius of 716.71 feet a distance of 741.36 font; thence ilorrhwo-.terly tangnnt to last dnsrribnd
curve a distance of 723.62 Font; thpncn tlorthrrosterly on a tangential curve to the loft having a
radius of 715.59 Fpet a dintanrn of 269.70 fnet; thence Westerly nn a tangnn►ial curves to the. left
having a radius of 325.53 font a distanrn of 115.24 foot to the West lino of said Govnrmmont Lot 3;
thonce Ilorthnrly along tho West lino of said Gov ormm9nt Lot 8 to the ilnrthr.innt cornor thoreof;
thpncn Easterly along thn tlorth line of said Govnrmmont Lot 3 to thn itorthnant thoreof;
thence Southerly along the East lino of said Government Lot 3 to the point of beginning; according
to the Govormmont Survey thereof, except that part thereof which lies easterly. southeasterly and
southerly of a lino drawn parallel with and 22 foot westerly. northuontnrly. and northorly of the
/allotting described lino: Commencing at the northoast cnrner of Soction 9. Township 117. Rang, 21;
thnnro run southerly along tho past lino of said Suction 4 For a distance of 49.02 Foot: thpncn
doflect right at an angle of 90 degrees for a di:tanco of 21.27 fent; thencn d.(lnet loft at an
angle of 90 degroos For a distance of 100 feet to the actual point of beginning of the lino being
described: thence deflect right along a tangential curvet having a radius of 150 feat (delta
angle 33 degrees 29 minutes 59 seconds) for a distance of 231.64 foot: thencn deflect 1 degree
46 moo! 40 seconds right from a tangent of the last described curve for a distance of 47.99 foot;
thenen deflect 1 degree -46 minutes 40 seconds right for a distance of 76.97 Foot: thonco deflect
right along a tangential curve having a radius of 636.62 foot (delta angle 21 dogroes 09 minutes
07 seconds) For a distance of 323.91 font; thrnco defloct right along a compound curve having 0
radius of 794.51 feet (delta anglo 17 degrees 27 minutes 19 seconds) for a distance of 242.05 feet:
thencn tangnnt to said curvo for a distance of 150 feet and there torminating. o.rcopt the berth
503.00 foot of Cove rnmont Lot 3. in said Soction 4. and n•.rrpt that part of tho Wont 750 foot of
hn Macy° doscribnd property lying South of tho (surto 533.00 front of Govnrnm.•nt Lot 3. said Section.
Subject to a stroot pasemont in Favor of tho City of St. Louis Park over the East 40 fent
of the abovn prnmisos:
Subject to a spur trach oasomont in favor of Groat floc -thorn Railway Company an p .. tly
located over the above promises which easement runs in a straight lino from thn oast line of abovo
prnmisos to a point 163 feet East of the Wost line of tho above prnmisos and adjacent to tho South
Side of the building located upon the above promises which building is commonly known as Park
Space Cantor, 1626 Vernon Avenue. St. Louis Park;
Subject to the encumbrances. liens and interont nntod by the memorial underwritten or endorsed hereon:
and subloct to tho following rights or encumbrances subsisting, an provided in the twenty-fourth section
of "An act nonrorning tho registration of land and the title thereto" of tho General laws of thr State of
Minnesota for the year 1905. and the amendments thcroof. namely:
1. liens, claims or rights arising under tho laws or the constitution of the United States, which the
Statu►os of this state cannot require to appoar of record.
2. Thn lion of any tax or special assossmpnt for which the land has not boon sold at tho date of the
cortifirate of title.
3. Any lease for a period not exceeding three years. when there is actual occupation of the promises
under the lease.
4. All rights in public highways upon tho land.
5. Such right of appeal or right to appoar and contort the application as is allowod by Iaw.
6. Tho rights of any person in possession under dood or contract for deod From the owner of the
certificate of title.
1
(Torrens Cert. No. 627109)
Case 95 -51 -PUD Page 1 of 2
r -
r
EXHIBIT A -- LEGAL DESCRIPTION
Par l: The North 503.00 feet of Government Lot 8, Seetinn 4, Township 117 North, Range 21 West of the Fifth Principal Meridian,
Recording to the Government Survey thereof.
DIEJ.: That part of the West 750.00 feet of the following described property lying South of the North 503.00 Leet of Government Lot 8,
rection 4. Township 117, Range 21:
Tltnt port of Government Int 1, Section 9. Townehlp (17, Range 21. and that port of government lot 8. Section 4, Township 117, Range 21.
described as beginning it the Northeast f said Government lot 1; thence Southerly *long the Last Line of said Government
Lot 1 a dl f 345.06 feet; thence Westerly deflecting to the right •t an angle of 75 degrees 09 minutes 08 seconds • di f
56.22 feet; thence Westerly on a tangential curve to the right hnving a radius of 716.71 feet a di f 741.36 feet: thence Northwest.
tangent to lost described curve a distance of 723.68 feet: thence Northwesterly on • tangential curve to the left having • radius of 715.'
feet a distance of 269.70 feet; thence Westerly on a tangential curve to the left having • radius of 325.53 feet a distance of (15.24 fee,
to the deet line of sold Government Lot 8; thence Northerly •long the West line of said Government Lot 8 to the Northwest corner thereof
thence easterly along the North line of said Government Lot 8 to the Northeast corner thereof; thence Southerly along the Leet line of eat
Government lot 8 to the point of beginning; according to the Government Survey thereof, except that pert thereof whish lies easterly,
southeasterly and southerly of a line drawn parallel with and 22 feet westerly, northwesterly, and northerly of the following d bed 10
Commencing •t the northeast corner of Section 9, Township 117, Range 21; thence run southerly along the ease Line of said Section 9 for a
dlatnnce of 49.02 feet; thence deflect right at an angle of 90 degrees for • distance of 21.27 feet; thence deflect left at an angle of 90
degrees for • di t 100 feet to the actual point of beginning of the line being described; thence deflect right •long • tangential
curve having a radius of 150 feet (delta angle 88'29'59") for • distance of 231.69 feet; thence deflect 1'46'40" right from • tangent of 1
last described curve for a di t 47.99 feet; thence deflect 1'46'40" right for • dl f 76.97 feet; thence deflect right along
a tangential curve having a radius of 636.62 feet (delta angle 29'09'07") for a distance of 323.91 feet; thence deflect right •Long a
compound curve having • radius of 794.51 Leet (delta angle 17'27'19") for • distance of 242.05 feet; thence tangent to said curve for •
distance of 150 feet end there terminating.
Subject to s street eseement in favor of the City of St. f.nu(e Park over the West 33 feet of the above premises:
Subject to • spur track easement in favor of Great Northern Railway Company as p ly located over the above premises which
^nsemnnt runs in a straight line from the east line of above premises to • point 163 feet East of the West line of the above premises and
wljecene to the South side of the building 1 d upon the above premises which building is commonly known as Perk Space Center, 1626 1
Vernon A , St. Louis Perk; •
(Torrens Cert No. 611984)
Case NO. 95 -51 -PUD Page 2 of 2
r
1
1
EXHIBIT B
Proposed Improvements Estimated Assessment
A. Right tum lane on eastbound
16th St. W. at the proposed
easterly access to the Park
Place Plaza retail project
including concrete curb and
gutter, bituminous street,
pavement markings, traffic
signal modifications, turf
restoration, and other
improvements as shown on
Exhibit C; a right tum lane on
eastbound 16th St. W. at Park
Place Blvd.including concrete
curb and gutter, bituminous
street, pavement markings,
traffic signal modifications, turf
restoration, and other
improvements as shown on
Exhibit C.
B. Right tum lane on southbound
Park Place Blvd. at 16th St. W.
including concrete curb and
gutter, bituminous street, street
light relocation, concrete
retaining wall, storm sewer,
pavement markings, signal
modifications, turf restoration,
and other improvements,
as well as the extension
westerly of the concrete median
located on 16th St. W. at Park
Place Blvd., all of which are shown
on Exhibit C
6
$60,000
(100% of total cost of this
improvement assessed to
property owner)
$45,000
(45% of total cost of
this improvement
assessed to property
owner)
Proposed Improvements
C. Improvements/modifications to the left
tum lane on northbound Park Place
Blvd. at 16th St. including concrete
curb and gutter, bituminous street,
pavement markings, traffic signal
modifications and other improvements
as shown on Exhibit C.
D. Improvements to Park Place Blvd.
north and south of Gamble Drive
including bituminous street, concrete
curb and gutter, street light relocation,
concrete median, storm sewer, pave-
ment markings, traffic signal modifica-
tion and other improvements as shown
on Exhibit C.
E. Right tum lane improvements on
southbound Park Place Blvd. at
Cedar Lake Road including bituminous
street, concrete curb and gutter, storm
sewer, pavement markings, turf
restoration and other items as shown
on Exhibit C.
F. Left turn lane improvements on south-
bound Park Place Blvd. at Cedar Lake
Road including concrete curb and gutter,
bituminous street, concrete median,
traffic signal modifications and other
items as shown on Exhibit C.
G. Concrete sidewalk (5 feet wide)
located along the north side of Cedar
Lake Road, between Park Place Blvd.
and Zarthan Ave., along the west
side of Park Place Blvd. between
Cedar Lake Road and 16th St. W.,
along the south side of 16th St. W.
from Park Place Blvd. to Zarthan
Ave., and along the east side of
Zarthan Ave. between 16th St. W. and
Cedar Lake Road, all of which are shown
on Exhibit C.
7332 GEN56
Estimated Assessment
$12,500
(100% of total cost of this
improvement assessed to
property owner)
$127,500
(100% of total cost of this
improvement assessed to
property owner)
$3,600
(16% of total cost
of this improvement
assessed to property
owner)
$5,600
(25% of total cost of
this improvement
assessed to property
owner)
$66, 500
(100% of total cost of
this improvement
assessed to property
owner)
Total estimated $320,700
amount of special
assessments to be
assessed against
the subject property