HomeMy WebLinkAbout304 - ADMIN Resolution - City Council - 1956/10/011
1
1
Resolution No. 303 - Continued
The City shall, in addition to paying its proportionate share of the
cost of the proposed work, obtain at its sole cost and expense all necessary
right of way easements and construction permits for the work to be performed
outside the limits of the trunk highway or established City streets, together
with all drainage outlet rights where necessary. Such easements, permits and
rights shall be obtained and satisfactory evidence thereof furnished the De-
partment of Highways before any contract for the proposed work is awarded.
Resolution No. 304 Adopted October 1, 1956
SETTING HEARING ON PROPOSED WATER MAIN
CONSTRUCTION
RESOLVED by the City Council that the Clerk be directed_to publish
notice of hearing, to be held at the Council meeting October 15, 1956, on the
following proposed improvements
WATER MAIN CONSTRUCTION
Impr. No. Estimated cost
12" water main
56-89 In_Edgewood Avenue from Elliot View Road to
Great Northern R. R. $14,949.00
The area to be assessed for the 12" water main is as follows:
Commencing at the intersection of Franklin Avenue and Hampshire
Avenue and continuing East on Franklin Avenue to Edgewood Avenue, thence
North on Edgewood Avenue to a point where 18th Street would intersect Edge --
wood Avenue, thence East on this line to the East line of Section 4, Township
117, Range 21, thence South on this line to the North boundary of the Great
Northern Railroad right-of-way, thence West on the North boundary of the right-
of-way of the Great Northern Railroad to a point where Hampshire Avenue would
intersect the right-of-way, thence North along Hampshire Avenue to the point
of beginning.
CURB AND GUTTER AND SIDEWALK CONSTRUCTION
Im r. No. Estimated cost
56-90 Eastside Brookside Avenue from Excelsior Blvd. South
to existing Curb and Sidewalk $ 1,568.20