RESOLUTION NO. 4719
JANUARY 2, 1973
3B
RESOLUTION AMENDING RESOLUTION 4557 GRANTING
PERMIT UNDER SECTION 6:176.3 OF THE ST. LOUIS
PARK ZONING ORDINANCE FOR INDUSTRIAL DEVELOPMENT
UNIT, DALQUIST INDUSTRIAL PARK
BE IT RESOLVED by the City Council of the City of St. Louis Park
that Resolution 4557 adopted June 26, 1972, granting permit under Section
6:176.3 of the St. Louis Park Zoning Ordinance for Industrial Development
Unit be amended to read as follows:
WHEREAS, application has been made to the City Council by Northland
Aluminum Products, Inc., for permit under Section 6:176.3 of the St.
Louis Park Zoning Ordinance for the following purpose:
To use land in the I-1 District for an Industrial Development Unit
at the following location:
Southeast quadrant of Highway 7 and Highway 100, Dalquist
Industrial Park
WHEREAS, the Council has considered the advice and recommendations of
the Planning Commission and the effect of the proposed use on the health,
safety and welfare of the occupants of the surrounding lands, existing and
anticipated traffic conditions, including parking facilities on adjacent
streets, and the effect of the proposed use on the Comprehensive Plan,
therefore
BE IT RESOLVED by the City Council of the City of St. Louis Park that
it is hereby determined that the said proposed use will not be detrimental
to the health, safety or general welfare of the community nor will it
seriously depreciate surrounding property values, and the same is in harmony
with the general purpose and intent of this ordinance and the Comprehensive
Plan, and
BE IT FURTHER RESOLVED that permit is hereby granted to the applicant
for the purpose above set forth upon condition:
1. That the site be developed, used and maintained in
accordance with Exhibit "A", Plat; Exhibit "B", Master
Plan; Exhibit "C", General Drainage Plan; Exhibit "D",
Northland Aluminum Co. warehouse Site -Plan -Landscape
Plan; Exhibit "E", Northland Aluminum Co. warehouse
Floor Plan and elevation plan; Exhibit "F", Maid of
Scandinavia Site Plan -landscape Plan; Exhibit "G",
Maid of Scandinavia Elevation Plan; and Exhibit "H",
Maid of Scandinavia Garage Plan, as modified on
June 2, 1972 by the Planning Department and except
as said exhibits and conditions may be hereinafter
modified or modified by the conditions under the plat.
2. All electric, gas, water, sanitary sewer, telephone
and other utilities shall be placed underground.
3. The private roadway with a minimum width of 24 feet
shall have a poured -in-place concrete curb at least
6 inches high. Said road and curb shall be constructed
at standards acceptable to the City Engineer. Said road
shall be designated as a fire lane, shall not be used for
parking and shall be kept clean and free from potholes
and maintained thereafter.
4. Signs shall be limited to name plate signs, symbols, logos
and architectural features that identify a particular
business, service or good which is provided on the site.
All the signs shall meet the following conditions:
a. Billboards are hereby prohibited.
b. All new signs are to be integrated with the architecture
of the buildings and there shall be no more than one
free standing sign per lot and said sign shall not
exceed 200 square feet in total sign area and 25 feet
in height. The pylon (elevator) is excluded from this
requirement.
c. Lighting for signs shall be interior or indirect so that
light rays are not directly visible beyond the lot lines.
5. New buildings in the development and any major alteration or
modification to the existing building shall be done so that
the architectural treatment of the exterior of the building is
equal in standard or exceeds the standard set by the existing
building on Lot 2 and the proposed building on Lot 1.
6. All improvements shall be completed in accordance with the
following schedule:
a. The private road including the curbing, surfacing and
landscaping shall be completed by September, 1973.
b. All improvements on Lot. 1 and Lot 3 shall be completed
by October 30, 1973.
c. Parking on Lot 4 necessary to meet minimum parking
requirements for the development on Lots 1, 2, and
3 shall be completed including curbing, landscaping,
asphalt and striping shall be completed by October 30,
1973.
d. The decorative street lighting and lighting in the
parking lots and pedestrian area shall be completed
by June 10, 1974.
7. The city shall be given the necessary easement for a
north -south pedestrian walkway at least 30 feet wide
in the vicinity of Ottawa or Princeton within 60
days after the specific location is approved by the
City Council.
8. There shall be no outside storage of equipment, raw
materials, chemicals, or waste.
9. All rooftop equipment shall be screened.
10. That all air pollution problems be resolved and complete
cooperation be given to the Health Department in rectifying
odor problems.
11. That proper measures be taken to prevent occupational
health and safety problems.
12. That Lot 3, Block 1, Dalquist Industrial Park shall be
developed, used, and maintained in accordance with the
above exhibits and as amended by Exhibit "I" 1972
Construction Master Plan; Exhibit "J", Site Plan; and
Exhibit "K" Elevation Plan, with the following condition:
a. That all improvements on Lot 3, including
buildings and parking lot surfacing and
striping, shall be completed by October 30, 1973.